AGNICO EAGLE REPORTS SECOND QUARTER 2022 RESULTS – STRONG OPERATIONAL PERFORMANCE DRIVES RECORD QUARTERLY GOLD PRODUCTION; PRODUCTION AND COST GUIDANCE REITERATED FOR 2022; UPDATED DETOUR LAKE MINE PLAN BASED ON 38% INCREASE IN MINERAL RESERVES

 

 

 

 

 

Agnico Eagle Mines Limited (NYSE: AEM) (TSX: AEM) reported financial and operating results for the second quarter of 2022.

 

Second quarter of 2022 highlights:

  • Record gold production and strong earnings and cash flow generation in the second quarter of 2022 – Payable gold production1 in the second quarter of 2022 was 858,170 ounces at production costs per ounce of $766, total cash costs per ounce2 of $726 and all-in sustaining costs (“AISC”) per ounce3 of $1,026. These results include the first full quarter of production following the completion of the merger between Agnico Eagle and Kirkland Lake Gold Ltd. (“Kirkland Lake Gold”) on February 8, 2022 (the “Merger”).  For the second quarter of 2022, the Company reported quarterly net income of $0.61 per share, with adjusted net income4  of $0.76 per share.  Operating cash flow was of $1.39 per share
________________________________
1 Payable production of a mineral means the quantity of a mineral produced during a period contained in products that have been or will be sold by the Company whether such products are shipped during the period or held as inventory at the end of the period.
2 Production costs per ounce and total cash costs per ounce are non-GAAP ratios that are not standardized financial measures under the financial reporting framework used to prepare the Company’s financial statements and, unless otherwise specified, is reported on a by-product basis in this news release.  For the detailed calculation of production costs per ounce and the reconciliation to production costs and for total cash costs on a co-product basis, see “Reconciliation of Non-GAAP Financial Performance Measures” below.  See also “Note Regarding Certain Measures of Performance”.
3 AISC per ounce is a non-GAAP ratio that is not a standardized financial measure under the financial reporting framework used to prepare the Company’s financial statements and, unless otherwise specified, is reported on a by-product basis in this news release.  For a reconciliation to production costs and for all-in sustaining costs on a co-product basis, see “Reconciliation of Non-GAAP Financial Performance Measures” below.  See also “Note Regarding Certain Measures of Performance”.
4 Adjusted net income and adjusted net income per share are non-GAAP measures that are not standardized financial measures under the financial reporting framework used to prepare the Company’s financial statements.  For a reconciliation to net income and net income per share see “Reconciliation of Non-GAAP Financial Performance Measures” below.  See also “Note Regarding Certain Measures of Performance”.
  • Ontario and Nunavut platforms drive solid operational performance – Gold production and costs in the second quarter of 2022 were better-than-expected primarily due to positive grade reconciliation at Amaruq and Detour Lake and productivity improvements at Macassa.  Better grade performance allowed Amaruq to have its best operational quarter since start up with payable production of 96,698 ounces of gold at production costs per ounce of $1,110 and total cash costs per ounce of $993.  In total, Nunavut payable production was 194,270 ounces of gold at production costs per ounce of $997 and total cash costs per ounce of $915.  In Ontario, payable production was 256,777 ounces of gold at production costs per ounce of $664 and total cash costs per ounce of $626.  The strong operational performance in the second quarter of 2022 puts the Company in a good position to deliver on 2022 guidance forecasts
  • Gold production, cost and capital expenditure guidance reiterated for 2022 – Expected payable gold production in 2022 remains unchanged at between 3.2 and 3.4 million ounces with total cash costs per ounce and AISC per ounce between $725 and $775 and $1,000 and $1,050, respectively.  Given that inflationary pressures are expected to continue in the second half of 2022, the Company believes that total cash costs per ounce and AISC per ounce could trend towards the top end of these ranges.  Gold production in the second half of 2022 is expected to be approximately equally split between the third and fourth quarters.  Total expected capital expenditures (excluding capitalized exploration) for 2022 remain estimated to be approximately $1.4 billion.  Guidance for 2022 includes production, costs and capital for the period commencing January 1, 2022 for the Detour Lake, Macassa and Fosterville mines
  • Inflationary environment expected to remain challenging in the second half of 2022 – During the first half of 2022, cost pressures were largely offset by strong operational performance, optimization and cost saving initiatives, positive foreign exchange impacts (weaker Euro and Canadian and Australian dollars) and currency and fuel hedging programs.  In the second half of 2022, the Company’s focus will continue to be on increasing operational efficiencies and cost optimization at all mining operations.  In addition, the Company anticipates continuing to opportunistically add to operating currency and fuel hedges
  • Corporate synergies largely completed and exceed initial estimate; Focus shifts to delivering operational synergies and strategic optimizations – Corporate synergies related to the Merger (approximately $40 million to date) have been the primary driver of realized synergies in 2022.  While the realization of the operational synergies and strategic optimization will be a multi-year endeavour, further progress to identify and secure opportunities was made in the second quarter of 2022 including:
    • Expected Corporate G&A synergies (before tax) are now estimated to be up to $225 million in the first five years (up from previous guidance of $200 million and initial guidance of $145 million) and up to $425 million over the next ten years (up from previous guidance of $400 million and initial guidance of $320 million)
    • The estimate for potential operational synergies remains unchanged at approximately $130 million per year ($440 million over five years, $1.1 billion over 10 years). The estimate of strategic opportunities to reduce current and future expenditures as part of the project pipeline also remains unchanged at up to $240 million over five years and $590 million over 10 years
  • Detour Lake Mine update – A recently completed technical evaluation shows increased mineral reserves, a more robust mine plan and potential for exploration and production upside – Among other things, the new technical evaluation lowers the mine plan’s risk, extends expected mine life by 10 years to 2052, increases gold reserves by 38% (or 5.6 million ounces (“Moz”)) to 20.4Moz (835.1 million tonnes at 0.76 grams per tonne (“g/t”) of gold), increases recovered gold by 38%, increases production in 2028 to 2031 by 0.4Moz (reduces a dip in production that was in previous mine plan), increases production in 2032 to 2042 by 1.8Moz, increases production in 2043 to 2052 by 3.0Moz, has higher average grades and lowers average costs for period between 2022 and 2042. The Detour Lake mine continues to have strong exploration upside primarily to the west and at depth, suggesting potential for an underground mine and extensions to the current open pits.  The Company is evaluating additional scenarios to potentially increase mill throughput beyond 28.0 million tonnes per year (“Mtpa”) after 2025.  In addition, the Company is assessing the potential for Detour Lake to increase production to 1.0 million ounces or more per year.  The Company expects to have an initial assessment on this potential completed in late 2023
  • Drilling at Detour Lake has encountered significant intersections that extend the deposit two kilometres west of the current pit outline – Drilling has encountered gold-bearing mineralization along the Sunday Lake Deformation Zone and has continued to intersect a key gold-bearing chloritic-greenstone geological marker horizon found in both the Main Pit and West Pit zones.  Highlights include 32.3 g/t gold over 4.8 metres at 955 metres depth (a two kilometre step-out hole), 2.9 g/t gold over 29.7 metres at 305 metres depth and 6.0 g/t gold over 32.7 metres at 481 metres depth.  The Company plans drilling to further investigate the westerly trend of the deposit to assess the potential for pit extensions and underground mining
  • Key Exploration and Development Projects Continue to Advance
    • Odyssey Project – Underground development and surface construction activities are progressing on schedule and on budget, with initial pre-commercial production expected near the end of the first quarter of 2023.  Twenty drills are active, with four underground drills completing infill drilling on the Odyssey South deposit and 12 surface drills focused on infilling and expanding the East Gouldie deposit and four drills active in regional exploration.  Recent drilling has extended the East Gouldie deposit to the west by approximately 225 metres and to the east at depth by approximately 500 metres to more than 1,700 metres from the current mineral resources outline
    • Kirkland Lake region – At Macassa, the focus remains on completing the Shaft #4 infrastructure, which the Company expects to occur close to year-end 2022, and ramping up production.  At the Amalgamated Kirkland (“AK”) deposit, two underground and two surface drills are working to infill and expand the existing mineral resource.  The Company is evaluating the deposit as a potential ore source for the Macassa mine which, if the evaluations are positive, could commence as early as 2024.  At Upper Beaver, the infill drilling program was completed in the second quarter of 2022 and the results will be incorporated into the economic model.  Several development scenarios for Upper Beaver are currently being evaluated
    • Hope Bay — Drilling continued to ramp-up in the second quarter of 2022, completing 30,761 metres (46,658 metres year to date) with three drill rigs now operating underground at Doris, three drill rigs targeting deep extension at Doris and a seventh drill rig operating at Madrid.  Drill results continue to show excellent potential at Doris at depth below the dike in the BTD Connector and BTD Extension targets and in the Doris Central extension to the south.  Recent highlights include: 12.2 g/t gold over 7.1 metres at 456 metres depth from BTD Connector; and 20.9 g/t gold over 2.3 metres at 344 metres depth from BTD Extension.  On the back of the drilling success at Doris in the first half of 2022, the Company is considering an increase to the exploration budget at Hope Bay for the second half of 2022.  Exploration is expected to continue through 2023 while a larger production scenario is being evaluated
  • Strong investment grade balance sheet; $125M debt repayment in April 2022 and commencement of normal course issuer bid (“NCIB”) in June 2022 – On April 7, 2022, the Company repaid with cash the $125 million 6.77% Series C senior notes at maturity.  At June 30, 2022, the Company’s net debt5  totaled $434.3 million.  Subsequent to the quarter end, the Company repaid with cash the $100 million 4.87% Series C senior notes at maturity on July 24, 2022, further reducing the Company’s indebtedness.  The Company’s NCIB was initiated in June 2022 and 453,000 common shares were repurchased in the second quarter of 2022 for $22.3 million.  Under the NCIB, the Company is authorized to purchase up to $500 million of its common shares (up to a maximum of 5% of its issued and outstanding common shares)
  • A quarterly dividend of $0.40 per share has been declared

 

“In the second quarter of 2022 the Company set a new quarterly production record driven by both strong operational and safety performance.  In Nunavut, Amaruq had a record quarter for both costs and production, and the Ontario mines exceeded forecast.  This strong production performance led to better than expected earnings and cashflow and puts us in a good position to deliver on 2022 guidance forecasts, despite ongoing inflationary cost pressures,” said Ammar Al-Joundi, Agnico Eagle’s President and Chief Executive Officer.  “During the quarter, exploration continued to deliver exciting results at Detour Lake, Odyssey and Hope Bay.  I am particularly excited by the step-out drilling at Detour which suggests good potential for an underground operation and extensions to the current open pits.  A number of opportunities to improve the mining operations and enhance production are currently under evaluation, and the Company’s long-term vision for Detour Lake is to increase production to 1.0 million ounces per year or more,” added Mr. Al-Joundi.

 

______________________________
5 Net debt is a non-GAAP measure that is not a standardized measure under the financial reporting framework used to prepare the Company’s financial statements.  For a reconciliation to long-term debt see “Reconciliation of Non-GAAP Financial Performance Measures – Reconciliation of Long-Term Debt to Net Debt”.  See also “Note Regarding Certain Measures of Performance”.

 

 

Second Quarter 2022 Financial and Production Results

 

In the second quarter of 2022, net income was $275.8 million ($0.61 per share).  This result includes the following items (net of tax): a non-cash fair value adjustment on inventory sold during the quarter related to the Merger included in production costs of $27.1 million ($0.06 per share), mark-to-market losses of $18.4 million ($0.04 per share) on the Company’s investment portfolio, foreign currency translation losses on deferred tax liabilities of $14.6 million ($0.03 per share), derivative losses on financial instruments of $11.2 million ($0.02 per share), non-cash foreign currency translation gains of $10.3 million ($0.02 per share), severance costs of $8.1 million ($0.01 per share) and various other adjustment losses of $2.2 million ($0.01 per share).  Excluding these items would result in adjusted net income6 of $347.1 million or $0.76 per share for the second quarter of 2022.  For the second quarter of 2021, the Company reported net income of $196.4 million ($0.81 per share).

 

Included in the second quarter of 2022 net income, and not adjusted above are care and maintenance costs net of tax of $5.7 million ($0.01 per share) and a non-cash stock option expense of $3.2 million ($0.01 per share).

 

In the first six months of 2022, the Company reported net income of $385.6 million ($0.92 per share).  This compares with the first six months of 2021, when net income was $341.6 million ($1.40 per share).

 

For financial reporting purposes, the Merger was determined to be a business combination with Agnico Eagle identified as the acquirer.  As a result, the purchase consideration was allocated to the identifiable assets and liabilities of Kirkland Lake Gold based on their fair values as of February 8, 2022 (the “Purchase Price Allocation”) and was recorded in the first quarter of 2022.  The finalization of the Purchase Price Allocation will take place within twelve months following the acquisition date.

 

Upon closing of the Merger, under the Purchase Price Allocation, any gold inventory held by Kirkland Lake Gold on February 8, 2022 was revalued at the forecasted gold price in the period the inventory was expected to be sold.  The revalued inventory subsequently sold during the second quarter of 2022 resulted in additional production costs of approximately $39.2 million ($27.1 million after tax) during the quarter.  The revalued inventory subsequently sold during the first six months of 2022 resulted in additional production costs of approximately $152.9 million ($105.9 million after tax).  Given the extraordinary nature of the fair value adjustment on inventory related to the Merger, this non-cash adjustment, which increased the cost of inventory sold during the quarter, was normalized from net income and net income per share and adjusted out of the total cash costs per ounce and AISC in the second quarter of 2022.

 

The increase in net income in the second quarter and first six months of 2022 compared to the prior-year period is primarily due to higher mine operating margins6 (from higher sales volumes following the Merger and higher realized metal prices).  The overall increase in net income was partially offset by higher exploration costs and amortization due to the inclusion of the Detour, Fosterville and Macassa mines and higher general and administrative costs.  In addition, higher losses on derivatives, other expenses and care and maintenance costs offset the higher operating margins.

 

In the second quarter of 2022, cash provided by operating activities was $633.3 million ($706.0 million before changes in non-cash components of working capital), compared to the second quarter of 2021 when cash provided by operating activities was $419.4 million ($444.6 million before changes in non-cash components of working capital).  A non-cash fair value adjustment on inventory related to the Merger of $39.2 million was included in production costs and as result included in cash provided by operating activities before changes in non-cash components of working capital for the second quarter of 2022.  The non-cash fair value adjustment on inventory was then reversed through changes in non-cash components of working capital.

 

Excluding the non-cash fair value adjustment on inventory of $39.2 million related to the Merger, cash provided by operating activities before changes in non-cash components of working capital was $745.2 million in the second quarter of 2022 and increased when compared to the prior-year period primarily due to higher sales volumes and higher realized prices.  This included non-recurring costs related to the Merger of $10.8 million in severance costs.

