The Prospector News

Aura Secures Additional US$31 million in Financing and Announces Fully Funded Construction for the Borborema Project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Aura Secures Additional US$31 million in Financing and Announces Fully Funded Construction for the Borborema Project

 

 

 

 

 

Aura Minerals Inc. (TSX: ORA) (B3: AURA33) (OTCQX: ORAAF) is pleased to announce that Borborema Inc. a wholly owned subsidiary and indirect owner of the Company’s Borborema gold project in Rio Grande do Norte State, Brazil, has entered into an agreement with Gold Royalty Corp. to secure US$31 million in financing to develop the Borborema Project. The US$31 million in financing is composed of a US$21 million net smelter return royalty over the Borborema Project and a US$10 million gold-linked loan.

 

Together with the US$100 million term loan previously entered into with Banco Santander Brazil and US$14 million raised through gold collars with several financial institutions, Aura, through its subsidiaries, has now secured over US$145 million towards construction of the Borborema Project, which has an estimated total construction capex of US$188 million.

 

Key Financing Terms

 

NSR Royalty:

  • Upfront Payment: US$21.0 million in cash upon closing of the Transaction.
  • Royalty Terms: Gold Royalty acquired a secured 2.0% net smelter return royalty on the first 725,000 ounces produced from the Borborema Project.
  • Stepdown: The NSR Royalty will decrease to 0.5% after 725,000 ounces of payable gold is produced from the Borborema Project.
  • Buyback Option: The remaining 0.5% of the NSR Royalty will be subject to a US$2.5 million buyback at Borborema’s option exercisable by Borborema after the earlier to occur of (i) of 2,250,000 ounces of payable gold being produced at the Borborema Project, or (ii) January 1, 2050.
  • Pre-production Payments: Borborema will make quarterly payments to Gold Royalty of 250 ounces of gold (1,000 ounces per year). The pre-production payments will cease upon the earlier of (i) the date of commencement of commercial production of the Borborema Project; and (ii) the tenth (10th) year anniversary of the closing of the Transaction.
  • ESG Co-Investment Payments: Gold Royalty will make ongoing payments to Borborema of US$30 per gold equivalent ounce delivered or paid to Gold Royalty. These payments are earmarked for ESG related investments by Borborema, up to a maximum of US$300,000.

 

Gold-Linked Loan:

  • Loan Principal: US$10.0 million paid to Borborema in cash upon closing of the Transaction.
  • Maturity: 6 years from closing of the Transaction.
  • Prepayment: The loan can be prepaid at any time commencing on the 24 month of the closing of the Transaction subject to certain prepayment costs.
  • Quarterly Interest Payments: Quarterly coupon payments of minimum 110 ounces of gold (440 ounces per year). Coupon payments can be made via cash settlement or physical delivery of gold.
  • Conversion: Upon maturity, Gold Royalty has the option to be:
    • Paid US$10 million cash; or
    • Paid US$5 million in cash plus receive a 0.5% net smelter return royalty over the Borborema Project.
  • Security: The Gold-Linked Loan will be secured against certain mining concessions relating to the Borborema Project and a pledge of the shares of the Borborema operating entity, with the Company’s interests thereunder subordinated to senior project financing lenders. The Gold-Linked Loan is also guaranteed by Aura.

 

Rodrigo Barbosa, President & CEO commented, “We have successfully concluded our financing plan for the Borborema project with an additional US$31 million from Royalty and Gold Loan Agreements, bringing our total external funding to US$ 145 million. This amount, together with our own cash fully addresses the projected US$188 million capital expenditure. This diversified funding strategy, which encompasses debt, royalty, gold loan, and positive collars, aligns perfectly with our goal to mitigate financial risks while enhancing shareholder equity returns.”

 

Completion of the Transaction is subject to customary conditions and is currently expected to be completed in December 2023, with an outside date of January 31, 2024.

 

About Aura 360° Mining

 

Aura is focused on mining in complete terms – thinking holistically about how its business impacts and benefits every one of our stakeholders: our company, our shareholders, our employees, and the countries and communities we serve. We call this 360° Mining.

 

Aura is a mid-tier gold and copper production company focused on the development and operation of gold and base metal projects in the Americas. The Company’s four producing assets include the San Andres gold mine in Honduras, the EPP and the Almas gold mines in Brazil and the Aranzazu copper-gold-silver mine in Mexico. In addition, the Company has the Tolda Fria gold project in Colombia and four projects in Brazil, of which three gold projects: Borborema and Matupá, which are in development; and São Francisco, which is on care and maintenance. The Company also owns the Serra da Estrela copper project in Brazil, Carajás region, under exploration stage.

 

Posted December 6, 2023

Share this news article

MORE or "UNCATEGORIZED"


South Pacific Metals Extends the Mineralized Structures at Megabe to More than 300 Metres of Confirmed Strike Length; Structures Open Along Strike and at Depth

Step-out drilling places SPMC on the upper margin of a potential ... READ MORE

August 24, 2026

North Arrow Extends Target AE Strike Length to 1000 m and Completes Rotation 3 Regional RC Drilling, Kraaipan Gold Project, Botswana

New surface targets identified North Arrow Minerals Inc. (... READ MORE

August 24, 2026

USA Rare Earth Announces Completion of Upsized $1.55 Billion Capitalization of the U.S. Government-Backed Special Purpose Vehicle for Serra Verde Offtake

U.S. Department of War (DoW) provides a $750 million investment i... READ MORE

August 24, 2026

Lavras Gold Intersects High-Grade Gold at Caneleira, Supporting Near-Surface Continuity of the Vein System

Hole 26CN044 returns 24.30 g/t gold over a drilled width of 9 met... READ MORE

August 24, 2026

Ivanhoe Electric Receives Preliminary Project Letter from the Export-Import Bank of the United States for $1.1 Billion in Potential Debt Financing for the Santa Cruz Copper Project

Letter Provides Increased Potential Debt Financing from $825 Mill... READ MORE

August 24, 2026

Copyright 2026 The Prospector News