Atico Mining Corporation (TSX-V: ATY) (OTCQX: ATCMF) announces its operating results for the three months ended March 31, 2024 from its El Roble mine. Production for the quarter totaled 3.34 million pounds of copper and 2,156 ounces of gold in concentrates, an increase of 44% for copper and a decrease of 16% for gold, respectively, over the same period in 2023.
“The El Roble mine operated in line with set expectations for this quarter as we improved on almost all metrics over the same period last year,” said Fernando E. Ganoza, CEO. “For the remainder of the year, the team will be focused on optimizing production to take advantage of the higher metal price environment and to deliver on this year’s set guidance. In parallel, we continue to drill new high-grade resources in the mine vicinity target areas. These new areas will be incorporated into our mine plan as well as the new resource update which is planned to be published imminently.”
First Quarter Operational Highlights
First Quarter Operational Details
Q1 2024 Total |
Q1 2023 Total |
% Change | |
Production (Contained in Concentrates) | |||
Copper (000s pounds) | 3,338 | 2,319 | 44% |
Gold (ounces) | 2,156 | 2,566 | -16% |
Mine | |||
Tonnes of ore mined | 64,873 | 60,568 | 7% |
Mill | |||
Tonnes processed | 65,787 | 62,793 | 5% |
Tonnes processed per day | 811 | 747 | 9% |
Copper grade (%) | 2.51 | 1.88 | 34% |
Gold grade (g/t) | 1.64 | 2.20 | -25% |
Recoveries | |||
Copper (%) | 91.8 | 89.2 | 3% |
Gold (%) | 62.1 | 57.9 | 7% |
Concentrates | |||
Copper and Gold Concentrates (dmt) | 8,274 | 5,813 | 42% |
Payable copper produced (000s lbs) | 3,137 | 2,180 | 44% |
Note: Metal production figures are subject to adjustments based on final settlement. The reported results are preliminary in nature and are awaiting independent lab verification.
Concentrate Inventory
The number of shipments the Company can export in any given quarter depends on several variables some of which the Company does not control, hence there may be an inherent variability in tonnes shipped quarter to quarter.
Q1 2024 Total | |
Amounts in dry metric tonnes | |
Opening inventory | 8,227 |
Production | 8,274 |
Sales | -9,383 |
Number of shipments | 1 |
Closing inventory | 7,002 |
Note: Concentrate figures are subject to adjustments based on final settlement.
El Roble Mine
The El Roble mine is a high grade, underground copper and gold mine with nominal processing plant capacity of 1,000 tonnes per day, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate.
Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a historical nominal capacity of 400 tonnes per day.
El Roble has Proven and Probable reserves of 1.00 million tonnes grading 3.02% copper and 1.76 g/t gold, at a cut-off grade of 1.3% copper equivalent as of September 30th, 2020. Mineralization is open at depth and along strike and the Company plans to further test the limits of the deposit.
On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey pelagic sediments and cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified numerous target areas prospective for VMS type mineralization occurrence, which is the focus of the current surface drill program at El Roble.
Qualified Person
Mr. Thomas Kelly (SME Registered Member 1696580), advisor to the Company and a qualified person under National Instrument 43-101 standards, is responsible for ensuring that the technical information contained in this news release is an accurate summary of the original reports and data provided to or developed by Atico.
About Atico Mining Corporation
Atico is a growth-oriented Company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company generates significant cash flow through the operation of the El Roble mine and is developing its high-grade La Plata VMS project in Ecuador. The Company is also pursuing additional acquisition of advanced stage opportunities.
Falco Resources Ltd. (TSX-V: FPC) is pleased to announce the closing of ... READ MORE
Arizona Metals Corp. (TSX: AMC) (OTCQX: AZMCF) is pleased to announce th... READ MORE
Skyharbour Resources Ltd. (TSX-V: SYH) (OTCQX: SYHBF) (Frankfurt... READ MORE
Brunswick Exploration Inc. (TSX-V: BRW) (OTCQB: BRWXF) (FRANKFURT:1XQ) i... READ MORE
Blue Moon Metals Inc. (TSX-V: MOON), Nussir ASA and Nye Sulitjel... READ MORE