 

___________________________
6 Operating margin is a non-GAAP measure.  For a reconciliation to net income see “Reconciliation of Non-GAAP Financial Performance Measures” below.  See also “Note Regarding Certain Measures of Performance”.

 

In the first six months of 2022, cash provided by operating activities was $1,140.7 million ($1,072.0 million before changes in non-cash components of working capital), compared to the first six months of 2021 when cash provided by operating activities was $786.0 million ($870.1 million before changes in non-cash components of working capital).  Excluding the non-cash fair value adjustment on inventory of $152.9 million related to the Merger, cash provided by operating activities before changes in non-cash components of working capital was $1,224.9 million in the first six months of 2022.

 

The increase in cash provided by operating activities in the second quarter and first six months of 2022, compared to the prior-year periods, is primarily due to higher net income driven by higher sales volumes following the Merger and higher realized metal prices.  This included non-recurring costs related to the Merger of $34.8 million in transaction costs and $56.8 million in severance costs.

 

In the second quarter of 2022, the Company’s payable gold production was a record 858,170 ounces.  This compares to quarterly payable gold production of 526,006 ounces in the prior-year period.

 

In the first six months of 2022, the Company’s gold production was a record 1,518,774 ounces.  Including the entire first six month’s production from the pre-Merger Kirkland Lake Gold mines, total gold production in the first half of 2022 was 1,664,499.  This compares to payable gold production of 1,042,810 ounces in the first six months of 2021, which included 17,176 ounces and 348 ounces of pre-commercial production of gold at the Tiriganiaq open pit at Meliadine and Amaruq underground project, respectively.

 

Gold production in the second quarter of 2022 and the first six months of 2022, when compared to the prior-year periods, was higher primarily due to the inclusion of the production from the Detour Lake, Fosterville and Macassa mines.  This was partially offset by the cessation of gold production in 2022 at the Hope Bay mine following the Company’s decision to dedicate the infrastructure to exploration activities and lower production at the Company’s Pinos Altos mine, as a result of lower tonnage sourced from the underground mine.

 

Production costs per ounce in the second quarter of 2022 were $766, compared to $838 in the prior-year period.  Total cash costs per ounce in the second quarter of 2022 were $726, compared to $748 in the prior-year period.

 

Production costs per ounce in the first six months of 2022 were $869, compared to $829 in the prior-year period.  Total cash costs per ounce in the first six months of 2022 were $763, compared to $741 in the prior-year period.  Including the entire first six month’s production from the pre-Merger Kirkland Lake Gold mines, total cash costs per ounce in the first six months of 2022 were slightly below the mid-point of 2022 cost guidance.

 

In the second quarter, production costs per ounce and total cash costs per ounce decreased when compared to the prior-year period primarily due to lower minesite costs per tonne.  Total cash costs per ounce also decreased when compared to the prior-year period due to the fair value adjustment on inventory sold during the second quarter, partially offset by lower by-product metal revenue from lower silver and zinc production in 2022.  In the first six months of 2022, production costs per ounce and total cash costs per ounce increased when compared to the prior-year period primarily due to higher minesite costs per tonne and lower production at various operations in the first three months of the year.  A detailed description of the minesite costs per tonne at each mine is set out below.

 

AISC per ounce in the second quarter of 2022 were $1,026, compared to $1,037 in the prior-year period.  AISC per ounce in the first six months of 2022 were $1,051, compared to $1,022 in the prior-year period.

 

AISC per ounce in the second quarter of 2022 decreased when compared to the prior-year period primarily due to lower total cash costs per ounce, partially offset by higher sustaining capital expenditures. 7  AISC per ounce in the first six months of 2022 increased when compared to the prior-year period primarily due to higher total cash costs per ounce in the first six months of 2022 and slightly higher sustaining capital expenditures and general and administrative costs.

 

Update on Key Value Drivers

 

Activities are progressing well at the Company’s key exploration, development, and mine expansion projects.  Highlights on the key value drivers are set out below and details on the various mine expansion projects (Kittila shaft, Meliadine Phase 2, Macassa Shaft #4 and Amaruq underground) are set out in the operational section of this news release.

 

Detour Lake Mine technical evaluation – Mineral reserves increased by 38% to 20.4 million ounces; Production profile improved and extended by 10 years; Ongoing exploration expected to further increase mineral resources; Future focus on potential expansion scenarios

 

_________________________________
7 Sustaining capital is a non-GAAP measure that is not a standardized financial measure under the financial reporting framework used to prepare the Company’s financial statements.  See “Note Regarding Certain Measures of Performance”.

 

During the second quarter of 2022, the Company completed a technical evaluation on its Detour Lake Mine.  This evaluation is a follow up to a National Instrument 43-101 – Standards of Disclosure for Mineral Projects Technical Report on the Detour Lake Operations that was filed by Kirkland Lake Gold in October 2021.  In this evaluation, there are no significant changes to the geological setting, or the mining, milling and metallurgical processes used at the Detour Lake operations.

 

The goal of this technical evaluation was to convert a portion of the 2021 measured and indicated mineral resources into mineral reserves, update the life of mine plan and incorporate updated timelines on several mill optimization projects that were designed to increase the mill throughput to 28 Mtpa by 2025.  Highlights from this evaluation include:

  • Lower risk mine plan
  • Added 10 years to the mine life (until 2052)
  • + 38% in gold reserves (+5.6Moz to 20.4Moz (835.1 million tonnes at 0.76 g/t gold))
  • + 38% in recovered gold:
    • + 0.4Moz added in 2028-2031 (reduces a production dip in the previous mine plan)
    • + 1.8Moz added in 2032-2042
    • + 3.0Moz added in 2043-2052
  • Higher average grade, lower average costs, 2022 – 2042

 

The Company continues to evaluate the exploration upside and the potential to further expand production at the Detour Lake mine, including through the following:

  • Increasing mill capacity beyond 28.0 Mtpa – current permitting allows for processing of up to 32.8 Mtpa
  • Assessing the potential for underground mining
  • Installing an electric trolley assisted haulage system to improve haulage efficiency and support carbon emission reductions
  • Improving grade control processes
  • Further optimizing of mine and mill processes
  • Additional exploration potential in the region

 

Successful exploration in 2021 drove significant increase in mineral resources at year end 2021

 

Exploration drilling in 2021 provided additional evidence of a broad and continuous corridor of mineralization extending from the Main Pit through the Saddle Zone to the planned West Pit to a depth of at least 800 metres.  This drilling resulted in a significant increase in mineral resources at Detour Lake at year end 2021.

 

Detour Lake’s combined measured and indicated mineral resources totaled 15.2 million ounces of gold (574.9 million tonnes grading 0.83 g/t gold) at year-end 2021, which was a 194% increase in ounces (10.1 million ounces) compared to the 5.2 million ounces (134.1 million tonnes grading 1.21 g/t gold) estimated at December 31, 2020.  The increase in measured and indicated mineral resources was driven by significant drilling success in 2021.  In addition, Detour Lake contained inferred mineral resources of 1.3 million ounces of gold (53.3 million tonnes grading 0.78 g/t gold) at year-end 2021.

 

The Detour Lake mine was estimated to contain proven mineral reserves of 80.3 million tonnes grading 1.13 g/t gold for approximately 2.9 million ounces of gold and probable mineral reserves of 493.0 million tonnes grading 0.76 g/t gold for approximately 12.1 million ounces of gold, as of December 31, 2021.

 

Technical evaluation increases mineral reserves by 38% to 20.4 million ounces; mineral resources essentially unchanged at March 31, 2022

 

As part of the new Detour Lake technical evaluation, additional drill results were incorporated into the mineral resource and mineral reserve database and new estimates were completed as of March 31, 2022.

 

The Detour Lake mine is estimated to contain proven mineral reserves of 77.59 million tonnes grading 1.12 g/t gold for approximately 2.8 million ounces of gold and probable mineral reserves of 757.5 million tonnes grading 0.72 g/t gold for approximately 17.6 million ounces of gold, as of March 31, 2022.  Proven and probable reserves now total 20.4 million ounces (835.1 million tonnes at 0.76 g/t gold), which is approximately a 38% increase from December 31, 2021 mineral reserve estimate net of the first quarter of 2022 depletion.

 

Detour Lake’s combined measured and indicated mineral resources totaled 14.2 million ounces of gold (590.1 million tonnes grading 0.75 g/t gold) at March 31, 2022.  The slight decline results from the conversion of mineral resources to mineral reserves at March 31 2022.  In addition, Detour Lake contained inferred mineral resources of 1.8 million ounces of gold (75.2 million tonnes grading 0.75 g/t gold) at March 31, 2022.  Total mineral resources are essentially unchanged from year-end 2021, despite a significant conversion to mineral reserves.

 

Additional details on the Detour Lake mineral reserves and mineral resources at December 31, 2021 are presented in the Company’s news release dated February 23, 2022.  Additional details on the Detour Lake mineral reserves and mineral resources at March 31, 2022 are presented in the Appendix of this news release.

 

New mine plan adds 5.1 million ounces of recovered gold; improved production in 2028 to 2031; and mine life extended by 10 years to 2052

 

The Company has undertaken several projects to gradually increase the mill throughput to 28.0 Mtpa by 2025.  These include:

  • Pre-screening before the secondary crusher is expected to help de-bottleneck the grinding circuit and contribute an additional approximately 2.0 Mtpa to the mill throughput. The project is approximately 69% complete and is expected to be fully completed in the fourth quarter of 2022
  • The construction of four additional carbon-in-pulp leach tanks are expected to increase the leach retention time and capacity by approximately 20% and improve gold recovery. Engineering is expected to be completed in 2022; foundation work is planned to be completed in 2023 with the tank installation planned for 2024
  •  An upgrade to the gravity circuit is planned which is expected to increase free gold recovery from 25% to approximately 40%. The project is approximately 53% complete with commissioning expected to be completed in the fourth quarter of 2022
  • A new automated laboratory to analyze samples from delineation and production drilling is being built. The project is approximately 78% complete, with commissioning expected in early 2023
  • An upgrade of the 230kV main substation is planned to improve the power quality at the mine. In addition, the upgrade will improve the site readiness for future power expansion for projects such as the trolley assist mine haulage system. The upgrade is expected to be completed in late 2023 or early 2024 depending on the timing of equipment deliveries

 

The Detour Lake mine plan has been revised to reflect the new mineral reserves and mineral resources as of March 31, 2022 and the steady progress on the mill optimization projects.

 

With the new mineral reserve addition, approximately 5.1 million ounces of gold have been added to the mine plan, and the mine life has been extended from 2042 through 2052.  A chart showing the recovered ounce profile for the previously released 2020 life-of-mine plan and the updated 2022 life-of-mine plan is presented below.

 

Detour Lake Mine – Recovered Ounce Profile – 2022 Life of Mine Plan vs 2020 Life of Mine Plan

 

Detailed production metrics, operating and capital cost details are presented in the summary table below.

 

Detour Lake – 2022 LOMP Update

(All numbers are approximate)

 

Economic Assumptions:
Gold Price ($/oz) $1,500
USD:CAD 1.30
Effective tax rate (%) 16.5 %
Estimated total gold production 18.7 million gold ounces
Life of Mine (years) 29.9 years
Average metallurgical recovery 91.6 %

 

 

PRODUCTION METRICS
Ore Mined Strip Ratio Mill
Throughput
Milled
Grade
Gold
Production
(million
tonnes)
waste tonnes : Ore tonnes  (million
tonnes)
(g/)t (thousand ounces)
2022 Q2-Q4* 31.0 1.59 20.0 0.94 543
2023 45.7 1.50 27.0 0.88 704.8
2024 43.9 1.89 27.7 0.86 705.9
2025 28.5 3.63 28.0 0.88 725.3
2026 31.5 3.18 28.0 0.89 735.5
2027 28.2 3.65 28.0 0.78 645.8
2028 33.6 2.89 28.0 0.74 604.0
2029 40.9 2.22 28.0 0.86 711.7
2030 48.1 1.72 28.0 1.01 844.1
2031 45.4 1.89 28.0 1.05 874.6
Average for Years 2032-2042 40.6 1.2 28.0 0.94 782.0
Average for Years 2043-2051 0 0.00 28.0 0.40 327.4
2052 0 0.00 4.3 0.37 46.6
Total LOM 823.8 1.70 835.1 0.76 18,700.6

 

 

OPERATING COSTS
Mine Costs (C$/t) 3.58 (including deferred stripping; years 2022-2042)
Rehandling costs (C$/t) 2.11 (years 2043-2052)
Processing and G&A (C$/t) 12.09
Minesite Costs (net
of deferred stripping)
Cash costs on a by-
product basis
All-in sustaining
costs per ounce
(C$/t milled) ($/oz) ($/oz)
2022 Q2-Q4* 20.46 643 911
2023 18.58 591 934
2024 18.58 605 821
2025 18.89 604 873
2026 18.68 590 836
2027 20.28 720 968
2028 22.68 845 1,086
2029 21.22 686 963
2030 19.42 539 730
2031 18.72 504 663
Average for Years 2032-2042 19.34 576 801
Average for Years 2043-2052 21.55 1,456 1,528
* 2022 Q2-Q4 Production and costs metrics are based on 2022 Guidance

 

 

CAPITAL COSTS
Development Capex
C$ (millions)
Sustaining Capital
C$ (millions)
MC$ MC$
2022 Q2-Q4 185.0 230.5
2023 224.0 308.6
2024 269.7 192.3
2025 289.4 247.2
2026 268.3 229.4
2027 320.4 203.0
2028 153.7 184.4
2029 94.3 251.4
2030 112.9 206.0
2031 161.8 176.1
Average for Years 2032-2042 37.2 178.8
Average for Years 2043-2052 0.0 27.9
Total LOM 2,489 4,451
Closure costs (C$, millions) 272

 

The new LOMP adds approximately 410,000 ounces of gold to the production profile in years 2028 through 2031, reducing a dip in the previous production plan.  Peak annual production of approximately 900,000 ounces of gold is maintained in 2032 and 2033, and significant new production (an aggregate of approximately 2 million ounces of gold) has been added in years 2037 to 2042.  Production starts to decline in 2043 when the current open pit mineral reserves are depleted.  From 2044 to 2051, output remains relatively steady at just over 300,000 ounces of gold per year as production shifts to the processing of stockpiled lower grade material.

 

The Company believes that there is a good upside potential for additional exploration to add ounces to the mine plan in future years, which could result in an increase in production in the period 2044 to 2052.

