The Prospector News

American Manganese announces RecyLiCo Demonstration plant ready for commissioning

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

American Manganese announces RecyLiCo Demonstration plant ready for commissioning

 

 

 

 

American Manganese Chief Technical Officer and Director Zarko Meseldzija joined Steve Darling from Proactive to share news the company is announcing the equipment for its demonstration plant is ready for commissioning.

 

Meseldzija says the plant is designed to demonstrate the RecycLiCo process in continuous operating conditions that will show the company can run the complete process and provide input for commercial operation. The demonstration plant will operate with a cathode scrap processing capacity of 500 kg/day.

 

Courtesy of Proactive Investors

 

Posted March 16, 2022

Share this news article

MORE or "UNCATEGORIZED"


First Quantum Minerals Reports Third Quarter 2026 Results

First Quantum Minerals Ltd. (TSX: FM) today reports results for the three and nine months ended Sept... READ MORE

October 29, 2026

Eldorado Gold Reports Q3 2026 Financial and Operational Results and Updates 2026 Guidance; Skouries and McIlvenna Bay Advancing Toward Commercial Production

Eldorado Gold Corporation (TSX: ELD) (NYSE: EGO) today reports the Company’s financial and operati... READ MORE

October 29, 2026

Alamos Gold Reports Third Quarter 2026 Results

Alamos Gold Inc. (TSX:AGI) (NYSE:AGI) today reported its financial results for the quarter e... READ MORE

October 29, 2026

Kinross reports 2026 third-quarter results

Kinross Gold Corporation (TSX: K) (NYSE: KGC) today announced its results for the third quarter ende... READ MORE

October 29, 2026

Imperial Intersects 5 Metres of 5.51 Grams Per Tonne Gold at the Porcher Island Property

Imperial Metals Corporation (TSX:III) reports assay results from its spring 2026 diamond drilling pr... READ MORE

October 29, 2026

Copyright 2026 The Prospector News