
Highlights
Awalé Resources Limited (TSX-V: ARIC) (OTCQX: AWLRF) (FSE: 2F60) is pleased to report the first assay results from deeper drilling at the BBM gold-copper deposit at the Odienné Project in Côte d’Ivoire. The results confirm that BBM’s high-grade core continues below the current open pit Mineral Resource and point to an emerging underground component of the deposit.
The two holes reported today are the first of a twelve-hole program drilled below and beyond the open pit Mineral Resource. The program follows BBM’s high-grade core, which is interpreted to have a steeper plunge, to an initial vertical depth of 600 metres below surface. Assays for the remaining ten holes are pending (see plan map and long section in Figures 2 and 3).
“BBM is delivering. The first holes below the open pit hit where we expected and returned the highest gold grade drilled at the deposit to date. This tells us the high-grade core continues at depth and reinforces our belief that the system has more to give. With ten more holes from this program at the lab, we look forward to showing shareholders how BBM grows from here,” stated Andrew Chubb, President and CEO of Awalé Resources.
“There is a lot happening at Odienné and we expect to follow shortly with a separate update on Charger and our 100%-owned exploration ground, including first drilling at Seydou and follow-up at the Fremen discovery.”
Watch Video of CEO Andrew Chubb Discussing Results
BBM Deeper Drilling
This deeper drilling program is designed to test whether BBM’s high-grade core continues below the open pit Mineral Resource. The first two holes support this interpretation. Both intersected the mineralized structure where predicted, supporting the interpreted steeper plunge of the high-grade core and the emerging underground potential of the BBM system. The program will also test parallel zones that could contribute to future underground Mineral Resource growth.
Further step-out drilling to the northwest (NW) will test for a second plunging shoot, following up on hole BBDD-20, which returned 3.3 g/t AuEq. over 38 metres from 447 metres downhole, including 6.4 g/t AuEq. over 6 metres (see February 27, 2026 news release). Subsequent deeper drilling is planned to extend the underground target to 800 metres below surface.
Table 1: Significant Intercepts from Diamond Drilling – (from this release)
| Hole ID | From (m) |
To (m) |
Length (m) |
Au (g/t) |
Cu (%) |
Ag (g/t) |
Mo (ppm) |
AuEq. (g/t) |
Composite Trigger (Au g/t) |
| BBDD0030 | 356.00 | 357.00 | 1.00 | 0.56 | 0.03 | 0.28 | 114 | 0.61 | 0.50 |
| 364.00 | 410.00 | 46.00 | 1.93 | 0.39 | 1.78 | 444 | 2.35 | 0.50 | |
| including | 371.00 | 409.00 | 38.00 | 2.24 | 0.46 | 2.09 | 529 | 2.74 | 1.00 |
| and | 371.00 | 388.00 | 17.00 | 2.93 | 0.45 | 2.01 | 791 | 3.41 | 1.00 |
| and | 374.00 | 376.00 | 2.00 | 6.23 | 0.48 | 1.31 | 651 | 6.74 | 5.00 |
| and | 392.00 | 393.00 | 1.00 | 3.59 | 1.05 | 4.08 | 361 | 4.71 | 2.00 |
| and | 399.00 | 407.00 | 8.00 | 2.17 | 0.50 | 2.46 | 410 | 2.70 | 2.00 |
| BBDD0031 | 265.00 | 266.00 | 1.00 | 2.43 | 0.34 | 2.04 | 2 | 2.80 | 0.50 |
| 351.00 | 355.00 | 3.00 | 0.73 | 0.19 | 1.60 | 40 | 0.94 | 0.50 | |
| 385.00 | 392.00 | 7.00 | 7.04 | 0.16 | 0.88 | 94 | 7.21 | 0.50 | |
| including | 388.00 | 389.00 | 1.00 | 43.48 | 0.19 | 1.84 | 106 | 43.68 | 5.00 |
| 401.00 | 437.00 | 36.00 | 1.51 | 0.47 | 2.14 | 391 | 2.01 | 0.50 | |
| including | 427.00 | 437.00 | 10.00 | 2.46 | 0.50 | 3.25 | 374 | 2.99 | 2.00 |
| 496.00 | 497.96 | 1.96 | 0.53 | 0.01 | 0.84 | 12 | 0.55 | 0.50 |
Table 2: BBM Drill Collar Details – (all collars from this release)
| Hole ID | Easting | Northing | RL (m) | Azimuth_True | Dip | EOH (m) |
| BBDD0030 | 655688.9 | 1048045.4 | 418.7 | 32 | -62 | 500.2 |
| BBDD0031 | 655632.1 | 1048068.1 | 421.5 | 25 | -62 | 497.9 |
About Awalé Resources
Awalé Resources is a diligent and systematic mineral exploration company focused on discovering large-scale gold and gold-copper deposits in Côte d’Ivoire. The Company’s flagship Odienné Project now hosts an initial inferred Mineral Resource Estimate1 of 1.71 million ounces gold equivalent across the BBM, Charger, and Empire deposits (32.4 Mt at 1.33 g/t Au and 0.33% Cu), providing a strong foundation for ongoing growth and future economic studies.