 

Under the new LOMP, average total cash costs per ounce for the life-of-mine are approximately US$730.  This represents an increase of approximately $60 per ounce over the previous estimates that were provided in the 2020 mine plan.  The updated cash costs primarily reflect the following items:

  • Revised prices for fuel and consumables, especially in the earlier years of the operation
  • Increased electricity costs and increased carbon taxes
  • Higher maintenance costs related to increased equipment wear due to a longer mine life
  • Additional years of stockpile rehandling

 

The average AISC in the revised mine plan is approximately $920 per ounce, which is an increase of approximately $85 per ounce.  This reflects the higher total cash costs and additional capital spending required due to the increased mine life.  The primary capital items include:

  • Additional tailings storage and water management
  • Additional deferred stripping
  • Mobile equipment

 

Drilling continues to intersect mineralization west of the resource pit shells, further supporting the potential to extend the open pits; drilling has also encountered significant zones of both higher and lower grade mineralization extending the deposit two kilometres west of the current pit outline

 

In the exploration program at Detour Lake during 2022, Agnico Eagle has budgeted approximately $35.8 million for 194,000 metres of capitalized drilling to attempt to expand mineral resources at depth and to the west, and $10.1 million for 40,000 metres for expensed exploration drilling to continue investigating the Sunday Lake Deformation Zone to the east and west of the current pit’s mineral resources.

 

During the first half of 2022 at Detour Lake, the Company completed 89 holes totalling 95,998 metres of capitalized drilling and 10 holes totalling 12,025 metres of expensed drilling.  Approximately 84,660 metres of the drilling completed to date in 2022 was not included in the latest mineral reserve and mineral resource update, which utilized a database that closed in February 2022.

 

Drilling in the westerly plunge of the deposit has continued to return wide mineralized intervals including a higher grade portion that supports the potential to continue growing the “out-pit” mineralization, which now extends 2 km west of the current resource pit outline.

 

Highlights from recent drilling in the West Pit zone outside and to the west of the current resource pit outline include: hole DLM22-441A, which intersected 4.4 g/t gold over 15.4 metres at 224 metres depth, including 17.9 g/t gold over 3.2 metres at 218 metres depth, 3.8 g/t gold over 2.7 metres at 517 metres depth and 4.7 g/t gold over 2.7 metres at 630 metres depth; hole DLM-22-447, which intersected 4.7 g/t gold over 2.6 metres at 303 metres depth; and hole DLM-22-447W, which intersected 24.1 g/t gold over 3.6 metres at 426 metres depth and 4.3 g/t gold over 2.7 metres at 447 metres depth.

 

Highlights from drilling in the West Pit Extension zone further west outside the current mineral resource pit outline include: hole DLM22-437A, which intersected 2.9 g/t gold over 29.7 metres at 305 metres depth, including 21.2 g/t gold over 3.3 metres at 310 metres depth and 0.8 g/t gold over 28.0 metres at 350 metres depth; and hole DLM-22-458, which intersected 6.0 g/t gold over 32.7 metres at 481 metres depth, including 71.5 g/t gold over 3.3 metres at 492 metres depth, 2.7 g/t gold over 8.5 metres at 517 metres depth, 0.8 g/t gold over 30.6 metres at 560 metres depth and 1.1 g/t gold over 31.5 metres at 602 metres depth, including 3.2 g/t gold over 3.4 metres at 597 metres depth.

 

Regional exploration drilling in the West Pit Extension up to 2 km west of the West Pit mineral resources has encountered gold-bearing mineralization along the Sunday Lake Deformation Zone and has continued to intersect a key gold-bearing chloritic-greenstone geological marker horizon found in both the Main Pit and West Pit zones.  Highlights include hole DLM22-448, which returned 32.3 g/t gold over 4.8 metres at 955 metres depth, and hole DLM22-453, which returned 3.2 g/t gold over 2.7 metres at 592 metres depth, 3.2 g/t gold over 2.7 metres at 610 metres depth, 6.0 g/t gold over 5.6 metres at 940 metres depth and 4.9 g/t gold over 3.7 metres at 1,019 metres depth.

 

[Detour Lake Mine – Plan Map and Composite Longitudinal Section]

 

The Company plans to continue drilling to further investigate the westerly plunge of the deposit to continue to assess the deposit’s underground mining potential.  This year’s budget also incorporates a plan to investigate the Sunday Lake Deformation Zone along strike to the west and to the east of the mine.

 

More detailed results from the exploration program at Detour Lake will be presented in an exploration-focused news release on August 11, 2022.

 

Opportunities to further enhance the mining and milling operations

 

Several opportunities that may improve the mining operations and enhance the project economics are currently under evaluation.  These include:

  • Additional modifications to the processing circuit to increase the capacity beyond the current 28.0 Mtpa rate. Three independent process improvement alternatives currently exist: screening and sorting of low-grade fines, pebble sorting of SAG mill discharge and evaluation of a new crushing circuit using high pressure grinding rolls. The evaluation of these alternatives also requires a review of the capacity of the existing equipment and plant modifications to achieve higher throughput rates. Current permitting allows for processing of up to 32.8 Mtpa
  • Investigation of the underground potential at Detour Lake based on results from the previous and current exploration programs. The underground potential is associated with the significant mineralization outside the planned final pit limits.  Underground mining operations would likely be accessed via a ramp.  Past high-level assessments indicated the potential for a 4,000 to 6,000 tonnes per day (“tpd”) mining operation utilizing long hole stoping methods with grades ranging from 2.0 g/t to 3.0 g/t gold.  The historical underground mining grade at Detour Lake was approximately 4.2 g/t gold.  These assessments were limited in scope and did not include the results of the extensive exploration campaigns conducted in 2020 and 2021.  The goal of the current exploration program is to better delineate the orebody and to test its continuity to the west and at depth
  • Increased levels of automation in the mine operation. The Company expects the recent upgrade of the mine network to 5G will enable higher levels of automation
  • Use of alternative energy sources to diesel with the intent of reducing greenhouse gas emissions and improving business sustainability and competitiveness. As part of this initiative, the Company is investigating the potential implementation of an electric trolley assisted haulage system to improve haulage efficiency and support carbon emission reduction
  • Alternate tailings impoundment and treatment. The Company is investigating different options for tailings disposal with a goal of reducing life-cycle costs and improving the construction of tailings facilities
  • Potential improvements to water treatment and discharge. The Company is assessing water treatment and discharge processes at Detour Lake, focusing on reducing water quality risks

 

In parallel with an aggressive continued exploration program at Detour, the Company is allocating significant resources to evaluate the concepts outlined above and assess the potential to increase production to 1.0 million ounces of gold per year or more.  The Company expects to have an initial assessment on this potential completed in late 2023.

 

Odyssey Project – Underground Development and Surface Construction Progressing on Schedule and on Budget; Infill drilling at East Gouldie Deposit Expected to Upgrade Mineral Resources at Year-end 2022; Regional Exploration Extends East Gouldie to the West and East

 

In the second quarter of 2022, underground development and surface construction activities at the Odyssey project were on schedule and on budget, and inflationary cost pressures remained manageable.

 

Surface construction activities on the headframe, shaft house, waste silo and temporary sinking hoist building are all progressing as planned, with completion expected in the fourth quarter of 2022, after which shaft sinking activities will commence.  Phase 1 construction of the paste plant and 120 kV powerline are on target for completion in the first quarter of 2023.  Pre-commercial production from the Odyssey South orebody is expected to begin before the end of March 2023.

 

At the Odyssey underground, development activities will ultimately transition from a mining contractor to in-house crews.  Hiring commenced in the second quarter of 2022.  Underground development activities remain on target with the following activities planned to be completed in advance of the production startup:

  • Temporary emergency egress (fourth quarter of 2022)
  • Underground paste backfill piping network (first quarter of 2023)
  • Draw point development, stope preparation and drilling (fourth quarter of 2022 through first quarter of 2023)
  • Installation of main underground fans (third quarter of 2022)

 

At the Canadian Malartic mine in 2022, the Company has budgeted $11.9 million (50% basis) for 136,800 metres (100% basis) of exploration and conversion drilling focused on infill drilling at the East Gouldie deposit to improve confidence in the mineral resource, to continue the conversion of inferred mineral resources to indicated mineral resources and to refine the geological model.  With ramp development continuing as part of the Odyssey Mine project, Canadian Malartic GP (the “Partnership”) will complete further underground conversion drilling from the ramp in the remainder of 2022.

 

Twenty drills are currently active on the property, with four underground drills completing infill drilling on the Odyssey South deposit and 12 surface drills focused on infilling and expanding the East Gouldie mineralization and four drills active in regional exploration.  The Partnership drilled 95,030 metres (100% basis) during the first half of 2022.

 

With the continued success at infilling East Gouldie at 75-metre spacing in the core of the deposit and some recent expansion to the west at depth, the Company expects a significant portion of the East Gouldie deposit to be classified as indicated mineral resources at year end 2022.  The Company also expects that the core portion of the Odyssey South deposit will be classified as mineral reserves at year-end 2022.

 

A recent exploration highlight is hole MEX22-231, which returned 1.8 g/t gold over 62.9 metres at 1,580 metres depth in the western extension of the East Gouldie deposit approximately 225 metres west of the current mineral resources outline.  This intercept is approximately halfway between the East Gouldie deposit and the Norrie Zone to the west and shows the potential for East Gouldie to connect with other mineral inventories in the Norrie and South Sladen mineralized zones that are not yet classified as mineral resources.

 

In regional exploration to the east, highlight hole RD21-4689AA drilled on the adjacent Rand Malartic property intersected 3.1 g/t gold over 3.0 metres at 2,537 metres depth, which extends the East Gouldie mineralized corridor eastward by 500 metres to approximately 1,700 metres east of the current mineral resources outline.  Mineralization remains open to the east.

 

In addition, the Company is planning to spend approximately $4.1 million (50% basis) on 21,900 metres (100% basis) of exploration drilling to expand mineralization towards the east in the East Gouldie horizon and the new Titan zone at depth on the Rand property.  Some drilling is also planned on the nearby East Amphi property to extend the Nessie and Kraken zones.

 

Kirkland Lake region – Macassa Shaft #4 Project Progressing on schedule; Drilling at the AK deposit expected to define Mineral Resource potential by year-end 2022; Infill drilling completed at Upper Beaver and new target areas being tested

 

At the Macassa mine, the focus for the second half of 2022 remains on completing the various infrastructure projects associated with Shaft #4 and ramping up production.  All of the critical projects are on track to commission the shaft by the end of 2022.

 

At the AK deposit, an assessment is underway to evaluate the deposit as a potential ore source for the Macassa mine.  If the evaluations are positive, AK ore could complement the mill feed at Macassa as early as 2024.

 

The underground ramp from Macassa has been extended by 615 metres year-to-date (of a planned 984 metres exploration drift).  Two drills have been active underground with 3,068 metres completed in 24 holes.  This drilling was focused on infill drilling of the higher-grade portions of the deposit (greater than 4 g/t gold) near the proposed bulk sample.  Significant intersections returned to date include: 14.1 g/t gold over 6.5 metres at 222 metres depth in hole KLAK-010, 23.9 g/t gold over 2.0 metres at 112 metres depth in hole KLAK-011 and 14.9 g/t gold over 3.0 metres at 256 metres depth in hole KLAK-016.  The underground program is on schedule for completion late in the fourth quarter of 2022 as planned.

 

A surface drill program is also underway at AK, and two drill rigs completed 10,136 metres in the second quarter of 2022.  Drilling is designed to delineate shallow portions of the deposit that cannot be reached from the underground ramp.  Results to date have confirmed grade thicknesses in the core of the zone.  Drill highlights (over true widths) include:

  • 6.9 g/t gold over 6.7 metres at 138 metres depth in hole KLAKC22-148
  • 5.9 g/t gold over 6.0 metres at 147 metres depth in hole KLAKC22-146
  • 9.0 g/t gold over 9.2 metres at 171 metres depth in hole KLAKC22-165
  • 6.0 g/t gold over 7.7 metres at 125 metres depth in hole KLAKC22-160
  • 8.7 g/t gold over 7.6 metres at 146 metres depth in hole KLAKC22-162

 

The surface drilling program is expected to total approximately 17,000 metres and be completed in September 2022.

 

Results to date confirm that the AK mineralization is generally vertical and controlled by quartz-carbonate veinlet envelopes that pinch and swell vertically and laterally, varying from 1 to 15 metres locally with local high grade, visible gold intercepts.

 

At Upper Beaver, the infill drilling program was completed in the second quarter of 2022.  This program was successful in filling gaps in the mineralization in the footwall zone and the infill drill results will be incorporated into the economic model.  Several development scenarios are under review, some of which are evaluating the potential to use existing infrastructure at the Macassa mine or the Holt property, which is currently on care and maintenance.

 

Over the balance of the year, one drill will continue to test a new potential discovery (Zone 172) located approximately 500 metres southeast of the main mineralized zone.  Additional holes will be drilled to test the North Basalt zone, which has yielded values up to 51.5 g/t gold over 5.0 metres at 672 metres depth in hole KLUB22-768.

 

Hope Bay – Drilling Activities Ramped Up in the Second Quarter of 2022; Larger Production Scenarios Continue to be Evaluated

 

Drilling is continuing to ramp up at Hope Bay, with 46,658 metres completed during the first half of 2022.  Three drill rigs are now operating underground at the Doris deposit, three drill rigs are targeting deep extensions at Doris from surface and a seventh drill rig is operating at the Madrid deposit.

 

Drill results continue to show excellent potential at Doris at depth below the dike in the BTD Connector and BTD Extension targets and in the Doris Central extension to the south.

 

Recent highlights from BTD Connector include: hole HBD22-030, which intersected 12.2 g/t gold over 7.1 metres at 456 metres depth; and hole HBD22-008, which intersected 10.0 g/t gold over 3.6 metres at 379 metres depth.  In conversion drilling in the northern portion of BTD Extension, hole HBDBE22-50888 intersected 20.9 g/t gold over 2.3 metres at 344 metres depth.

 

During the second half of the year at Doris, work will continue on extending the exploration drift and investigating the deposit from underground and surface drill rigs.

 

At Madrid, drilling is targeting the vertical extension in the Suluk zone.  Field work is also underway between and around Doris and Madrid to validate high potential near-mine targets.

 

At the Boston deposit, maintenance work is underway to refurbish the camp before considering resuming activity there in 2023.

 

Exploration is expected to continue through 2023 while larger production scenarios are being evaluated.  Detailed results from the 2022 exploration program at Hope Bay will be presented in an exploration-focused news release on August 11, 2022.

