American Lithium Corp. (TSX-V:LI) (NASDAQ:AMLI) (Frankfurt:5LA1) is pleased to provide assay results from four additional vertical diamond drill holes recently completed under the Environmental Impact Assessment drill program at the Falchani Lithium project in Puno southeastern Peru. The holes, in addition to drill holes announced July 12, 2023, were drilled under the ten-hole EIA hydrology drilling program launched at Falchani last Fall as part of the EIA hydrology study designed by EDASI SAC and SRK Peru with field work overseen by EDASI. The EIA hydrological study was approved by ANA.
Highlights
Currently, piezometers have been installed in four of the holes to monitor water activity through the calendar year. On completion of water monitoring, a final detailed EIA Report will be filed with the authorities in 2024. In the interim, most of the field work to enable the issuance of a Semi-Detailed EIA Report should be completed this fall. Such a filing would allow drilling across Falchani without the need for additional drill permits.
Simon Clarke, CEO of American Lithium, states, “We are excited to continue to intersect thick lithium mineralization to the west of the current Falchani resource footprint. The entire EIA drilling program, in addition to providing valuable and required hydrological data, looks to be significantly expanding the mineralization at Falchani. An updated mineral resource, likely to show increased resource confidence and resource size, is expected shortly.”
EIA Drill Program and Results
Link to: Figure 1 – Updated Falchani EIA Hydrology and Previous Drill Hole Location Map (also see below)
Figure 1 – Updated Falchani EIA Hydrology and Previous Drill Hole Location Map
Hole Pz07-TV was drilled approximately 450 m west of Platform 36 (Falchani West – 2020 drilling), the westernmost holes from the 2020 resource drill program, expanding the mineralized footprint extensively. Thick Li, Cs and Rb mineralization was intersected in rhyolite tuff, structural-hydrothermal breccia and subvolcanic rhyolitic intrusive rocks directly at surface to 160 m downhole depth. In addition to expanding the Falchani mineralization an additional 200 m to the west of Pz04-TV (see July 12, 2023 news release) the drill hole ended in mineralization, confirming mineralization remains open at depth in this area.
Hole Pz10-TV was drilled approximately 50 m southwest of Platform PCHAC-36 to investigate the water table in this strongly mineralized area. The hole intersected similar mineralization of Falchani tuff and lower brecciated units over the entire 160 m drill hole.
Hole Pz05-TV was drilled in the central valley in the central area of the Falchani resource footprint and provides another window into the thick (>160 m) mineralization linking the western and eastern portions of the Falchani deposit. The intense brecciation in the lower portions of the drill hole hosts higher grade Cs mineralization with lower Li contents.
Hole Pz08-TV was drilled along the southwestern edge of the lithium mineralized outcrop area at Tres Hermanas. While only 13 m of Falchani style mineralized brecciated tuff was intersected, the basement subvolcanic rhyolitic intrusive rocks encountered below do have highly anomalous Li contents, and this appears to establish the southern limit of the interpreted Falchani caldera system.
Table 1 – Drill Hole Pz07-TV results
Pz07-TV – 160.0 m total depth reported – Vertical |
From (m) | To (m) | Thickness (m) |
Li (ppm) | Cs (ppm) | Rb (ppm) | K (%) |
0.0 | 160.0 | 160.0 | 1,817 | 780 | 965 | 3.00 | |
including | 0.0 | 95.0 | 95.0 | 2,345 | 829 | 1,265 | 2.57 |
including | 0.0 | 42.0 | 42.0 | 3,246 | 602 | 1,342 | 2.75 |
Maximum Li interval | 32.0 | 33.0 | 1.0 | 4,102 | |||
Maximum Cs interval | 87.0 | 88.0 | 1.0 | 1,770 | |||
Maximum Rb interval | 68.0 | 69.0 | 1.0 | 1,595 |
Table 2 – Drill Hole Pz10-TV results
Pz10-TV – 160.0 m total depth reported – Vertical |
