The Prospector News

ATEX Announces US$15 Million Credit Facility with Strategic Shareholders

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

ATEX Announces US$15 Million Credit Facility with Strategic Shareholders

 

 

 

 

 

ATEX Resources Inc. (TSX-V: ATX) is pleased to announce that it has entered into a credit agreement for the establishment of a US$15 million unsecured credit facility from a group led by existing strategic shareholders Firelight Investments LLC a company controlled by Pierre Lassonde, Beedie Investments Ltd. and other arm’s length parties. The Facility will provide ATEX additional financial flexibility to fund the Company’s ongoing work programs and provide general working capital.

 

“We are very grateful to have the continued support from our cornerstone shareholder through this Facility and the early exercise of warrants. We also would like to welcome Beedie Capital as our newest key stakeholder” stated Raymond Jannas, CEO and President of the Company. “This group of strategic shareholders have re-iterated their support and confidence in the Valeriano Project by agreeing to provide ATEX with a simple and flexible facility. With over $20mm in liquidity, we are extremely well positioned to execute our 2024 exploration drilling campaign, the completion of our upcoming updated resource for the Valeriano Project and other strategic initiatives.”

 

Facility

 

Under the terms of the Credit Agreement, the Company will have access to up to US$15 million in two tranches, with the US$10 million first tranche expected to be advanced to the Company within the next week. Following the advancement of the first tranche, the Company may then draw an additional US$5 million under the Credit agreement in a second tranche, provided such funds are drawn at least three months prior to the Maturity Date (as defined below). All amounts outstanding under the Facility will bear interest at a rate of 6.0% per annum and all outstanding principal and accrued interest are due and payable to the Lenders on the two year anniversary of the Credit Agreement. In addition, the Company may repay any principal and interest outstanding under the Facility in advance without penalty. The Facility is unsecured.

 

In connection with the Facility, the Company will issue non-transferable warrants to purchase an aggregate of 15,000,000 common shares of the Company to the Lenders on a pro rata basis, with each Facility Warrant entitling the holder to acquire one common share of the Company at an exercise price of $1.30 per Facility Warrant Share until the Maturity Date. The Facility Warrants will be issued in connection with funding of the first tranche.

 

Proceeds from the Facility will be used to fund the exploration and development of the Company’s Valeriano Copper Gold Project (including drilling, assays and working capital needs related thereto), completion of an updated resource study, and for general working capital and administrative purposes consistent with the Company’s current practices.

 

The Credit Agreement constitutes a “related party transaction” as defined under Multilateral Instrument 61-101 – Protection of Minority Security Holders in Special Transactions as Firelight is a “related party” of the Company given its greater than 10% beneficial shareholding of the Company. The Company has relied on exemptions contained in section 5.5(a) and 5.7(1)(a) of MI 61-101 from the valuation and minority shareholder approval requirements of MI 61-101 in respect of the Credit Agreement since neither the fair market value of the Facility, nor the fair market value of the consideration for the Facility, exceeds 25% of the Company’s market capitalization. The Company will file a material change report in respect of the Credit Agreement. The material change report will be filed less than 21 days prior to the closing of the Credit Agreement since the terms and conditions of the Credit Agreement were not agreed upon until shortly prior to closing of the Credit Agreement.

 

The Credit Agreement and issuance of the Facility Warrants remain subject to the approval of the TSX Venture Exchange.

 

Exercise of Warrants

 

In connection with the parties entering into the Credit Agreement, as a further show of support for the Company’s continued exploration of the Valeriano Project, existing significant shareholders, certain of the Lenders and Firelight have agreed to exercise additional purchase warrants for common shares of the Company for aggregate consideration to the Company of over C$2.5 million.

 

In addition, certain members of management and other existing shareholders of the Company have also agreed to exercise Warrants for aggregate additional consideration to the Company of over C$2.9 million.

 

Following such exercises, and together with the Facility described herein, the Company will have access to over US$19 million of capital to continue the development of the Valeriano Project.

 

About ATEX Resources Inc.

 

ATEX is exploring the Valeriano Copper Gold Project which is located within the emerging copper gold porphyry mineral belt linking the prolific El Indio High-Sulphidation Belt to the south with the Maricunga Gold Porphyry Belt to the north. This emerging belt, informally referred to as the Link Belt, hosts several copper gold porphyry deposits at various stages of development including, Filo del Sol (Filo Mining), Josemaria (Lundin Mining), Los Helados (NGEX Minerals/JX Nippon), La Fortuna (Teck Resources/Newmont) and El Encierro (Antofagasta/Barrick Gold).