 

2022 Synergy and Optimization Benefits Ahead of Estimates and Schedule

 

In the second quarter of 2022, the Company continued work on the targeted synergy and optimization benefits from the Merger.  The expected corporate level general and administrative (“G&A”) synergies were realized faster than anticipated, and the Company now believes it has achieved annual savings higher than originally targeted.  Progress continues largely at or above expectations with regards to the operational and strategic synergies, and the Company expects that 2022 Merger-related synergies will be at the top end of the previously disclosed range of $40 million to $60 million and the target of $2 billion of Merger-related synergy and optimization benefits will be achieved over the next ten years.

 

Expected Corporate G&A Synergies Surpassed, Annual Run-Rate Achieved

 

Corporate synergies continued to be the primary driver of realized synergies in the second quarter of 2022.  The Company has now largely completed the work necessary to achieve the expected corporate synergies, realizing approximately $40 million to date, more than the original full-year 2022 estimate of $15 million to $25 million.  The Company now anticipates being able to achieve an ongoing annual savings near or slightly more than the top end of the $40 million to $50 million range disclosed in the first quarter of 2022.

 

The key components of the realized corporate G&A synergies are:

  • Streamlining of the business resulting in personnel cost savings estimated to be approximately $27 million in 2022, expected to grow to $31 million by 2024
  • Lower finance and insurance costs of approximately $10 million on an ongoing basis
  • Reduction and consolidation of regional office space, resulting in savings of approximately $9 million (a combination of one-time and ongoing)
  • Streamlining of service contracts and the elimination of external service providers resulting in IT savings of $3.5 million in 2022, expected to grow to $5 million per year by 2025.

 

As a result of the success to date, the Company is revising upwards its expected corporate G&A synergies to up to $225 million before tax in the first five years (up from previous guidance of $200 million and initial guidance of $145 million) and to up to $425 million over the next ten years (up from previous guidance of $400 million and initial guidance of $320 million).

 

Operational Synergies Progress In Line with Expectations

 

The Company is maintaining its estimate for potential operational synergies in excess of $130 million per year ($440 million over five years, ramping up to $1.1 billion over 10 years).  The realization of the operational synergies remains a longer-term endeavor, and progress to date is largely in line with expectations.  The Company has identified specific opportunities and has put in place plans and resources to realize these opportunities.  Examples include:

 

Item Longer-term Target Progress to Date
2022 Target Achieved/Identified
Procurement $35-$50M/yr by 2024 $10M $6.5M
Energy Management $30M-60M/yr by 2027 Advance studies Preliminary studies ongoing
Maintenance Optimization $30-50M/yr by 2028 Advance studies Preliminary studies ongoing
Remote Monitoring and Data
Analytics
$20-$30M/yr by 2029 Advance studies Preliminary studies ongoing
Detour Plan Optimization $10-$15M/yr by 2024 $5M $10-$15M/yr
Streamlining Doré Marketing $2-3M/yr $1M $0.5M
Elimination of External Consultants $2-3M/yr $2M $2M
Technology Acceleration $10-20M/yr by 2025 $1M $1M – Studies ongoing
TOTAL $440M (5 years)

$1.1B (10 years)

$15-20M $20-25M

 

  • Procurement – Vendor consolidation and a reorganization of the Canadian procurement team has led to savings of approximately $6.5 million year-to-date and the Company expects to reach $10 million of savings by the end of 2022
  • Energy Management – Energy monitoring and load management is expected to reduce operating costs by up to $60 million by 2027 with the deployment of peak levelling technologies, site power usage reviews and remote energy management
  • Maintenance optimization – The Company expects that use of remote operation data, improvement in general maintenance procedures due to best practices sharing across the Company, streamlined spare parts management and reduced shutdown durations will reduce maintenance costs and/or increase productivity by up to $50 million in aggregate yearly across all Agnico Eagle operations
  • Detour Plan Optimization – The optimization includes a modification in the open pit wall angles to reduce waste stripping costs as well as additional process plant availability.  The Company expects that the open pit wall angle change could reduce overall costs by approximately $100 million over the life of mine while the increased availability at the mill could increase revenue by approximately $5 million per year
  • Technology Acceleration – Includes core scanning technology, use of photon assays in geology, use of drones in surveying and use of automation, battery-electric vehicles as well as trolley assisted hauling

 

The Company estimates the operational synergies and other cost reduction measures have the potential to reduce production costs by up to $10 per ounce in 2022 and by $30-$40 per ounce in later years.  Given the work and complexity involved in attaining these synergies, and the volatile and inflationary price environment, these synergies have not been reflected in the 2022 cost guidance.  The Company expects to incorporate these opportunities into the new 2023 forecast expected later this year.

 

Strategic Optimization Ongoing

 

The Company continues its review of strategic opportunities to reduce current and future expenditures as part of its project pipeline, maintaining the original estimate of up to $240 million over five years and $590 million over 10 years.

 

Mining the AK deposit from Macassa Infrastructure:

  • Work continues on accessing the AK ore body from the existing Macassa ramp
  • To date, 615 metres of a planned 984 metre exploration drift were developed and over 3,000 metres of definition drilling into the AK ore body were completed from underground.  A surface drill program is also underway and is expected to be completed in the second half of 2022
  • As part of the regular life of mine planning process, the Company is considering the optimal timing of potentially feeding AK ore into the Macassa Mill (as previously disclosed, this could be as early as 2024)

 

Improved Budgeting and Costing:

  • Over the past three years, Agnico Eagle has been working on an initiative to more accurately measure and predict operating cost drivers
  • This initiative is in the process of being rolled out across all operations
  • It is anticipated that improved cost control from this initiative could result in operating costs savings of up to $30 million per year by 2026

 

Upper Beaver project update:

  • Work continues on evaluating the potential to use existing Kirkland Lake Camp infrastructure, to reduce capex and operating costs at the Upper Beaver Project

 

Strengthening Investment Grade Balance Sheet; Fitch Ratings’ Credit Rating Upgrade and Commencement of Normal Course Issuer Bid in June 2022

 

On April 7, 2022, the Company repaid out of available cash the $125 million 6.77% Series C senior notes at maturity.  Subsequent to the quarter end, the Company repaid out of available cash the $100 million 4.87% Series C senior notes at maturity on July 24, 2022, further reducing the Company’s indebtedness.  On June 16, 2022, Fitch Ratings upgraded its credit rating for Agnico Eagle to BBB+ from BBB with a Stable Outlook reflecting the Company’s strong credit profile, along with the size and scale benefits arising from the Merger.

 

At June 30, 2022, the Company’s net debt totaled $434.3 million.  The NCIB was initiated in June 2022 and 453,000 common shares were repurchased for $22.3 million.  Under the NCIB, the Company can purchase up to $500 million of its common shares (up to a maximum of 5% of its issued and outstanding common shares).

 

Cash and cash equivalents decreased to $1,006.9 million at June 30, 2022, from the March 31, 2022 balance of $1,062.0 million, primarily due to the debt repayment and purchases under the NCIB, partially offset by higher cash flow from operations (higher sales volumes and realized gold prices).  As of June 30, 2022, the outstanding balance on the Company’s unsecured revolving bank credit facility was nil, and available liquidity under this facility was approximately $1.2 billion, not including the uncommitted $600 million accordion feature.

 

Approximately 58% of the Company’s remaining 2022 estimated Canadian dollar exposure is hedged at an average floor price above 1.27 C$/US$.  Approximately 45% of the Company’s remaining 2022 estimated Mexican peso exposure is hedged at an average floor price above 20.35 MXP/US$.  Approximately 36% of the Company’s remaining 2022 estimated Euro exposure is hedged at an average floor price of approximately 1.10 US$/EUR.  Approximately 21% of the Company’s remaining 2022 estimated Australian dollar exposure is hedged at an average floor price above 1.44 A$/US$.  The Company’s full year 2022 cost guidance is based on assumed exchange rates of 1.25 C$/US$, 20.00 MXP/US$, 1.20 US$/EUR and 1.32 A$/US$

 

Agnico Eagle is hedged approximately 43% on its remaining diesel exposure in 2022.  Year to date, the Company has realized approximately $17 million in hedging gains related to fuel.  In 2023, the Company is hedged approximately 26% on its diesel exposure.  These hedges have partially mitigated the effect of inflationary pressures to date and are expected to provide a degree of protection against inflation going forward.

 

The Company will continue to monitor market conditions and anticipates continuing to opportunistically add to its operating currency and diesel hedges to strategically support its key input costs.  Current hedging positions are not factored into 2022 and future guidance.

 

In order to maintain financial flexibility, and consistent with past practice, the Company intends to file a new base shelf prospectus in the third quarter of 2022.  The Company has generally maintained a base shelf prospectus since 2002.  The Company has no present intention to offer securities pursuant to the new base shelf prospectus.  The notice set out in this paragraph does not constitute an offer of any securities for sale or an offer to sell or the solicitation of an offer to buy any securities.

 

Dividend Record and Payment Dates for the Second Quarter of 2022

 

Agnico Eagle’s Board of Directors has declared a quarterly cash dividend of $0.40 per common share, payable on September 15, 2022 to shareholders of record as of September 1, 2022.  Agnico Eagle has declared a cash dividend every year since 1983.

 

Expected Dividend Record and Payment Dates for the 2022 Fiscal Year

 

Record Date Payment Date
September 1, 2022* September 15, 2022*
December 1, 2022 December 15, 2022

*Declared

 

Dividend Reinvestment Plan

 

Please see the following link for information on the Company’s dividend reinvestment plan: Dividend Reinvestment Plan

 

Capital Expenditures

 

In the second quarter of 2022, capital expenditures (including sustaining capital) were $364.2 million and capitalized exploration expenditures were $37.4 million, for a total of $401.6 million.  In the first six months of 2022 capital expenditures (including sustaining capital) were $583.9 million and capitalized exploration expenditures were $67.7 million for a total of $651.7 million.  Capital expenditures were lower than forecast in the second quarter and first six months of 2022 primarily due to the timing of the expenditures.

 

Total capital expenditures (excluding capitalized exploration) for 2022 remain estimated to be approximately $1.4 billion.

 

The following table sets out capital expenditures and capitalized exploration in the second quarter of 2022 and the first six months of 2022.

 

Capital Expenditures
(In thousands of U.S. dollars)
Capital Expenditures* Capitalized Exploration
Three Months
Ended
Six Months
Ended
Three Months
Ended
Six Months
Ended
June 30, 2022 June 30, 2022 June 30, 2022 June 30, 2022
Sustaining Capital Expenditures
LaRonde complex 25,024 45,687 674 1,414
Canadian Malartic mine 16,346 27,080
Goldex mine 6,003 11,984 556 1,202
Detour Lake mine 73,974 86,616
Macassa mine 8,325 12,758 542 766
Meliadine mine 14,698 23,640 1,406 1,545
Meadowbank complex 13,367 24,171
Hope Bay mine 3,314 3,314 290 290
Fosterville mine 13,594 22,092 4 213
Kittila mine 10,075 19,721 1,393 3,097
Pinos Altos mine 6,703 11,538 421 493
La India mine 1,315 2,121 8
Total Sustaining Capital $        192,738 $        290,722 $            5,286 $            9,028
Development Capital Expenditures8
LaRonde complex 17,990 33,887
Canadian Malartic mine 25,582 45,398 3,753 6,689
Goldex mine 6,640 11,403 808 1,653
Detour Lake mine 33,353 54,609 9,047 16,651
Macassa mine 22,622 36,984 3,763 6,457
Meliadine mine 20,019 30,754 1,881 4,751
Meadowbank complex 291 1,110
Amaruq underground project 17,552 32,580 769 1,102
Hope Bay mine 1,968 1,968
Fosterville mine 1,315 1,748 9,955 18,005
Kittila mine 13,753 24,289 1,215 1,215
Pinos Altos mine 7,891 13,809
La India mine 2,479 4,320
Other 346 900 2,177
Total Development Capital $        171,455 $        293,205 $          32,091 $          58,700
Total Capital Expenditures $        364,193 $        583,927 $          37,377 $          67,728
* Excludes capitalized exploration

 

_________________________
9 Sustaining capital expenditures and Development capital expenditures are a non-GAAP measure that is not a standardized financial measure under the financial reporting framework used to prepare the Company’s financial statements.  See “Note Regarding Certain Measures of Performance” and “Reconciliation of Non-GAAP Performance Measures – Reconciliation of Sustaining Capital Expenditures to Consolidated Statements of Cash Flow”

 

2022 Guidance Unchanged

 

Expected payable gold production in 2022 remains unchanged at between 3.2 and 3.4 million ounces with total cash costs per ounce and AISC per ounce between $725 to $775 and $1,000 and $1,050, respectively.  Given that inflationary pressures are expected to continue in the second half of 2022, the Company believes that total cash costs and AISC could trend towards the top end of the guided ranges.  Gold production in the second half of 2022 is expected to be approximately equally split between the third and fourth quarters.

 

Total expected capital expenditures (excluding capitalized exploration) for 2022 remain estimated to be approximately $1.4 billion.  Guidance for 2022 includes production, costs and capital for the period commencing January 1, 2022 at the Detour Lake, Macassa and Fosterville mines.

 

The estimated 2022 depreciation and amortization expense provided on February 23, 2022 considered a preliminary fair value allocation to the Kirkland Lake Gold assets.  The 2022 depreciation and amortization expense guidance is now expected to be between $1.25 to $1.35 billion for the full year 2022 (compared to prior guidance of $1.37 to $1.47 billion).  The finalization of the Purchase Price Allocation will take place within the twelve months following the acquisition date and, as such, the depreciation estimate is subject to change.

 

Cost Inflation

 

During the first six months of 2022 cost pressures were largely offset by strong operational performance and measures, including optimization and cost saving initiatives, long-term agreements with local suppliers, and hedging programs for both fuel and currencies. In 2022, positive foreign exchange impacts (weaker Euro and Canadian and Australian dollars) have also helped mitigate the impact of rising costs.

 

With the Nunavut sea-lift season underway, realized gains from the Company’s hedges continue to provide a degree of protection against fuel price inflation and are expected to help mitigate cost pressures in the second half of 2022.  Given recent U.S. dollar strength, coupled with the softness in the oil and distillate markets, the Company continues to opportunistically manage and mitigate its currency and diesel price risks through hedging for the balance of 2022 and into 2023.

 

The inflationary cost environment continues to be dynamic and the Company expects higher input costs to remain for the year’s second half and beyond.  In the second half of 2022 the focus will continue to be on increasing operational efficiencies and cost optimization at all mining operations.  Even with these efforts, the Company expects continuing cost pressures in the second half of 2022 and full year costs are now expected to be closer to the top end of the guidance range.  Beyond 2022, the Company anticipates that the synergies associated with the Merger ($30-$40 per ounce) will help mitigate potential future cost increases.

