
American Manganese Chief Technical Officer and Director Zarko Meseldzija joined Steve Darling from Proactive to share news the company is announcing the equipment for its demonstration plant is ready for commissioning.
Meseldzija says the plant is designed to demonstrate the RecycLiCo process in continuous operating conditions that will show the company can run the complete process and provide input for commercial operation. The demonstration plant will operate with a cathode scrap processing capacity of 500 kg/day.
Courtesy of Proactive Investors
MAG Silver Corp. (TSX:MAG) ( NYSE: MAG) announces the Company’s... READ MORE
Abcourt Mines Inc. (TSX-V: ABI) (OTCQB: ABMBF) is pleased to report ne... READ MORE
Guanajuato Silver Company Ltd. (TSX-V:GSVR) (OTCQX:GSVRF) is prov... READ MORE
WOW ZONE – GS2437 6.84 g/t Au over 20.6 m including 115.5 g/t o... READ MORE
West Red Lake Gold Mines Ltd. (TSX-V: WRLG) (OTCQB: WRLGF) is ple... READ MORE