Atico Mining Corporation (TSX-V: ATY) (OTCQX: ATCMF) announces its operating results for the three months ended March 31, 2024 from its El Roble mine. Production for the quarter totaled 3.34 million pounds of copper and 2,156 ounces of gold in concentrates, an increase of 44% for copper and a decrease of 16% for gold, respectively, over the same period in 2023.

 

“The El Roble mine operated in line with set expectations for this quarter as we improved on almost all metrics over the same period last year,” said Fernando E. Ganoza, CEO. “For the remainder of the year, the team will be focused on optimizing production to take advantage of the higher metal price environment and to deliver on this year’s set guidance. In parallel, we continue to drill new high-grade resources in the mine vicinity target areas. These new areas will be incorporated into our mine plan as well as the new resource update which is planned to be published imminently.”

 

First Quarter Operational Highlights

  • Production of 3.34 million pounds of copper contained in concentrates; an increase of 44% over Q1 2023.
  • Production of 2,156 ounces of gold contained in concentrates; a decrease of 16% over Q1 2023.
  • Average processed tonnes per day of 811, an increase of 9% over Q1 2023.
  • Copper head grade of 2.51%, an increase of 34% over Q1 2023.
  • Gold head grade of 1.64 grams per tonne; a decrease of 25% over Q1 2023.
  • Copper and gold recovery of 91.8% and 62.1%; an increase of 3% for copper and 7% for gold, respectively, over Q1 2023.

 

First Quarter Operational Details

 

  Q1 2024
Total
Q1 2023
Total
% Change
Production (Contained in Concentrates)      
Copper (000s pounds) 3,338 2,319 44%
Gold (ounces) 2,156 2,566 -16%
Mine      
Tonnes of ore mined 64,873 60,568 7%
Mill      
Tonnes processed 65,787 62,793 5%
Tonnes processed per day 811 747 9%
Copper grade (%) 2.51 1.88 34%
Gold grade (g/t) 1.64 2.20 -25%
Recoveries      
Copper (%) 91.8 89.2 3%
Gold (%) 62.1 57.9 7%
Concentrates      
Copper and Gold Concentrates (dmt) 8,274 5,813 42%
       
Payable copper produced (000s lbs) 3,137 2,180 44%
       

Note: Metal production figures are subject to adjustments based on final settlement. The reported results are preliminary in nature and are awaiting independent lab verification.

 

Concentrate Inventory

 

The number of shipments the Company can export in any given quarter depends on several variables some of which the Company does not control, hence there may be an inherent variability in tonnes shipped quarter to quarter.

 

  Q1 2024 Total
Amounts in dry metric tonnes  
Opening inventory 8,227
Production 8,274
Sales -9,383
Number of shipments 1
Closing inventory 7,002
   

Note: Concentrate figures are subject to adjustments based on final settlement.

 

El Roble Mine

 

The El Roble mine is a high grade, underground copper and gold mine with nominal processing plant capacity of 1,000 tonnes per day, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate.

 

Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a historical nominal capacity of 400 tonnes per day.

 

El Roble has Proven and Probable reserves of 1.00 million tonnes grading 3.02% copper and 1.76 g/t gold, at a cut-off grade of 1.3% copper equivalent as of September 30th, 2020. Mineralization is open at depth and along strike and the Company plans to further test the limits of the deposit.

 

On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey pelagic sediments and cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified numerous target areas prospective for VMS type mineralization occurrence, which is the focus of the current surface drill program at El Roble.

 

Qualified Person

 

Mr. Thomas Kelly (SME Registered Member 1696580), advisor to the Company and a qualified person under National Instrument 43-101 standards, is responsible for ensuring that the technical information contained in this news release is an accurate summary of the original reports and data provided to or developed by Atico.

 

About Atico Mining Corporation

 

Atico is a growth-oriented Company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company generates significant cash flow through the operation of the El Roble mine and is developing its high-grade La Plata VMS project in Ecuador. The Company is also pursuing additional acquisition of advanced stage opportunities.

Posted April 23, 2024

Share this news article

MORE or "UNCATEGORIZED"


Bunker Hill Signs Financing Term Sheet for Up to 1.2 Million Ounces Silver Loan Facility

Bunker Hill Mining Corp. (TSX-V: BNKR) (OTCQB: BHILL) announces t... READ MORE

June 9, 2024

JUGGERNAUT ANNOUNCES CLOSING OF FLOW-THROUGH FINANCING FOR $3,800,000

FULLY FUNDED FOR DRILLING ON EXTENSIVE HIGH-GRADE COPPER-GOLD TAR... READ MORE

June 9, 2024

Lithium Ionic Announces Closing of Over-Subscribed Premium to Market Private Placement With Strategic Shareholders

Lithium Ionic Corp. (TSX-V: LTH) (OTCQX: LTHCF) (FSE: H3N) announ... READ MORE

June 9, 2024

OROCO ANNOUNCES CLOSING OF BROKERED PRIVATE PLACEMENT FOR GROSS PROCEEDS OF $6.3M

Oroco Resource Corp. (TSX-V: OCO) (OTC: ORRCF) is pleased to anno... READ MORE

June 9, 2024

PANTHER MINERALS CLOSES SECOND AND FINAL TRANCHE OF $2 MILLION PRIVATE PLACEMENT

Panther Minerals Inc. (CSE: PURR), is pleased to announce that t... READ MORE

June 9, 2024

Copyright 2024 The Prospector News