 

Valeriano hosts a large copper gold porphyry deposit overlain by a near surface oxidized epithermal gold deposit. In 2022, ATEX completed the Company’s first limited drill test of the copper gold porphyry system that is now being followed up with campaign of directional drilling to extend the high-grade trend, test new targets and expand the mineralized envelope.

 

Posted July 12, 2023

Share this news article

MORE or "UNCATEGORIZED"


Millennial Announces Closing Private Placement for Total Proceeds of $9,188,880

Millennial Potash Corp. (TSX-V: MLP) (OTCQB: MLPNF) (FSE: X0D) is... READ MORE

July 31, 2025

Laramide Resources Announces Closing of Upsized $12,000,000 Private Placement

Laramide Resources Ltd. (TSX: LAM) (ASX: LAM) (OTCQX: LMRXF)  a ... READ MORE

July 31, 2025

SPC Nickel Closes $3.5 Million Rights Offering Backstopped by Dundee Corporation

SPC Nickel Corp. (TSX-V: SPC) and Dundee Corporation (TSX: DC.A) are pl... READ MORE

July 31, 2025

St. Augustine Announces Positive Results of the Kingking Copper-Gold Project Updated Preliminary Feasibility Study

NPV7% of $4.18 Billion After-tax IRR of 34.2% at $4.30/lb Copper ... READ MORE

July 31, 2025

Independence Gold Intersects 52.46 Metres Grading 2.51 g/t Gold and 19.73 g/t Silver in the Johnny Vein at the 3Ts Project, BC Independence Gold Corp. (TSX-V: IGO) is pleased to report assay results from three additional diamond drill holes completed at the Johnny Vein System at the 3Ts Project located in central British Columbia. These results further confirm the continuity and high-grade nature of the Johnny Vein System and expands the known footprint of mineralization. Located approximately 185 kilometres southwest of Prince George, British Columbia, the 3Ts Project comprises thirty-one mineral claims covering approximately 35,486 hectares in the Nechako Plateau region. The project lies 16 km southwest of Artemis Gold Inc.'s Blackwater Mine and hosts a low-sulphidation epithermal quartz-carbonate vein district within which at least nineteen known mineralized veins, ranging from 50 to over 1,100 metres in strike length and true widths of up to 32 m have been identified. Highlights from diamond drilling include: • Hole 3TS-25-31 intersected a broad zone of mineralization grading 2.51 g/t gold and 19.73 g/t silver over 52.46 metres (true width approximately 32m), including: o 2.32m grading 9.83 g/t gold and 28.02 g/t silver o 2.90m grading 7.16 g/t gold and 63.10 g/t silver o 1.14m grading 18.46 g/t gold and 33.33 g/t silver • Hole 3TS-25-29 returned 7.94 metres grading 2.65 g/t gold and 10.71 g/t silver (true width approximately 7.46m), including 1.94 metres of 7.53 g/t gold and 32.47 g/t silver. • Hole 3TS-25-30 returned 5.90 metres of 1.86 g/t gold and 17.29 g/t silver (true width approximately 5.54m), including 0.72 metres of 4.00 g/t gold and 26.39 g/t silver. "These results further validate the Johnny Vein System as a high-grade, laterally extensive target with strong potential for resource expansion," stated Randy Turner, President & CEO of Independence Gold. "We are particularly excited by the width and grade intersected in hole 3TS-25-31, which demonstrates consistent mineralization over more than 30 metres of true width and includes multiple zones of exceptional gold and silver values." The Johnny Vein System is one of several epithermal quartz-carbonate veins being explored at the 3Ts Project and appears to be comprised of several intertwining veins with mineralized breccias that produce wide zones of mineralization. The primary vein set is interpreted to have a true thickness of approximately 32 metres; however, including adjacent mineralized breccias and minor veins, the total mineralized width may extend up to 47.5 metres true width. The Johnny Vein indicates similarities in grade and continuity to the established Ted-Mint and Tommy Vein Systems, which form the foundation of the current 3Ts resource model (please see news release dated August 18th, 2022 for further details; "Technical Report on the Mineral Resource Estimate Update for the 3Ts Gold Project, Omineca