a6 Published October 23, 2023 at 435 × 490 in Arizona Metals Intercepts 83.7 m at 3.6 g/t AuEq (incl. 15.3 m at 6.3 g/t AuEq) and 21.9 m at 1.3% CuEq (incl. 1.4 m at 5.7% CuEq) at the Kay Deposit