 

Demonstrating strong environmental, social and governance (“ESG”) performance

 

On June 20, 2022, the Company released its 2021 Sustainability Report.  This is the 13th year that Agnico Eagle has produced a detailed account of the Company’s ESG performance.  This report was prepared in accordance with the Global Reporting Initiative (“GRI”) Standards: Core Options, with additional mining industry specific indicators from the Sustainability Accounting Standards Board (“SASB”) Metals and Mining disclosures and metrics.  The sustainability report is also aligned with the Task Force on Climate Related Financial Disclosures (“TCFD”).

 

The sustainability report provides an update on Agnico Eagle’s oversight, strategy, practices and risk management approach to key areas of health and safety, environmental, social and governance and on the historic sustainability performance of all mining operations.  Highlights from the sustainability report include:

  • Reporting on all operations – Performance data in the sustainability report from both Agnico Eagle and Kirkland Lake Gold is provided separately, and consolidated where appropriate
  • Strong overall ESG performance – The Company maintained or improved performance across many key environmental indicators, including zero significant environmental incidents and the efficient use of water (78% of water for operational use recycled and reductions in fresh water used per ounce of gold produced).  The Company continued to contribute and invest in the communities in which it operates with a combined $10.0 million in community investments and $1.6 billion in local procurement.  An update on the Company’s climate strategy is expected to be provided later in 2022
  • Continued commitment to addressing climate-change and reaching net-zero by 2050 – In 2021, Agnico Eagle became a formal supporter of TCFD, expanded its climate-change governance model and completed a corporate climate-change related risk assessment. The Company’s combined greenhouse gas (“GHG”) profile, with an intensity of 0.4 tonnes of CO2 equivalent for every ounce of gold produced, continues to position Agnico Eagle as a low GHG intensity gold producer. The Report also provides an estimate of Scope 3 emissions
  • COVID-19 Response – In 2021, Agnico Eagle continued to respond to the challenges presented by COVID-19. Throughout the pandemic the Company continued to focus on three priorities: protecting its employees, protecting its communities and protecting its operations
  • Responsible Mining – The Company is committed to being a responsible miner and contributor to the sustainable development of the regions where it operates. In 2021, Agnico Eagle completed an externally verified audit for six mine sites on Towards Sustainable Mining (“TSM”), Responsible Gold Mining Principles (“RGMP”), and Voluntary Principles on Security and Human Rights (“VPSHRs”)

 

The Company is committed to providing a safe place to work and to maintaining the highest health and safety standards.  In the second quarter of 2022, the Goldex mine won two industry awards for its outstanding safety performance in 2021 and was honoured as the Safest Metal Mine in Quebec-Maritimes.

  • On May 2, 2022, Goldex received the Canadian Institute of Mining, Metallurgy and Petroleum’s John T. Ryan Trophy for achieving the lowest reportable injury frequency per 200,000 hours worked in the Quebec-Maritimes region in 2021
  • On June 9, 2022, Goldex also received the FJ O’Connell Award from the Quebec Mining Association for its outstanding safety performance for “underground operations more than 400,000 hours worked”

 

Agnico Eagle’s mine rescue teams have a reputation for excellence in emergency response, helping to make our workplaces safer for employees, contractors and our host communities.  In the second quarter of 2022, the Goldex mine rescue team won the Provincial Mine Rescue competition.  The team was lead for the first time in history by a woman.

 

For the fourth consecutive year and eighth since 2012, the Company has earned a place on the Corporate Knights list of Canada’s Best 50 Corporate Citizens.  The Best 50 Corporate Citizens are selected through evaluations of key environmental, social and governance indicators relative to their industry peers and using publicly available information.  Being named to the list over each of the last four years demonstrates that the Company continues to be one of the Canadian leaders with respect to environmental, social and governance matters in the mining industry.

 

ABITIBI REGION, QUEBEC

 

Agnico Eagle is Quebec’s largest gold producer with a 100% interest in the LaRonde complex (which includes the LaRonde and LaRonde Zone 5 (“LZ5”) mines), the Goldex mine and a 50% interest in the Canadian Malartic mine.  These mines are located within 50 kilometres of each other, which provides operating synergies and allows for the sharing of technical expertise.

 

LaRonde Complex – Gold Production In Line With Forecast; LZ5 Contributed Better Than Expected Tonnage; Underground Exploration Drifts Ahead of Schedule; Drilling Activity Expected to Increase in the Second Half of 2022

 

The 100% owned LaRonde mine in northwestern Quebec achieved commercial production in 1988.  The LZ5 property lies adjacent to and west of the LaRonde mine and previous operators exploited the zone by open pit mining.  The LZ5 mine achieved commercial production in June 2018.

 

LaRonde Complex – Operating Statistics
Three Months Ended Three Months Ended
June 30, 2022 June 30, 2021
Tonnes of ore milled (thousands of tonnes) 714 721
Tonnes of ore milled per day 7,824 7,923
Gold grade (g/t) 4.08 4.42
Gold production (ounces) 88,510 97,523
Production costs per tonne (C$) $                                 92 $                                125
Minesite costs per tonne9 (C$) $                               124 $                                115
Production costs per ounce of gold produced ($ per ounce) $                               577 $                                759
Total cash costs per ounce of gold produced ($ per ounce) $                               649 $                                502

 

Gold production in the second quarter of 2022 decreased when compared to the prior-year period primarily due to lower gold grades related to the mining sequence and an increase in tonnage sourced from the lower grade LZ5 mine.  The increase in tonnage sourced from the LZ5 mine is a result of the optimization and increased usage of automated equipment.

 

Production costs per tonne in the second quarter of 2022 decreased when compared to the prior-year period primarily as a result of the timing of unsold concentrate inventory, partially offset by higher unit costs for fuel, materials and reagents and lower throughput levels.  Production costs per ounce in the second quarter of 2022 decreased when compared to the prior-year period primarily as a result of the timing of unsold concentrate inventory, partially offset by lower gold production and higher unit costs for fuel, materials and reagents.

 

Minesite costs per tonne in the second quarter of 2022 increased when compared to the prior-year period primarily due to higher unit costs for fuel, materials and reagents and lower throughput levels.  Total cash costs per ounce in the second quarter of 2022 increased when compared to the prior-year period primarily due to higher minesite costs per tonne, lower gold production and lower by-product credits mostly related to lower realized by-product metal prices.

_____________________________
10 Minesite costs per tonne is a non-GAAP measure that does not have a standardized meaning under the financial reporting framework used to prepare the Company’s financial statements.  For a reconciliation to production costs see “Reconciliation of Non-GAAP Performance Measures” below.  See also “Note Regarding Certain Measures of Performance”.

 

 

LaRonde Complex – Operating Statistics
Six Months Ended Six Months Ended
June 30, 2022 June 30, 2021
Tonnes of ore milled (thousands of tonnes) 1,447 1,485
Tonnes of ore milled per day 7,994 8,204
Gold grade (g/t) 4.41 4.22
Gold production (ounces) 193,547 190,601
Production costs per tonne (C$) $                               100 $                                116
Minesite costs per tonne (C$) $                               122 $                                111
Production costs per ounce of gold produced ($ per ounce) $                               587 $                                724
Total cash costs per ounce of gold produced ($ per ounce) $                               601 $                                521

 

Gold production in the first six months of 2022 increased when compared to the prior-year period primarily due to higher gold grades, partially offset by lower mill throughput.  The LaRonde complex benefited from the mining of high grade stopes in the East mine early in 2022.  The lower mill throughput resulted from lower mine productivity due to lower than planned workforce availability related to COVID-19 in the first quarter of 2022.

 

Production costs per tonne in the first six months of 2022 decreased when compared to the prior-year period primarily as a result of the timing of unsold concentrate inventory, partially offset by lower throughput levels and higher unit costs for fuel, materials and reagents.  Production costs per ounce in the first six months of 2022 decreased when compared to the prior-year period primarily as a result of lower production costs per tonne and higher gold production.

 

Minesite costs per tonne in the first six months of 2022 increased when compared to the prior-year period primarily due to lower throughput levels and higher unit costs for fuel, materials and reagents.  Total cash costs per ounce in the first six months of 2022 increased when compared to the prior-year period primarily due to higher minesite costs per tonne, partially offset by higher gold production.

 

Operational Highlights

  • Gold production in the second quarter of 2022 was in line with expectations, as higher productivity from the LZ5 mine and higher gold grades from the LaRonde mine counterbalanced the lower ore tonnage from the LaRonde mine. With solid operational performance in the first half of 2022, the LaRonde complex is in a good position to deliver on 2022 guidance
  • The LaRonde mine has revised its mining sequence for the second half of 2022, factoring in the slower than expected development in the first quarter of 2022 and revised seismicity protocols and supplemental ground support requirements at the East mine. Production in the second half of 2022 is now expected to be slightly lower than the first half of 2022
  • The LaRonde complex has been successful at incrementally implementing automation for its production activities. During the second quarter of 2022 at the LaRonde mine, 31% of the production mucking was done in automated mode with operators based on surface, which slightly exceeded the 2022 target of 30%. During the second quarter of 2022 at the LZ5 mine, 23% of the production mucking was done in automated mode with operators based on surface which was in line with the 2022 target of 23%

 

Project Highlights

  • The construction of the drystack tailings facilities is progressing on schedule. The filter presses installation and the electrical and instrumentation work are almost complete. The drystack tailings facility is expected to be operational in November 2022
  • In the second quarter of 2022, the development or rehabilitation of three exploration drifts (track drifts 9.0 and 215 and exploration drift 290 west) from the LaRonde 3 infrastructure towards the west below the LZ5 mine workings progressed ahead of schedule. Drilling is ongoing from track drift 9.0 and from the exploration drift 290 west. Initial results are expected late in the third quarter of 2022

 

Canadian Malartic – Gold Production Ahead of Forecast due to Increased Productivity at Barnat Pit; Underground Development and Surface Construction Activities at Odyssey Remain on Schedule and on Budget

 

In June 2014, Agnico Eagle and Yamana Gold Inc. (“Yamana”) acquired Osisko Mining Corporation (now Canadian Malartic Corporation) and created the Partnership.  The Partnership owns the Canadian Malartic mine in northwestern Quebec and operates it through a joint management committee.  Each of Agnico Eagle and Yamana has a direct and indirect 50% ownership interest in the Partnership.  All volume data in this section reflect the Company’s 50% interest in the Canadian Malartic mine, except as otherwise indicated.  The Odyssey underground project was approved for construction in February 2021.

 

Canadian Malartic Mine – Operating Statistics
Three Months Ended Three Months Ended
June 30, 2022 June 30, 2021
Tonnes of ore milled (thousands of tonnes) (100%) 4,798 5,640
Tonnes of ore milled per day (100%) 52,725 61,978
Gold grade (g/t) 1.23 1.13
Gold production (ounces) 87,186 92,106
Production costs per tonne (C$) $                                   30 $                                   28
Minesite costs per tonne (C$) $                                   35 $                                   28
Production costs per ounce of gold produced ($ per ounce) $                                 647 $                                 689
Total cash costs per ounce of gold produced ($ per ounce) $                                 753 $                                 657

 

Gold production in the second quarter of 2022 decreased when compared to the prior-year period primarily due to lower mill throughput, partially offset by the expected higher gold grades due to the mining sequence and higher metallurgical recovery.  As planned, starting in February 2022, the mill throughput levels were reduced to approximately 51,500 tpd (on a 100% basis) in an effort to optimize the production profile during the transition to processing ore from the underground Odyssey project.  The mill throughput is forecast to return to full capacity of approximately 60,000 tpd (on a 100% basis) in the second half of 2024.

 

Production costs per tonne in the second quarter of 2022 increased when compared to the prior-year period primarily due to higher mine and mill production costs resulting from lower throughput levels, higher fuel costs and a lower deferred stripping adjustment, partially offset by the timing of inventory.  Production costs per ounce in the second quarter of 2022 decreased when compared to the prior-year period primarily due to higher gold grades and the timing of inventory, partially offset by higher production costs per tonne.

 

Minesite costs per tonne in the second quarter of 2022 increased when compared to the prior-year period primarily due to higher mine and mill production costs resulting from lower throughput levels, higher fuel costs and a lower deferred stripping adjustment.  Total cash costs per ounce in the second quarter of 2022 increased when compared to the prior-year period primarily due to higher production costs per tonne, partially offset by higher gold grades.

 

Canadian Malartic Mine – Operating Statistics
Six Months Ended Six Months Ended
June 30, 2022 June 30, 2021
Tonnes of ore milled (thousands of tonnes) (100%) 9,622 10,902
Tonnes of ore milled per day (100%) 53,160 60,232
Gold grade (g/t) 1.19 1.16
Gold production (ounces) 167,695 181,656
Production costs per tonne (C$) $                                   30 $                                   28
Minesite costs per tonne (C$) $                                   35 $                                   28
Production costs per ounce of gold produced ($ per ounce) $                                 676 $                                 655
Total cash costs per ounce of gold produced ($ per ounce) $                                 772 $                                 637

 

Gold production in the first six months of 2022 decreased when compared to the prior-year period primarily due to the planned reduction of mill throughput to approximately 51,500 tpd (100% basis) starting in February 2022, partially offset by higher metallurgical recovery and higher gold grades.

 

Production costs per tonne in the first six months of 2022 increased when compared to the prior-year period primarily due to higher mine and mill production costs resulting from lower throughput levels, higher fuel costs and a lower deferred stripping adjustment.  Production costs per ounce in the first six months of 2022 increased when compared to the prior-year period primarily due to higher production costs per tonne, partially offset by higher gold grades.

 

Minesite costs per tonne in the first six months of 2022 increased when compared to the prior-year period primarily due to higher mine and mill production costs resulting from lower throughput levels, higher fuel costs and a lower deferred stripping adjustment.  Total cash costs per ounce in the first six months of 2022 increased when compared to the prior-year period primarily due to higher production costs per tonne, partially offset by higher gold grades.

 

Operational Highlights

  • Higher productivity from the Barnat pit and solid operating performance overall resulted in gold production ahead of plan in the second quarter of 2022 and in line with expectations for the first half of 2022

 

Project Highlights

  • An update on Odyssey project development, construction and exploration highlights is set out in the Key Value Drivers section above

 

Goldex – Several Operational Monthly Records Set in May; Akasaba Project Approved for Development

 

The 100% owned Goldex mine in northwestern Quebec began production from the M and E zones in September 2013.  Commercial production from the Deep 1 Zone commenced on July 1, 2017.