The Odienné Project covers 2,346 km2 across seven permits, including 797 km2 held under the Awalé-Newmont Joint Venture. Awalé manages exploration activities across the joint venture area, with funding currently provided by Newmont Ventures Limited under the Exploration Agreement signed in May 2022.
In addition to the current resource base defined on the joint venture ground, Awalé controls a substantial 100%-owned land position across the broader Odienné district, where multiple untested and early-stage targets provide additional potential discovery upside. Across the Project, Awalé has identified multiple gold and copper-gold systems and continues to build a pipeline of targets with potential to support further discoveries and resource growth.
With a skilled and experienced technical team, Awalé is advancing exploration in an underexplored and pro-mining jurisdiction with clear potential for district-scale discoveries.
Quality Control and Assurance
Analytical work for drill samples is being carried out at the independent Intertek Laboratories in Ghana and Australia, an ISO 17025 Certified Laboratory. Samples are prepared and stored at the Company’s field camps and put into sealed bags until collected by Intertek from the Company’s secure Odienné office and transported by Intertek to their preparation laboratory in Yamoussoukro, Côte d’Ivoire, for preparation. Samples are logged in the tracking system, weighed, dried, and pulverized to greater than 85%, passing a 75-micron screen. Two pulps are prepared from each sample with one stream to Intertek Ghana for fire assay and a second to Australia where the sample is analyzed by 52 element ICP/MS with a 4-Acid digest. Blanks, duplicates, and certified reference material (standards) are being used to monitor laboratory performance during the analysis. Where visible gold is observed in drill core, a quartz wash is applied between every sample to reduce or eliminate any contamination. Once fire assay results are received, samples over 5 g/t gold are routinely screen fire assayed, samples lower than 5 g/t gold continued within a high-grade interval are also screen fire assayed.
Mineralized Interval Calculations
Significant intervals reported in this news release are calculated as downhole length-weighted intercepts. For the BBM target, initial mineralized zones are calculated at a 0.5 g/t Au trigger and include up to 3 metres of internal waste for delineating mineralized zones. Included intervals are calculated at 1 g/t Au, 2 g/t Au, 5 g/t Au, and 10 g/t Au trigger values, with up to 3 metres of internal waste. Table 2 contains a list of all BBM holes reported in this release. True widths are estimated to be 70% of the downhole widths. Holes not reported do not make a 0.5 g/t Au grade trigger.
Gold Equivalent Calculation for BBM Deposit
Gold equivalent has been calculated using the same assumptions as the Mineral Resource Estimate (MRE), including a gold price of US$3,000/oz, a copper price of US$4.34/lb, gold recovery of 86%, and copper recovery of 93%, based on the average results of ongoing metallurgical testwork.
Gold equivalent equation: AuEq. g/t = (1 x Au) + (1.065793 x Cu%)
Qualified Person
The technical and scientific information contained in this news release has been reviewed and approved for release by Andrew Chubb, the Company’s Qualified Person as defined by National Instrument 43-101. Mr. Chubb is the Company’s Chief Executive Officer and holds an Economic Geology degree, is a Member of the Australian Institute of Geoscientists (AIG), and is a Member of the Society of Economic Geoscientists (SEG). Mr. Chubb has over 25 years of experience in international mineral exploration and mining project evaluation.
Blue Lagoon Resources Inc. (CSE:BLLG) (OTCQB:BLAGF) (FSE:7BL) has... READ MORE
KAPA GOLD INC. (TSX-V: KAPA) is pleased to announce that, further... READ MORE
Evolve Royalties Ltd. (CSE: EVR) (OTCQX: EVRYF) is pleased to ann... READ MORE
Seabridge Gold Inc. (TSX: SEA) (NYSE: SA) has executed an unsec... READ MORE
Phase One infill drilling has successfully confirmed the continui... READ MORE