The Prospector News

Artemis Gold Reports Q3 2025 Production Results

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Artemis Gold Reports Q3 2025 Production Results

 

 

 

 

 

Artemis Gold Inc. (TSX-V: ARTG) announces production results for the three months ended September 30, 2025 for the Blackwater Mine in central British Columbia.

 

Blackwater produced 60,985 ounces of gold during Q3 2025, consistent with guidance, bringing production for the five months ended September 2025 to 95,809 ounces of gold. On a year-to-date basis at the end of September 2025, Blackwater produced 124,328 ounces of gold.

 

During Q3 2025, the mill operated at an average throughput rate of 16,618 tonnes per day or 101% of design capacity for quarter. This is after accounting for a major 3-day shutdown in July 2025. For August and September 2025, the mill operated at an average rate of 17,248 tonnes per day or 105% of design capacity. Gold recovery in the mill improved to approximately 87% in the last two months of the quarter.

 

Artemis Gold CEO Dale Andres commented: “We continue to steadily progress our ramp-up and optimization of the Blackwater operation, including our mill feed blending strategy to optimize recoveries.

 

“As planned, production for the year is weighted to Q4 2025, with higher mill throughput rates and feed grades expected compared to Q3 2025. We remain well positioned to achieve full-year production guidance of 190,000 to 230,000 ounces of gold.”

 

About Artemis Gold

 

Artemis Gold is a well-financed, growth-oriented gold and silver producer and development company with a strong financial capacity aimed at creating shareholder value through the identification, acquisition, and development of gold properties in mining-friendly jurisdictions. The Company’s current focus is the Blackwater Mine in central British Columbia approximately 160km southwest of Prince George and 450km northeast of Vancouver. The first gold and silver pour at Blackwater was achieved in January 2025 and commercial production was declared on May 1, 2025.

 

Qualified Person

 

Artemis Gold Vice President, Technical Services Alastair Tiver, a Qualified Person as defined by National Instrument 43-101, has reviewed and approved the scientific and technical information in this press release.

 

Posted October 7, 2025

Share this news article

MORE or "UNCATEGORIZED"


Namibia Critical Metals Announces Completion of Japan's C$23 Million Earn-In and Formation of Strategic Joint Venture Company for the Lofdal Heavy Rare Earth Project

Namibia Critical Metals Inc. (TSX-V: NMI) (OTCQB: NMREF) is pleased to announce that Japan Organizat... READ MORE

July 31, 2026

Eldorado Gold Reports Solid Q2 2026 Financial and Operational Results; Skouries On Track for Q3 2026

Eldorado Gold Corporation (TSX: ELD) (NYSE: EGO) today reports the Company’s financial and operati... READ MORE

July 31, 2026

DPM Metals Reports Record Q2 2026 Free Cash Flow and Earnings; Vareš On-Track to Achieve Full Production by Year-end 2026

DPM Metals Inc. (TSX: DPM) (ASX: DPM) announced its operating and financial results for the second q... READ MORE

July 31, 2026

IMC Rare Earths Ltd Announces Closing of $20 Million Initial Public Offering

IMC Rare Earths Ltd, a company focused on the mineral exploration and development of magnet rare ear... READ MORE

July 31, 2026

Fairchild Gold Announces Closing of Private Placement Financing and Early Warning Report

Fairchild Gold Corp. (TSX-V: FAIR), is pleased to announce the closing, on July 29, 2026, of its pre... READ MORE

July 31, 2026

Copyright 2026 The Prospector News