 

Goldex Mine – Operating Statistics
Three Months Ended Three Months Ended
June 30, 2022 June 30, 2021
Tonnes of ore milled (thousands of tonnes) 738 723
Tonnes of ore milled per day 8,121 7,945
Gold grade (g/t) 1.74 1.66
Gold production (ounces) 36,877 34,659
Production costs per tonne (C$) $                                   46 $                                   43
Minesite costs per tonne (C$) $                                   46 $                                   43
Production costs per ounce of gold produced ($ per ounce) $                                 719 $                                 729
Total cash costs per ounce of gold produced ($ per ounce) $                                 718 $                                 685

 

 

Gold production in the second quarter of 2022 increased when compared to the prior-year period primarily due to higher gold grades and higher throughput levels resulting from higher productivity from the higher grade South Zone and higher throughput from the Rail-Veyor system.

 

Production costs per tonne in the second quarter of 2022 increased when compared to the prior-year period primarily due to higher mine development and production costs resulting from increase development and production from the South Zone and higher mill costs resulting from higher unit costs for reagents and grinding media, partially offset by an inventory adjustment.  Production costs per ounce in the second quarter of 2022 decreased when compared to the prior-year period primarily due to higher gold grades and an inventory adjustment, partially offset by higher production costs per tonne.

 

Minesite costs per tonne in the second quarter of 2022 increased when compared to the prior-year period for the factors causing higher production costs per tonne.  Total cash costs per ounce in the second quarter of 2022 increased when compared to the prior-year period due to higher minesite costs per tonne, partially offset by higher gold grades.

 

Goldex Mine – Operating Statistics
Six Months Ended Six Months Ended
June 30, 2022 June 30, 2021
Tonnes of ore milled (thousands of tonnes) 1,482 1,450
Tonnes of ore milled per day 8,188 8,011
Gold grade (g/t) 1.69 1.65
Gold production (ounces) 71,322 69,309
Production costs per tonne (C$) $                                   45 $                                   41
Minesite costs per tonne (C$) $                                   46 $                                   41
Production costs per ounce of gold produced ($ per ounce) $                                 740 $                                 689
Total cash costs per ounce of gold produced ($ per ounce) $                                 746 $                                 654

 

 

Gold production in the first six months of 2022 increased when compared to the prior-year period primarily due to higher gold grades and higher throughput levels.  In the first six months of 2022, the Goldex mine continued to deliver a solid performance in line with the production plan and included increased production from the higher grade South Zone and higher throughput from the Rail-Veyor system.

 

Production costs per tonne in the first six months of 2022 increased when compared to the prior-year period primarily due to higher mine development and production costs resulting from higher ground support costs and increased development and production from the South Zone and higher mill costs resulting from higher unit costs for reagents and grinding media.  Production costs per ounce in the first six months of 2022 increased when compared to the prior-year period primarily due to higher production costs per tonne, partially offset by higher gold grades.

 

Minesite costs per tonne in the first six months of 2022 increased when compared to the prior-year period primarily due to the factors causing higher production costs per tonne.  Total cash costs per ounce in the first six months of 2022 increased when compared to the prior-year period due to higher minesite costs per tonne, partially offset by higher gold grades.

 

Operational Highlights

  • During the second quarter of 2022, gold production was above forecast as a result of higher productivity from the South Zone and higher throughput from the Rail-Veyor system
  • The Goldex mine set monthly records in May 2022 for ore hoisting at 280,835 tonnes, total hoisting at 298,898 tonnes, underground mucking at 284,642 tonnes, ore conveyed by the Rail-Veyor system at 248,290 tonnes and ore milled at 273,186 tonnes
  • The strong overall operational performance in the first half of 2022 puts the Goldex mine in a good position to deliver on 2022 guidance

 

Akasaba Project Approved for Development

  • The Company has approved the development of the Akasaba West project. Located less than 30 kilometres from Goldex, the project is expected to contribute approximately 1,500 tpd to the Goldex mill and provide additional production flexibility
  • The Company acquired the Akasaba West gold-copper deposit in January 2014. All required permits were received in 2018. In February 2019, the Company decided to postpone the development of the Akasaba West project based on the prioritization of development capital spending. Akasaba West contains probable mineral reserves of 147,000 ounces of gold and 25,895 tonnes of copper (5.4 million tonnes grading 0.84 g/t gold and 0.48% copper)
  • The Akasaba West project represents a low pre-production capital investment of approximately C$50 million over two years of construction. Production is expected to start in 2024

 

ABITIBI REGION, ONTARIO

 

Agnico Eagle acquired the Detour Lake and Macassa mines on February 8, 2022 as a result of the Merger with Kirkland Lake Gold.  With the inclusion of these two assets in its portfolio, the Company is now Ontario’s largest gold producer.  Furthermore, the proximity of these mines to the Company’s operations located in the Abitibi region of Quebec provides operating synergies and allows for the sharing of technical expertise.

 

Detour Lake – Higher Gold Grades Drive Strong Operational Performance; Mill Optimization Projects Designed to Increase Throughput to 28 Million Tonnes Per Year Progressing as Planned

 

The Detour Lake mine is located in northeastern Ontario, approximately 300 kilometres northeast of Timmins and 185 kilometres by road northeast of Cochrane, within the northernmost portion of the Abitibi Greenstone Belt.

 

In 1987, Placer Dome Inc. began underground gold production at the Detour Lake property and during the initial 12 years of mining (from 1987 to 1999) production was approximately 1.7 million ounces of gold from approximately 14.3 million tonnes grading 3.82 g/t gold.  In 2013, Detour Gold Corporation restarted gold production via open pit mining.  The Detour Lake mine is now the largest gold producing mine in Canada with the largest gold reserves and substantial growth potential.  It has an estimated mine life of approximately 30 years.

 

Detour Lake – Operating Statistics*
Three Months Ended Six Months Ended
June 30, 2022 June 30, 2022
Tonnes of ore milled (thousands of tonnes) 6,519 9,789
Tonnes of ore milled per day 71,638 68,455
Gold grade (g/t) 1.01 1.02
Gold production (ounces) 195,515 295,958
Production costs per tonne (C$) $                                 27 $                                 33
Minesite costs per tonne (C$) $                                 24 $                                 24
Production costs per ounce of gold produced ($ per ounce) $                               703 $                               870
Total cash costs per ounce of gold produced ($ per ounce) $                               640 $                               626
*In the first six months of 2022, the operating statistics are reported for the period from February 8, 2022 to June 30, 2022.

 

In the second quarter of 2022, gold production at the Detour Lake mine was 195,515 ounces, with production costs per tonne of C$27, production costs per ounce of $703, minesite costs per tonne of C$24 and total cash costs per ounce of $640.

 

For the period from February 8, 2022 to June 30, 2022, gold production at the Detour Lake mine was 295,958 ounces, with production costs per tonne of C$33, production costs per ounce of $870, minesite costs per tonne of C$24 and total cash costs per ounce of $626.

 

In the first six months of 2022, the difference between production costs per tonne and minesite costs per tonne and the difference between production costs per ounce and total cash costs per ounce are primarily due to the inventory re-valuation at the forecast gold price in the period the inventory was expected to be sold, which was done as part of the Purchase Price Allocation following the completion of the Merger.

 

Operational Highlights

  • For the complete first six months of 2022, gold production at the Detour Lake mine was ahead of forecast at 377,348 ounces. In the first six months of 2022, the Detour Lake mine benefited from positive grade reconciliation
  • Tonnage milled was slightly under forecast as a lower mill availability than forecast was offset by higher throughput
  • In the second quarter of 2022, despite cost pressures related to higher fuel and higher electricity prices, the Detour Lake mine achieved lower total cash costs per ounce than guided primarily due to higher gold grade. With the optimization efforts ongoing and the strong first half of 2022, the Company believes that the Detour Lake mine is in a good position to deliver on 2022 production and cost guidance
  • In the second quarter of 2022, the Company completed a technical evaluation on its Detour Lake mine. As a result of this evaluation, the Detour Lake mine mineral reserves increased by 38% to 20.4 million ounces as at March 31, 2022, the updated life of mine plan improved the production profile and extended the mine life by 10 years. Further details on the outcome of the evaluation are set in the Key Value Drivers section above

 

Project Highlights

  • An update on the projects undertaken to gradually increase the mill throughput to 28 Mtpa by 2025 and on potential expansion scenarios is set out in the Key Value Drivers section above

 

Macassa – Strong Safety and Operational Performance; Shaft #4 Project and Ventilation Upgrade on Schedule for Commissioning in Late 2022

 

The Macassa Mine, located in northeastern Ontario, began production in 1933.  Operations have been continuous except for a brief period, when they were suspended in 1999 due to the depressed gold price.  Underground mining restarted in 2002 and over the last 10 years production has been predominately from two production areas: the South Mine Complex (SMC) and the Main Break (MB).

 

Macassa Mine – Operating Statistics*
Three Months Ended Six Months Ended
June 30, 2022 June 30, 2022
Tonnes of ore milled (thousands of tonnes) 88 135
Tonnes of ore milled per day 970 945
Gold grade (g/t) 22.02 20.15
Gold production (ounces) 61,262 85,750
Production costs per tonne (C$) $                                 479 $                               615
Minesite costs per tonne (C$) $                                 519 $                               520
Production costs per ounce of gold produced ($ per ounce) $                                 539 $                               762
Total cash costs per ounce of gold produced ($ per ounce) $                                 582 $                               641
*In the first six months of 2022, the operating statistics are reported for the period from February 8, 2022 to June 30, 2022.

 

 

In the second quarter of 2022, gold production at the Macassa mine was 61,262 ounces, with production costs per tonne of C$479, production costs per ounce of $539, minesite costs per tonne of C$519 and total cash costs per ounce of $582.

 

For the period from February 8, 2022 to June 30, 2022, gold production at the Macassa mine was 85,750 ounces, with production costs per tonne of C$615, production costs per ounce of $762, minesite costs per tonne of C$520 and total cash costs per ounce of $641.

 

In the first six months of 2022, the difference between production costs per tonne and minesite costs per tonne and the difference between production costs per ounce and total cash costs per ounce are primarily due to the inventory re-valuation at the forecasted gold price in the period the inventory was expected to be sold, which was done as part of the Purchase Price Allocation following the completion of the Merger.

 

Operational Highlights

  • In the second quarter 2022, the Macassa mine had strong results in terms of health and safety, recording its second best quarterly performance since 2016
  • For the complete first six months of 2022, gold production at the Macassa mine was 105,205 ounces. The higher than forecast mined and milled tonnage was partially offset by lower mined grades than anticipated
  • The connection of Shaft #4 to the mine infrastructure resulted in increased ventilation in the deep mine which contributed to reducing air temperatures and improve working conditions underground
  • The improved ventilation, significantly better equipment availability and other operational efficiencies drove strong operational performance in the second quarter of 2022.
  • The lower than anticipated gold grade was primarily due to variability in the high-grade nature of the mineralization
  • In the second quarter of 2022, the Macassa mine achieved lower minesite costs per tonne and total cash costs per ounce than forecast primarily due to higher productivity.  The Company believes that the Macassa mine is in a good position to deliver on 2022 production and cost guidance

 

Project Highlights

  • In the second quarter of 2022, the planned work on the Shaft #4 project remained on schedule and the commissioning of Shaft #4 is still expected in late 2022. The preparation of the production and service hoists was completed. Commissioning of Shaft #4 is expected in later 2022
  • The upgrade of the ventilation system progressed as planned. This upgrade is expected to increase ventilation capacity from approximately 300,000 cubic feet per minute to 750,000 cubic feet per minute to support the planned increase in underground production in 2023 and 2024. At the end of the second quarter of 2022, the fourth and final ventilation raise was completed
  • The excavation of the underground chamber for the main exhaust fans was completed and the two 3,000 HP fans were received at site in the second quarter of 2022. The fans are expected to be installed in the third quarter of 2022 and commissioned in the fourth quarter of 2022
  • Construction to facilitate the increase in the power supply at the Macassa mine from 22 megawatts to 67 megawatts is expected to commence in the third quarter of 2022 and the upgrade is expected to be completed in late 2023

 

NUNAVUT

 

Agnico Eagle considers Nunavut a politically attractive and stable jurisdiction with enormous geological potential.  With the Company’s Meliadine mine and Meadowbank complex (including the Amaruq satellite deposit), together with the Hope Bay project and other exploration projects, Nunavut has the potential to be a strategic operating platform for the Company with the ability to generate strong gold production and cash flows over several decades.

 

In December 2021, as a result of the increase in COVID-19 cases at its Nunavut operations, the Company took the precautionary step to send home the Nunavut based workforce and reduce site activities.  All site activities ramped back to normal operating levels from mid-January into February 2022.  The return of the Nunavut based workforce started on March 14, 2022, after consultation with the Nunavut Government and other local stakeholders.  The reintegration was completed in early April 2022.

 

Meliadine Mine – Gold Production In Line with Forecast due to Strong Mill Performance and Ramp Up of Underground Operations; Testing of Autonomous Haulage Yields Positive Results

 

Located near Rankin Inlet in the Kivalliq District of Nunavut, Canada, the Meliadine project was acquired in July 2010.  The Company owns 100% of the 98,222-hectare property.  In February 2017, the Company’s Board of Directors approved the construction of the Meliadine project and commercial production was declared on May 14, 2019.

 

Meliadine Mine – Operating Statistics*
All metrics exclude pre-commercial production tonnes and ounces Three Months Ended Three Months Ended
June 30, 2022 June 30, 2021
Tonnes of ore milled (thousands of tonnes) 449 324
Tonnes of ore milled per day** 4,934 4,585
Gold grade (g/t) 6.97 7.48
Gold production (ounces) 97,572 87,641
Production costs per tonne (C$) $                                244 $                                232
Minesite costs per tonne (C$) $                                234 $                                222
Production costs per ounce of gold produced ($ per ounce) $                                885 $                                691
Total cash costs per ounce of gold produced ($ per ounce) $                                837 $                                616
*In the second quarter of 2021, the Tiriganiaq open pit had 9,053 ounces of pre-commercial gold production.
**Excluding tonnes milled on a pre-commercial production basis, the mill operated for an equivalent of 71 days in the second quarter of 2021

 

Gold production in the second quarter of 2022 increased when compared to the prior-year period primarily due to higher throughput levels, partially offset lower gold grades resulting from an increase in tonnage sourced from the open pit.  To compensate for the shortfall in mine production in the second quarter of 2022, low-grade stockpile ore was used to feed to the mill.

 

Production costs per tonne in the second quarter of 2022 increased when compared to the prior-year period due to inventory adjustments resulting from the consumption of the stockpile and the timing of unsold inventory, partially offset by higher throughput levels and a higher deferred stripping adjustment.  Production costs per ounce in the second quarter of 2022 increased when compared to the prior-year period due to lower gold grades and higher production costs per tonne and the timing of unsold inventory.

 

Minesite costs per tonne in the second quarter of 2022 increased when compared to the prior-year period primarily due to inventory adjustments resulting from the consumption of the stockpile, partially offset by higher throughput levels and a higher deferred stripping adjustment.  Total cash costs per ounce in the second quarter of 2022 increased when compared to the prior-year period due to lower gold grades and higher minesite costs per tonne.

