Michael

Lahontan Gold Announces Updated Santa Fe Preliminary Economic Assessment Featuring an Eleven-Year Mine Life and Post-Tax NPV of US$820 Million

          Lahontan Gold Corp. (TSX-V:LG) (OTCQB:LGCXF) is pleased to announce results from a positive Preliminary Economic Assessment on its flagship Santa Fe Mine gold-silver project located in Nevada’s prolific Walker Lane. The PEA was prepared by …

Auriginal Intersects 45.5 m of 1.05 g/t Au and 29.4 m of 1.32 g/t Au at Roger, Extending Gold-Copper Mineralization at Depth; Updated Mineral Resource Estimate Expected Before Year-End 2026

          Assays from the final three Phase 1 holes (AUR-26-08 to AUR-26-10) and the first Phase 2 hole to be reported (AUR-26-12) returned broad gold-copper mineralization in every hole, beginning near surface and persisting to approximately …

Tectonic Metals Drills 2.41 g/t Au Over 59.44 Metres, Including 11.82 g/t Au Over 10.67 Metres and 39.96 g/t Au Over 3.05 Metres at Alpha Bowl, Flat Gold Project, Alaska

          Broad Gold Mineralization Starts at Surface, Returning 1.86 g/t Au Over 80.77 Metres and Ending in Mineralization; Adit Zone Drilling Intersects 1.52 g/t Au Over 42.67 Metres, Including 27.35 g/t Au Over 1.52 Metres and 3.84 …

Tower Intersects 20.3 m of 3.13 g/t Au, Including 8.0 m of 7.16 g/t Au, at Rabbit North’s Blue Sky Zone

          Drilling also returns 134.0 m of 0.65 g/t Au in the Lower Domain; near-surface, sub-horizontal and structurally thickened mineralization supports open-pit potential   Tower Resources Ltd. (TSX-V: TWR) is pleased to report the gold results from Holes …

Our analysts

Christian

Bio Articles