From (m) | To (m) | Thickness (m) |
Li (ppm) | Cs (ppm) | Rb (ppm) | K (%) |
0.0 | 160.0 | 120.0 | 2,196 | 713 | 1,126 | 2.63 | |
including | 21.0 | 95.0 | 74.0 | 3,055 | 577 | 1,217 | 2.64 |
Maximum Li interval | 86.0 | 87.0 | 1.0 | 5,025 | |||
Maximum Cs interval | 47.0 | 48.0 | 1.0 | 1,550 | |||
Maximum Rb interval | 116.0 | 117.0 | 1.0 | 1,901 |
Table 3 – Drill Hole Pz05-TV results
Pz05-TV – 160.15 m total depth reported – Vertical |
From (m) | To (m) | Thickness (m) |
Li (ppm) | Cs (ppm) | Rb (ppm) | K (%) |
0.0 | 160.15 | 160.15 | 1,683 | 1,598 | 1,173 | 3.06 | |
including | 0.0 | 16.0 | 16.0 | 2,348 | 439 | 1,558 | 3.14 |
including | 24.0 | 102.0 | 78.0 | 1,998 | 239 | 1,333 | 3.37 |
including | 104.0 | 150.2 | 46.2 | 1,277 | 4,710 | 1,083 | 2.71 |
Maximum Li interval | 149.2 | 150.2 | 1.0 | 3,282 | |||
Maximum Cs interval | 111.3 | 112.3 | 1.0 | 8,290 | |||
Maximum Rb interval | 39.0 | 40.0 | 1.0 | 1,837 |
Table 4 – Drill Hole Pz08-TV results
Pz08-TV – 160.0 m total depth reported – Vertical |
From (m) | To (m) | Thickness (m) |
Li (ppm) | Cs (ppm) | Rb (ppm) | K (%) |
0.0 | 13.0 | 13.0 | 2,486 | 1,998 | 1,267 | 3.11 | |
64.0 | 89.0 | 25.0 | 1,094 | 1,081 | 516 | 3.55 | |
Maximum Li interval | 8.0 | 12.0 | 4.0 | 2,859 | |||
Maximum Cs interval | 8.0 | 12.0 | 4.0 | 3,060 | |||
Maximum Rb interval | 0.0 | 2.0 | 2.0 | 1,541 |
Quality Assurance, Quality Control and Data Verification
Diamond drilling is being conducted using Company-owned drill rigs with local contract personnel. Drill core samples are cut longitudinally with a diamond saw, with one-half of the core placed in sealed bags and shipped to Certimin’s sample analytical laboratory in Lima for sample preparation, processing and ICP-MS/OES multi-element analysis. Certimin is an ISO 9000 certified assay laboratory. The Company’s Qualified Person for the drill program, Mr. Ted O’Connor, has verified the data disclosed, including drill core, sampling and analytical data in the field and laboratory. The program is designed to include a comprehensive analytical quality assurance and control routine comprising the systematic use of Company inserted standards, blanks and field duplicate samples, internal laboratory standards and has also included check analyses at other accredited laboratories. Downhole thicknesses for vertical drill holes are considered accurate true thickness intersections.
Qualified Person
Mr. Ted O’Connor, P.Geo., Executive Vice President of American Lithium, and a Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects, has reviewed and approved the scientific and technical information contained in this news release.
About American Lithium
American Lithium is actively engaged in the development of large-scale lithium projects within mining-friendly jurisdictions throughout the Americas. The Company is currently focused on the continued development of its strategically located TLC Lithium Claystone Project in the richly mineralized Esmeralda lithium district in Nevada, as well as continuing to advance its Falchani Hard-rock Lithium Project and Macusani Uranium Project in southeastern Peru. All three projects, TLC, Falchani and Macusani have been through robust preliminary economic assessments, exhibit strong significant expansion potential and enjoy strong community support. Pre-feasibility work is well advanced at Falchani and has commenced at TLC.
Goldshore Resources Inc. (TSX-V: GSHR) (OTCQB: GSHRF) (FWB: 8X00), is pleased to announce the first... READ MORE
Alphamin Resources Corp. (TSX-V:AFM) (JSE AltX:APH) is pleased to provide the following update for t... READ MORE
Winshear Gold Corp. (TSX-V: WINS) is pleased to report the results of its 2024 maiden drill program... READ MORE
Hudbay Minerals Inc. (TSX: HBM) (NYSE: HBM) is pleased to announce that it has surpassed a total of... READ MORE
Azimut Exploration Inc. (“Azimut” or the “Company”) (TSXV: AZM) (OTCQX: AZMTF) is pleased... READ MORE