 

Meliadine Mine – Operating Statistics*
All metrics exclude pre-commercial production tonnes and ounces Six Months Ended Six Months Ended
June 30, 2022 June 30, 2021
Tonnes of ore milled (thousands of tonnes) 881 662
Tonnes of ore milled per day** 4,867 4,598
Gold grade (g/t) 6.51 7.47
Gold production (ounces) 178,276 175,644
Production costs per tonne (C$) $                                237 $                       219
Minesite costs per tonne (C$) $                                237 $                       220
Production costs per ounce of gold produced ($ per ounce) $                                926 $                       713
Total cash costs per ounce of gold produced ($ per ounce) $                                912 $                       622
*In the first six months of 2021, the Tiriganiaq open pit had 17,176 ounces of pre-commercial gold production.
**Excluding tonnes milled on a pre-commercial production basis, the mill operated for an equivalent of 144 days in the first six months of 2021

 

Gold production in the first six months of 2022 increased when compared to the prior-year period primarily due to higher throughput levels resulting from the planned expansion of the mill to 4,800 tpd, partially offset by lower gold grades resulting from increased ore tonnes sourced from the open pit and the lower grade stockpiles.  The COVID-19 pandemic affected the underground mine activities, particularly in January 2022.  To compensate for the shortfall in mine production in the first six months of 2022, low-grade stockpile ore was used to feed to the mill.

 

Production costs per tonne in the first six months of 2022 increased when compared to the prior-year period due to inventory adjustments resulting from the consumption of the low-grade stockpile, partially offset by higher throughput levels and a higher deferred stripping adjustment.  Production costs per ounce in the first six months of 2022 increased when compared to the prior-year period due to lower gold grades and higher production costs per tonne.

 

Minesite costs per tonne in the first six months of 2022 increased when compared to the prior-year period primarily due to inventory adjustments resulting from the consumption of the low-grade stockpile, partially offset by higher throughput levels and a higher deferred stripping adjustment.  Total cash costs per ounce in the first six months of 2022 increased when compared to the prior-year period due to lower gold grades and higher minesite costs per tonne.

 

Operational Highlights

  • In the second quarter of 2022, gold production was in line with forecast driven primarily by strong mill performance. The mill throughput at 4,934 tpd exceeded the planned capacity of 4,800 tpd, supported by good productivity from the open pit operation and the consumption of low grade stockpiles
  • After a challenging start of the year, both underground development and ore production improved through the second quarter of 2022 but were still slightly behind forecast, primarily due to lower than planned workforce and equipment availability and by the start of this year’s caribou migration
  • This year’s caribou migration started earlier and had a higher impact on the operation than in prior years. The Company continues to work with government and local stakeholders to ensure that mining activities have a minimal impact on Caribou migration
  • In the second quarter of 2022, the Meliadine mine achieved a milestone in its implementation of automated and autonomous production activities. The mine began full shifts of autonomous haulage during fly-out days in June, which resulted in approximately a threefold improvement on haulage productivity during those low production days

 

Permitting

  • Metal and diamond mines in Canada are subject to the Metal and Diamond Mining Effluent Regulations (“MDMER”).  The MDMER set out mandatory requirements for the monitoring of discharge water and the receiving environment for mine operators.  Effective December 1, 2021, the MDMER were amended to require testing using the new test species Acartia tonsa (“A. tonsa”) for saline discharge with a salinity over 4.4 parts per thousand to marine environments.  The A. tonsa test method is a new laboratory test method developed by Environment and Climate Change Canada
  • The Company will continue to comply with the applicable regulations and will continue to work with the regulators to reduce uncertainty for water management

 

Projects

  • The Phase 2 mill expansion is expected to be completed in mid-2024 when the processing rate is forecast to increase to 6,000 tpd.  Engineering work and procurement activities are progressing according to plan.  The main contracts for construction of the CIL, filter-press and power plant buildings and the CIL process tank were awarded in the second quarter of 2022

 

Meadowbank Complex – Strong Operational Performance and Higher than Anticipated Grades from Whale Tail and IVR Drive Record Quarterly Gold Production; High Pressure Grinding Rolls Commissioned

 

The 100% owned Meadowbank complex is located approximately 110 kilometres by road north of Baker Lake in the Kivalliq District of Nunavut, Canada.  The complex consists of the Meadowbank mine and mill and the Amaruq satellite deposit, which is located 50 kilometres northwest of the Meadowbank mine.  The Meadowbank mine achieved commercial production in March 2010, and mining activities at the site were completed by the fourth quarter of 2019.

 

The Amaruq mining operation uses the infrastructure at the Meadowbank minesite.  Additional infrastructure has also been built at the Amaruq site.  Amaruq ore is transported using long haul off-road type trucks to the mill at the Meadowbank site for processing.  The Amaruq satellite deposit achieved commercial production on September 30, 2019.

 

Meadowbank Complex – Operating Statistics
Three Months Ended Three Months Ended
June 30, 2022 June 30, 2021
Tonnes of ore milled (thousands of tonnes) 930 879
Tonnes of ore milled per day 10,220 9,680
Gold grade (g/t) 3.49 3.29
Gold production (ounces) 96,698 85,551
Production costs per tonne (C$) $                                147 $                                137
Minesite costs per tonne (C$) $                                135 $                                138
Production costs per ounce of gold produced ($ per ounce) $                             1,110 $                             1,126
Total cash costs per ounce of gold produced ($ per ounce) $                                993 $                             1,077

 

 

In the second quarter of 2022, gold production increased when compared to the prior-year period primarily due to higher throughput resulting from a strong operating performance and higher gold grades resulting from a higher than anticipated grade sequence in the Whale Tail and IVR open pits.

 

Production costs per tonne in the second quarter of 2022 increased when compared to the prior-year period primarily due to the timing of unsold inventory, a lower deferred stripping adjustment and higher services costs related to inflationary pressures on transportation, partially offset by inventory adjustments resulting from the build-up of the stockpile and higher throughput levels.  Production costs per ounce in the second quarter of 2022 decreased when compared to the prior-year period due to higher gold grades, partially offset by higher production costs per tonne and the timing of unsold inventory.

 

Minesite costs per tonne in the second quarter of 2022 decreased when compared to the prior-year period primarily due to inventory adjustments resulting from the build-up of the stockpile and higher throughput levels, partially offset by a lower deferred stripping adjustment and higher services costs related to inflationary pressures on transportation.  Total cash costs per ounce in the second quarter of 2022 decreased when compared to the prior-year period primarily due to higher gold grades and lower production costs per tonne.

 

Meadowbank Complex – Operating Statistics
Six Months Ended Six Months Ended
June 30, 2022 June 30, 2021
Tonnes of ore milled (thousands of tonnes) 1,785 1,803
Tonnes of ore milled per day 9,862 9,972
Gold grade (g/t) 2.94 3.11
Gold production (ounces) 156,463 165,516
Production costs per tonne (C$) $                                145 $                                129
Minesite costs per tonne (C$) $                                149 $                                134
Production costs per ounce of gold produced ($ per ounce) $                             1,304 $                             1,110
Total cash costs per ounce of gold produced ($ per ounce) $                             1,305 $                             1,099

 

 

In the first six months of 2022, gold production decreased when compared to the prior-year period primarily due to lower gold grades resulting from an increase in tonnage sourced from low grade stockpile and slightly lower throughput levels.  In the first quarter of 2022, the Meadowbank complex was affected by the COVID-19 pandemic and activities were reduced to essential services from December 22, 2021 to January 10, 2022.  Subsequently, production activities were gradually ramped up to normal operating levels into early February 2022.  Ore from a low grade stockpile was used to feed the mill as the open pit activities ramped up in January.  The reduced production in the first quarter of 2022 was partially offset by a strong operational performance in the second quarter of 2022..

 

Production costs per tonne in the first six months of 2022 increased when compared to the prior-year period primarily due to higher services costs related to inflationary pressures on transportation and the COVID-19 pandemic, and inventory adjustments resulting from the consumption of the low-grade stockpile.  Production costs per ounce in the first six months of 2022 increased when compared to the prior-year period due to lower gold grades and higher production costs per tonne.

 

Minesite costs per tonne in the first six months of 2022 increased when compared to the prior-year period primarily due to the factors causing higher production costs per tonne.  Total cash costs per ounce in the first six months of 2022 increased when compared to the prior-year period primarily due to lower gold grades and higher production costs per tonne.

 

Operational Highlights

  • In the second quarter of 2022, Amaruq set a new quarterly record for gold production since declaring commercial production on September 30, 2019. This record was driven by strong performance from all aspects of the operation and a positive grade reconciliation
  • At the open pit, improvement in operational efficiencies and mechanical availability resulted in better-than-planned production drilling, tonnes moved, ore mined and ore hauled in the second quarter of 2022. The broken muck inventory remained above two million tonnes at the end of June
  • In June 2022, higher grade ore was mined sooner than anticipated at both the Whale Tail and IVR pits. This higher grade material is expected to drive strong gold production in the third quarter of 2022 and sets the Meadowbank complex in a good position to meet 2022 production guidance
  • Mill availability and throughput was slightly lower than forecast due to the commissioning of the high pressure grinding rolls. With the commissioning of the high pressure grinding rolls now completed, and combined with the optimization projects carried out at the mill, the Company expects to continue to maximize the mill throughput for the remainder of the year
  • This year’s caribou migration started in March and was mostly complete by May 2022. The caribou migration had a minimal impact on the operation in the second quarter of 2022. While the Company factors the migration into its production forecast, wildlife management is an important priority and, given the unpredictability of the seasonal migration, the Company continues to work with government and local stakeholders to adopt protocols to protect the caribou migration while minimizing production disruptions

 

Underground Project Highlights

  • Following a challenging start of the year due to COVID-19, underground development and construction activities continued to ramp-up in the second quarter of 2022
  • The commissioning of several key infrastructure projects is ongoing, including the cemented rock fill plant and the emulsion plant. The development of the main ventilation raise was approximately 85% completed at the end of the second quarter of 2022. The construction tie-in of the main ventilation system is expected to be completed early in the third quarter of 2022
  • The first test stope was mined in July 2022 and a second stope will be mined in the third quarter to provide additional metallurgical data. Milling of this underground material is expected to begin late in the third quarter of 2022
  • The Company is focused on advancing priority aspects of the project and expects to achieve commercial production in late 2022

 

Hope Bay Project – Drilling Activities Ramped Up in the Second Quarter of 2022; Larger Production Scenarios Continues to be Evaluated

 

Located in the Kitikmeot District of Nunavut, Canada, approximately 125 kilometres southwest of Cambridge Bay, the Hope Bay project was acquired in February 2021.  The Company owns 100% of the 191,342-hectare property, which includes portions of the Hope Bay and Elu greenstone belts.  The 80-kilometre long Hope Bay greenstone belt hosts three gold deposits (Doris, Madrid and Boston) with mineral reserves and mineral resources and over 90 regional exploration targets.  At the time the Hope Bay project was acquired, construction at the Doris deposit was complete and commercial production had been achieved in the second quarter of 2017.

 

On February 18, 2022, the Company announced that it decided to maintain the suspension of production activities at the Doris mine, in order to dedicate the infrastructure of the Hope Bay site to exploration activities.  An update on exploration carried out in the second quarter of 2022 is presented in the Key Value Drivers section above.

 

Exploration is expected to continue through 2023 while larger production scenarios are being evaluated.  Detailed results from the 2022 exploration program at Hope Bay will be presented in an exploration-focused news release on August 11, 2022.

 

AUSTRALIA

 

Agnico Eagle acquired the Fosterville mine on February 8, 2022 as a result of the Merger with Kirkland Lake Gold.  As the largest gold producer in the state of Victoria, Australia, the 100% owned Fosterville mine is a high-grade underground gold mine, located 20 kilometres from the city of Bendigo.  The operation features low-cost gold production, as well as extensive in-mine and district scale exploration potential.

 

Fosterville – Solid Gold Production in Line with Forecast; Exploration Drifts at Robbins Hill and Lower Phoenix Completed

 

Gold production at the Fosterville mine commenced in 1991 from shallow oxide open pits and heap-leaching operations and was suspended in 2001 subsequent to the depletion of oxide ore.  In 2005, gold production restarted from an open pit, sulphide mining operation, with mining activities progressively transitioning to underground.  Based on exploration success, in particular the discovery of the high grade Eagle and Swan mineralized zones, the Fosterville mine output increased rapidly year over year from 2016 to 2020.  Exploration activities continue to expand its mineral reserves and mineral resources as the deposit remains open at depth in the Harrier, Lower Phoenix and Robbins Hill areas.

 

Fosterville Mine – Operating Statistics*
Three Months Ended Six Months Ended
June 30, 2022 June 30, 2022
Tonnes of ore milled (thousands of tonnes) 122 213
Tonnes of ore milled per day 1,331 1,486
Gold grade (g/t) 22.24 24.76
Gold production (ounces) 86,065 167,892
Production costs per tonne (A$) $                                 597 $                                890
Minesite costs per tonne (A$) $                                 370 $                                369
Production costs per ounce of gold produced ($ per ounce) $                                 561 $                                812
Total cash costs per ounce of gold produced ($ per ounce) $                                 351 $                                331
*In the first six months of 2022, the operating statistics are reported for the period from February 8, 2022 to June 30, 2022.

 

In the second quarter of 2022, gold production at the Fosterville mine was 86,065 ounces, with production costs per tonne of A$597, production costs per ounce of $561, minesite costs per tonne of A$370 and total cash costs per ounce of $351.

 

For the period from February 8, 2022 to June 30, 2022, gold production at the Fosterville mine was 167,892 ounces, with production costs per tonne of A$890, production costs per ounce of $812, minesite costs per tonne of A$369 and total cash costs per ounce of $331.

 

In the first six months of 2022, the difference between production costs per tonne and minesite costs per tonne and the difference between production costs per ounce and total cash costs per ounce are primarily due to the inventory re-valuation at the forecasted gold price in the period the inventory was expected to be sold, which was done as part of the Purchase Price Allocation following the completion of the Merger.

