The Prospector News

Awalé Hits 43.7 g/t Gold Equivalent Below the BBM Open Pit with Initial Deeper Holes Pointing to Underground Growth

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Awalé Hits 43.7 g/t Gold Equivalent Below the BBM Open Pit with Initial Deeper Holes Pointing to Underground Growth

 

 

 

 

 

Highlights

  • The first two holes drilled below the BBM open pit intersected strong gold mineralization, confirming the deposit continues at depth.
  • These are the first two of twelve holes following BBM’s high-grade core, which steepens at depth, down to 600 metres below surface. Results from the remaining ten holes are expected over the coming weeks.
  • Results include:
    • 7m @ 7.21 g/t gold equivalent from 385m downhole, including 1m @ 43.68 g/t gold equivalent, the highest grade drilled to date at BBM (BBDD-31)
    • 46m @ 2.35 g/t gold equivalent from 364m downhole, including 17m @ 3.41 g/t gold equivalent (BBDD-30)
  • These initial holes build confidence that BBM has a meaningful underground component beyond the open pit.
  • Seven rigs are turning at Odienné. A separate update on Charger and Awalé’s 100%-owned exploration ground, including first drilling at Seydou and follow-up at the Fremen discovery, will follow shortly.

 

Awalé Resources Limited (TSX-V: ARIC) (OTCQX: AWLRF) (FSE: 2F60) is pleased to report the first assay results from deeper drilling at the BBM gold-copper deposit at the Odienné Project in Côte d’Ivoire. The results confirm that BBM’s high-grade core continues below the current open pit Mineral Resource and point to an emerging underground component of the deposit.

 

The two holes reported today are the first of a twelve-hole program drilled below and beyond the open pit Mineral Resource. The program follows BBM’s high-grade core, which is interpreted to have a steeper plunge, to an initial vertical depth of 600 metres below surface. Assays for the remaining ten holes are pending (see plan map and long section in Figures 2 and 3).

 

“BBM is delivering. The first holes below the open pit hit where we expected and returned the highest gold grade drilled at the deposit to date. This tells us the high-grade core continues at depth and reinforces our belief that the system has more to give. With ten more holes from this program at the lab, we look forward to showing shareholders how BBM grows from here,” stated Andrew Chubb, President and CEO of Awalé Resources.

 

“There is a lot happening at Odienné and we expect to follow shortly with a separate update on Charger and our 100%-owned exploration ground, including first drilling at Seydou and follow-up at the Fremen discovery.”

 

Link to All Figures

 

Watch Video of CEO Andrew Chubb Discussing Results

 

BBM Deeper Drilling

 

This deeper drilling program is designed to test whether BBM’s high-grade core continues below the open pit Mineral Resource. The first two holes support this interpretation. Both intersected the mineralized structure where predicted, supporting the interpreted steeper plunge of the high-grade core and the emerging underground potential of the BBM system. The program will also test parallel zones that could contribute to future underground Mineral Resource growth.

 

Further step-out drilling to the northwest (NW) will test for a second plunging shoot, following up on hole BBDD-20, which returned 3.3 g/t AuEq. over 38 metres from 447 metres downhole, including 6.4 g/t AuEq. over 6 metres (see February 27, 2026 news release). Subsequent deeper drilling is planned to extend the underground target to 800 metres below surface.

 

Table 1: Significant Intercepts from Diamond Drilling – (from this release)

 

Hole ID From
(m)
To
(m)
Length
(m)
Au
(g/t)
Cu
(%)
Ag
(g/t)
Mo
(ppm)
AuEq.
(g/t)
Composite
Trigger
(Au g/t)
BBDD0030 356.00 357.00 1.00 0.56 0.03 0.28 114 0.61 0.50
364.00 410.00 46.00 1.93 0.39 1.78 444 2.35 0.50
including 371.00 409.00 38.00 2.24 0.46 2.09 529 2.74 1.00
and 371.00 388.00 17.00 2.93 0.45 2.01 791 3.41 1.00
and 374.00 376.00 2.00 6.23 0.48 1.31 651 6.74 5.00
and 392.00 393.00 1.00 3.59 1.05 4.08 361 4.71 2.00
and 399.00 407.00 8.00 2.17 0.50 2.46 410 2.70 2.00
BBDD0031 265.00 266.00 1.00 2.43 0.34 2.04 2 2.80 0.50
351.00 355.00 3.00 0.73 0.19 1.60 40 0.94 0.50
385.00 392.00 7.00 7.04 0.16 0.88 94 7.21 0.50
including 388.00 389.00 1.00 43.48 0.19 1.84 106 43.68 5.00
401.00 437.00 36.00 1.51 0.47 2.14 391 2.01 0.50
including 427.00 437.00 10.00 2.46 0.50 3.25 374 2.99 2.00
496.00 497.96 1.96 0.53 0.01 0.84 12 0.55 0.50

 

 

Table 2: BBM Drill Collar Details – (all collars from this release)

 

Hole ID Easting Northing RL (m) Azimuth_True Dip EOH (m)
BBDD0030 655688.9 1048045.4 418.7 32 -62 500.2
BBDD0031 655632.1 1048068.1 421.5 25 -62 497.9

 

 

About Awalé Resources

 

Awalé Resources is a diligent and systematic mineral exploration company focused on discovering large-scale gold and gold-copper deposits in Côte d’Ivoire. The Company’s flagship Odienné Project now hosts an initial inferred Mineral Resource Estimate1 of 1.71 million ounces gold equivalent across the BBM, Charger, and Empire deposits (32.4 Mt at 1.33 g/t Au and 0.33% Cu), providing a strong foundation for ongoing growth and future economic studies.

