
Mike Stark, President and CEO of Arizona Silver Exploration (TSX.V:AZS) (OTCQB:AZASF) joins us for an overview of the drill plans at the Philadelphia Project in Arizona. Slide 12 from the current Corporate Presentation, posted below, outlines the names of the areas drilled and the gap targets over 2KMs.
We start by having Mike recap yesterday’s news announcing the start of the deep drill program. These are the first holes to test for a feeder zone. All drilling to date has been to a maximum depth of 250 meters. Mike also shares the other areas that the Company plans to drill.
Courtesy of Arizona Silver Exploration and Korelin Report
SAGA Metals Corp. (TSX-V: SAGA) (OTCQX: SAGMF) (FSE: 20H), a North American exploration company foc... READ MORE
Fredonia Mining Inc. (TSX-V: FRED) is pleased to announce that it has closed its previously announce... READ MORE
Legacy Gold Mines Ltd. (TSX-V: LEGY) is pleased to report assay results from core holes LG26-017 an... READ MORE
Inventus Mining Corp. (TSX-V: IVS) is pleased to report results from 100 drill holes from its now-... READ MORE
Abcourt Mines Inc. (TSX-V: ABI) (OTCQB: ABMBF) is pleased to present its operational report for the ... READ MORE