Mining Division, British Columbia, Canada", authored by Armitage and Miller). The combined in-pit and underground components of Tommy and Ted-Mint vein systems contain a total inferred resource estimate of 4,469,297 tonnes grading 3.64 grams per tonne gold and 96.26 g/t silver, at a cut off grade of 0.4 g/t gold equivalent ("AuEq") in-pit and 2.0 g/t AuEq underground, containing 522,330 ounces of gold and 13,831,415 ounces of silver, totaling 678,156 AuEq ounces. Drill results from the Johnny Vein System will be incorporated in the updated NI 43-101 mineral resource anticipated to be completed in the third quarter of 2025. Drill Hole From (m) To (m) Interval (m) Gold (g/t) Silver (g/t) 3TS-25-29 4.00 6.00 2.00 1.15 9.50 and 10.00 11.80 1.80 0.61 3.89 and 20.92 21.66 0.74 2.85 9.46 and 25.66 27.53 1.87 4.09 20.32 and 33.00 38.00 5.00 1.22 2.40 and 44.06 52.00 7.94 2.65 10.71 including 44.06 46.00 1.94 7.53 32.47 3TS-25-29 63.17 63.68 0.51 1.10 13.73 and 66.00 66.70 0.70 1.71 28.57 and 71.00 74.00 3.00 0.75 15.33 and 80.68 86.58 5.90 1.86 17.29 and 88.00 91.00 3.00 0.80 2.00 and 102.70 104.88 2.18 2.03 4.13 3TS-25-31 65.05 66.50 1.45 4.68 5.52 and 67.69 68.10 0.41 6.24 4.88 and 73.54 126.00 52.46 2.51 19.73 including 79.18 81.50 2.32 9.83 28.02 and including 87.10 90.00 2.90 7.16 63.10 and including 109.36 110.50 1.14 18.46 33.33 and 155.00 156.54 1.54 1.82 5.84 Table 1: Significant Intercepts from the Johnny Vein *The true widths of the veins are average 80-95% of the reported interval width QA/QC Protocols Samples consist of saw-cut (NQ) drill core with one-half retained for reference and one-half submitted for analysis. Samples were submitted in sealed plastic bags delivered to Bandstra Transportation for shipping to SGS Natural Resources Canada (SGS) labs in Burnaby, British Columbia, for sample preparation and analysis. Robotic sample preparation is used to ensure reproducibility and samples are pulverized to greater than 85% passing 75 microns. All samples are submitted for four acid digest with an ICP finish. Gold grades are obtained by fire assay with AAS finish. Samples which return greater than 10 parts per million gold and 100 parts per million silver are resubmitted for fire assay with a gravimetric finish. Sample batches consist of core samples, control standards, blanks and duplicates. Blanks and control standards (QAQC) are inserted into each batch of samples, with one QAQC per 20 samples. QAQC samples that return values 10% outside of the expected range require samples from that internal batch to be rerun by the lab. SGS laboratories operate under a Quality Management System that complies with ISO/IEC 17025. SGS's minerals laboratory in Burnaby is accredited by the Standards Council of Canada (SCC) for specific mineral tests listed on the scope of accreditation to the ISO/IEC 17025 standard. Please see SGS Analytical Methods for further details regarding analytical procedures. About Independence Independence Gold Corp. is a well-financed mineral exploration company with holdings ranging from early-stage grassroots exploration to advanced-stage resource expansion in British Columbia and Yukon. The Company is positioned to add shareholder value through systematic project advancement, while management continues to evaluate additional gold and silver projects for possible acquisition. For additional information, visit the Company's website www.ingold.ca. Andy Randell, P.Geo., the Company's Qualified Person as defined by National Instrument 43-101 and who is an independent consultant for the Company, has reviewed the technical information in this news release. Drill Hole Information from this release Drill Hole Easting Northing Elevation Azimuth* Dip Total Meterage 3TS-25-29 363045 5876905 1218 170 70 144 3TS-25-30 363067 5876940 1216 270 70 106 3TS-25-31 363067 5876940 1216 220 65 158 * All drill hole locations are in NAD83, Zone 10 Datum **Based on true north. For magnetic declination add 17.5 degrees

Independence Gold Corp. (TSX-V: IGO) is pleased to report assay r... READ MORE

July 31, 2025

Copyright 2025 The Prospector News