 

The Odienné Project covers 2,346 km2 across seven permits, including 797 km2 held under the Awalé-Newmont Joint Venture. Awalé manages exploration activities across the joint venture area, with funding currently provided by Newmont Ventures Limited under the Exploration Agreement signed in May 2022.

 

In addition to the current resource base defined on the joint venture ground, Awalé controls a substantial 100%-owned land position across the broader Odienné district, where multiple untested and early-stage targets provide additional potential discovery upside. Across the Project, Awalé has identified multiple gold and copper-gold systems and continues to build a pipeline of targets with potential to support further discoveries and resource growth.

 

With a skilled and experienced technical team, Awalé is advancing exploration in an underexplored and pro-mining jurisdiction with clear potential for district-scale discoveries.

 

Quality Control and Assurance

 

Analytical work for drill samples is being carried out at the independent Intertek Laboratories in Ghana and Australia, an ISO 17025 Certified Laboratory. Samples are prepared and stored at the Company’s field camps and put into sealed bags until collected by Intertek from the Company’s secure Odienné office and transported by Intertek to their preparation laboratory in Yamoussoukro, Côte d’Ivoire, for preparation. Samples are logged in the tracking system, weighed, dried, and pulverized to greater than 85%, passing a 75-micron screen. Two pulps are prepared from each sample with one stream to Intertek Ghana for fire assay and a second to Australia where the sample is analyzed by 52 element ICP/MS with a 4-Acid digest. Blanks, duplicates, and certified reference material (standards) are being used to monitor laboratory performance during the analysis. Where visible gold is observed in drill core, a quartz wash is applied between every sample to reduce or eliminate any contamination. Once fire assay results are received, samples over 5 g/t gold are routinely screen fire assayed, samples lower than 5 g/t gold continued within a high-grade interval are also screen fire assayed.

 

Mineralized Interval Calculations

 

Significant intervals reported in this news release are calculated as downhole length-weighted intercepts. For the BBM target, initial mineralized zones are calculated at a 0.5 g/t Au trigger and include up to 3 metres of internal waste for delineating mineralized zones. Included intervals are calculated at 1 g/t Au, 2 g/t Au, 5 g/t Au, and 10 g/t Au trigger values, with up to 3 metres of internal waste. Table 2 contains a list of all BBM holes reported in this release. True widths are estimated to be 70% of the downhole widths. Holes not reported do not make a 0.5 g/t Au grade trigger.

 

Gold Equivalent Calculation for BBM Deposit

 

Gold equivalent has been calculated using the same assumptions as the Mineral Resource Estimate (MRE), including a gold price of US$3,000/oz, a copper price of US$4.34/lb, gold recovery of 86%, and copper recovery of 93%, based on the average results of ongoing metallurgical testwork.

 

Gold equivalent equation: AuEq. g/t = (1 x Au) + (1.065793 x Cu%)

 

Qualified Person

 

The technical and scientific information contained in this news release has been reviewed and approved for release by Andrew Chubb, the Company’s Qualified Person as defined by National Instrument 43-101. Mr. Chubb is the Company’s Chief Executive Officer and holds an Economic Geology degree, is a Member of the Australian Institute of Geoscientists (AIG), and is a Member of the Society of Economic Geoscientists (SEG). Mr. Chubb has over 25 years of experience in international mineral exploration and mining project evaluation.

 

Posted July 20, 2026

Share this news article

MORE or "UNCATEGORIZED"


Blue Lagoon Surpasses $10 Million In Revenue As Dome Mountain Production Rises To 125 Tonnes Per Day

Blue Lagoon Resources Inc. (CSE:BLLG) (OTCQB:BLAGF) (FSE:7BL) has... READ MORE

July 20, 2026

Kapa Gold Announces Closing of Second and Final Tranche of Private Placement

KAPA GOLD INC. (TSX-V: KAPA) is pleased to announce that, further... READ MORE

July 20, 2026

Evolve Royalties Secures Revolving Credit Facility for Up to US$75 Million

Evolve Royalties Ltd. (CSE: EVR) (OTCQX: EVRYF) is pleased to ann... READ MORE

July 20, 2026

Seabridge Gold Arranges US$100M Credit Facility to Support Ongoing Activities at KSM

Seabridge Gold Inc. (TSX: SEA) (NYSE: SA) has executed an unsec... READ MORE

July 20, 2026

Eastport Critical Metals Confirms Extensive Copper Mineralisation at Flagship Matsitama Copper Project with Multiple Intercepts Exceeding 100 Metres

Phase One infill drilling has successfully confirmed the continui... READ MORE

July 20, 2026

Copyright 2026 The Prospector News