 

Operational Highlights

  • For the complete first six months of 2022, the Fosterville mine delivered solid operational performance with gold production of 212,772 ounces, which was above forecast
  • Mine production continues to be affected by primary ventilation operating restrictions related to low frequency noise constraints. In the second quarter and the first six months of 2022, the Company has successfully adjusted the mining sequence to offset production impacts
  • The Company remains focused on reducing the regenerative noise from the existing main ventilation fans’ silencers. The Company is also evaluating the potential installation of the primary fans underground in the longer term
  • Based on the adjusted mining sequence, the Fosterville mine is expected to have lower gold production in the third quarter, while the fourth quarter is expected to be the strongest quarter of the year based on the expected timing of mining ultra-high grade stopes
  • In the second quarter of 2022, the Fosterville mine achieved lower total cash costs per ounce than anticipated as the higher gold grades offset the increase in minesite costs per tonne related to the lower throughput levels. Based on solid performance to date and expected strong production in the fourth quarter of 2022, the Company believes the mine is well positioned to deliver on 2022 production and cost guidance for this year

 

Project Highlights

  • In the second quarter of 2022, the Robbins Hill exploration decline and the Lower Phoenix exploration decline were completed. The completion of these exploration drifts sets the Company in a good position to accelerate the exploration and conversion drilling in these prospective areas in the second half of 2022
  • Four underground ventilation raises are planned to be excavated at Phoenix and Harrier to upgrade the ventilation system and extend the service of the surface primary fans. Raise boring of the first ventilation raise began in the third quarter of 2022. Completion of the full ventilation upgrade project is expected to be completed in the first half of 2024

 

FINLAND

 

Agnico Eagle’s Kittila mine in Finland is the largest primary gold producer in Europe.  The expansion of the Kittila mill to 2.0 million tonnes per year was completed in the fourth quarter of 2020.  An underground shaft is under construction and is expected to be commissioned in late 2022 or early 2023.  Exploration activities continue to expand the mineral reserves and mineral resources at the Kittila mine.  Near mine exploration remains the main focus as the deposit remains open at depth and laterally.

 

Kittila – Record Quarterly Mill Throughput Drives Record Quarterly Gold Production; Shaft Project on Schedule to Start Commissioning in the Fourth Quarter of 2022

 

The 100% owned Kittila mine in northern Finland achieved commercial production in 2009.

 

Kittila Mine – Operating Statistics
Three Months Ended Three Months Ended
June 30, 2022 June 30, 2021
Tonnes of ore milled (thousands of tonnes) 556 483
Tonnes of ore milled per day 6,110 5,308
Gold grade (g/t) 4.35 3.96
Gold production (ounces) 64,814 53,263
Production costs per tonne (EUR) €                                   89 €                                   83
Minesite costs per tonne (EUR) €                                   88 €                                   83
Production costs per ounce of gold produced ($ per ounce) $                                 823 $                                 900
Total cash costs per ounce of gold produced ($ per ounce) $                                 828 $                                 913

 

Gold production in the second quarter of 2022 increased when compared to the prior-year period primarily due to the expected higher gold grades due to the mining sequence and higher throughput.  A strong operating performance in the second quarter of 2022 resulted in a record quarterly ore milled at 556,000 tonnes, while in the second quarter of 2021 the mill completed a planned eleven-day shutdown for regular maintenance on the autoclave.

 

Production costs per tonne in the second quarter of 2022 increased when compared to the prior-year period primarily due to higher mine and mill production costs resulting from higher unit costs for fuel, power, ground support and reagents, inventory adjustments resulting from the consumption of the stockpile and the timing of unsold inventory, partially offset by higher throughput levels.  Production costs per ounce in the second quarter of 2022 decreased when compared to the prior-year period due to the weakening of the Euro against the U.S. dollar and higher gold grades, partially offset by higher production costs per tonne and the timing of unsold inventory.

 

Minesite costs per tonne in the second quarter of 2022 increased when compared to the prior-year period primarily due to higher mine and mill production costs resulting from higher unit costs for fuel, power, ground support and reagents, and inventory adjustments resulting from the consumption of the stockpile, partially offset by higher throughput levels.  Total cash costs per ounce in the second quarter of 2022 decreased when compared to the prior-year period due to the weakening of the Euro against the U.S. dollar and higher gold grades, partially offset by higher minesite costs per tonne.

 

Kittila Mine – Operating Statistics
Six Months Ended Six Months Ended
June 30, 2022 June 30, 2021
Tonnes of ore milled (thousands of tonnes) 1,017 977
Tonnes of ore milled per day 5,619 5,398
Gold grade (g/t) 4.01 4.17
Gold production (ounces) 110,322 113,979
Production costs per tonne (EUR) €                                   92 €                                   83
Minesite costs per tonne (EUR) €                                   89 €                                   83
Production costs per ounce of gold produced ($ per ounce) $                                 932 $                                 848
Total cash costs per ounce of gold produced ($ per ounce) $                                 915 $                                 852

 

Gold production in the first six months of 2022 decreased when compared to the prior-year period primarily due to lower gold grades and lower metallurgical recoveries, partially offset by higher throughput levels.  Gold grades in the first six months of 2022 were lower than anticipated due to a delay in reaching the higher grade stopes in the Roura Zone due to poor ground conditions and as a result of higher dilution in the secondary stopes.

 

Production costs per tonne in the first six months of 2022 increased when compared to the prior-year period primarily due to higher mine and mill production costs resulting from higher unit costs for fuel, power, ground support and reagents and the timing of unsold inventory, partially offset by higher throughput levels.  Production costs per ounce in the first six months of 2022 increased when compared to the prior-year period due to lower gold grades, higher production costs per tonne and the timing of unsold inventory, partially offset by the weakening of the Euro against the U.S. dollar.

 

Minesite costs per tonne in the first six months of 2022 increased when compared to the prior-year period primarily due to higher mine and mill production costs resulting from higher unit costs for fuel, power, ground support and reagents, partially offset by higher throughput levels.  Total cash costs per ounce in the first six months of 2022 increased when compared to the prior-year period due to lower gold grades and higher production costs per tonne, partially offset by the weakening of the Euro against the U.S. dollar.

 

Operational Highlights

  • After a challenging first quarter of 2022, the Kittila mine delivered strong operational performance in the second quarter of 2022. Record quarterly mill throughput at 556,000 tonnes drove a record quarterly gold production at 64,814 ounces
  • The optimization of the mining sequence and improved operational efficiencies contributed to exceeding the underground production forecast. In addition, the prioritization of the development of the higher grade stopes at Roura resulted in a significant improvement in gold grades in the second quarter of 2022
  • In the second quarter of 2022, metallurgical recovery was lower than anticipated. A five-day mill shut down to reduce scale build-up in the autoclave is planned early in the third quarter of 2022 and is expected to resolve the issue
  • The upgrade of the network to 5G is progressing as planned. The first 5G video calls were done from underground in the second quarter of 2022. The Kittila mine is expected to be the first underground mine equipped with a 5G network. As part of this initiative, the Company continues to evaluate future automation opportunities while collaborating with equipment manufacturers

 

Permitting

  • In 2020, the Regional State Administrative Agency of Northern Finland granted Agnico Eagle Finland Oy (“Agnico Finland”) environmental and water permits that would allow Agnico Finland to enlarge the CIL2 tailings storage facility, expand the operations of the Kittila mine to 2.0 Mtpa and build a new discharge waterline. The permits were subsequently appealed to the Vaasa Administrative Court in Finland. The appeals were granted, in part, in July 2022 with the result that the permits were returned for reconsideration by the Regional State Administrative Agency of Northern Finland
  • The Company is evaluating the decisions of the Vaasa Administrative Court to determine the impact they may have on operations at the Kittila mine.  In addition, the Company will appeal the decisions of the Vaasa Administrative Court to the Supreme Administrative Court of Finland in early August.  The Company intends to continue to operate at current levels while it communicates with relevant regulatory authorities and other stakeholders to determine additional next steps regarding these permits

 

Project Highlights

  • Shaft construction continues to progress as planned. Shaft sinking is expected to be completed in the third quarter of 2022 and commissioning of the production hoist remains on schedule for the fourth quarter of 2022
  • As part of the expansion project at the mine, the construction of a nitrogen removal plant is progressing as scheduled. Commissioning of the plant is expected to begin in the third quarter of 2022

 

MEXICO

 

Agnico Eagle’s Mexican operations have been a solid source of precious metals production (gold and silver) with stable operating costs and strong free cash flow since 2009.

 

Pinos Altos – Increased Underground Rehabilitation and Backlog in Underground Development Impacted Gold Production in the Second Quarter of 2022; New Ore Shoot Discovered in the Eastern Projection of the North Cubiro deposit

 

The 100% owned Pinos Altos mine in northern Mexico achieved commercial production in November 2009.

 

Pinos Altos Mine – Operating Statistics
Three Months Ended Three Months Ended
June 30, 2022 June 30, 2021
Tonnes of ore processed (thousands of tonnes) 366 521
Tonnes of ore processed per day 4,022 5,725
Gold grade (g/t) 2.02 2.07
Gold production (ounces) 23,020 32,614
Production costs per tonne $ 109 $ 76
Minesite costs per tonne $ 101 $ 70
Production costs per ounce of gold produced ($ per ounce) $ 1,732 $ 1,206
Total cash costs per ounce of gold produced ($ per ounce) $ 1,383 $ 849

 

Gold production in the second quarter of 2022 decreased when compared to the prior-year period primarily due to lower throughput levels resulting from lower underground productivity related to lower stope availability resulting from higher rehabilitation requirements at the Santo Niño and Cerro Colorado zones in the first quarter of 2022.

 

Production costs per tonne in the second quarter of 2022 increased when compared to the prior-year period primarily due to lower throughput levels and the timing of inventory.  Production costs per ounce in the second quarter of 2022 increased when compared to the prior-year period due to higher production costs per tonne and the timing of the inventory.

 

Minesite costs per tonne in the second quarter of 2022 increased when compared to the prior-year period primarily due to lower throughput levels.  Total cash costs per ounce in the second quarter of 2022 increased when compared to the prior-year period due to higher minesite costs per tonne and lower by-product revenues from lower silver sales.

 

Pinos Altos Mine – Operating Statistics
Six Months Ended Six Months Ended
June 30, 2022 June 30, 2021
Tonnes of ore processed (thousands of tonnes) 750 1,014
Tonnes of ore processed per day 4,144 5,602
Gold grade (g/t) 2.08 1.99
Gold production (ounces) 48,190 61,789
Production costs per tonne $ 97 $ 70
Minesite costs per tonne $ 94 $ 70
Production costs per ounce of gold produced ($ per ounce) $ 1,503 $ 1,155
Total cash costs per ounce of gold produced ($ per ounce) $ 1,224 $ 844

 

Gold production in the first six months of 2022 decreased when compared to the prior-year period primarily due to lower throughput levels resulting from lower open pit production as production transitioned from the Sinter pit to the Reyna de Plata pit and lower underground productivity related to the higher rehabilitation requirements at the Santo Niño and Cerro Colorado zones, partially offset by higher gold grades.

 

Production costs per tonne in the first six months of 2022 increased when compared to the prior-year period primarily due to lower throughput levels, higher mining costs resulting from higher ground support requirements and higher processing costs related to higher unit prices for reagents and grinding media, partially offset by lower open pit costs.  Production costs per ounce in the first six months of 2022 increased when compared to the prior-year period due to higher production costs per tonne and the timing of the inventory, partially offset by higher gold grades.

 

Minesite costs per tonne in the first six months of 2022 increased when compared to the prior-year period primarily due to reasons described above.  Total cash costs per ounce in the first six months of 2022 increased when compared to the prior-year period due to higher minesite costs per tonne and lower by-product revenues from lower silver sales, partially offset by higher gold grades.

 

Operational Highlights

  • The Santo Niño and Cerro Colorado areas continued to require significantly more rehabilitation work than expected and resulted in lower than planned progress in underground development in the second quarter of 2022. The backlog in underground development reduced the stope availability and ore delivery to the mill, which resulted in lower than forecast gold production
  • In the second quarter of 2022, the Company reviewed the impact of the current mining conditions, adjusted the mining sequence accordingly and developed a plan to improve the mining recovery and reduce dilution. With these initiatives in place, the Company expects to return to more normalized production levels in the second half of 2022
  • At Reyna de Plata, open pit pre-stripping activities at Pit 1 and ore production from the lower section of Pit 2 progressed as expected
  • At Creston Mascota, residual recovery from the heap leach pad continued throughout the second quarter of 2022 and resulted in a production of 635 ounces of gold at production costs per ounce of $762 and total cash costs of $899 per ounce. Irrigation of the heap leach pad and residual leaching will continue throughout the third quarter of 2022

 

Project Highlights

  • Pre-production activities at the Cubiro deposit continued in the second quarter of 2022. Initial production is expected in the second half of 2023. Once production commences, Cubiro is expected to provide additional production flexibility to the Pinos Altos operations

 

Exploration

  • Exploration drilling at Pinos Altos totaled 9,900 metres during the first half of 2022.
  • A new ore shoot was discovered outside the block model in the eastern projection of the North Cubiro deposit, with hole CBUG22-175 drilled into the upper part of the ore shoot intersecting 2.2 g/t gold and 24 g/t silver over 11.0 metres at 211 metres depth, including 10.0 g/t gold and 73 g/t silver over 2.7 metres at 210 metres depth
  • In the Pinos Altos Deep project, which is targeting the depth extensions of mineralized zones at the Pinos Altos underground mining operations, highlights include: conversion hole UG22-276 in the western deep portion of the Oberon de Weber deposit that intersected 2.6 g/t gold and 58 g/t silver over 14.0 metres at 328 metres depth including 4.1 g/t gold and 70 g/t silver over 6.0 metres at 328 metres depth; and exploration hole UG22-277 in the western deepest portion of the Santo Nino deposit that intersected 1.2 g/t gold and 59 g/t silver over 9.6 metres at 589 metres depth, including 4.7 g/t gold and 200 g/t silver over 1.5 metres at 589 metres depth

 

La India – Solid Safety and Operating Performance; Potential for Additional Oxidized Mineral Resources Near Main Zone Pit Boundary

 

The 100% owned La India mine in Sonora, Mexico, located approximately 70 kilometres northwest of the Company’s Pinos Altos mine, achieved commercial production in February 2014.

 

La India Mine – Operating Statistics
Three Months Ended Three Months Ended
June 30, 2022 June 30, 2021
Tonnes of ore processed (thousands of tonnes) 1,356 1,745
Tonnes of ore processed per day 14,901 19,176
Gold grade (g/t) 0.52 0.46
Gold production (ounces) 20,016 4,712
Production costs per tonne $ 13 $ 4
Minesite costs per tonne $ 14 $ 4
Production costs per ounce of gold produced ($ per ounce) $ 872 $ 1,376
Total cash costs per ounce of gold produced ($ per ounce) $ 936 $ 1,350

 

Gold production in the second quarter of 2022 increased when compared to the prior-year period.  In the second quarter of 2022 the heap leach operated at normal levels, while in the prior-year period, irrigation of the heap leach was significantly reduced due to low local water availability.

 

Production costs per tonne in the second quarter of 2022 increased when compared to the prior-year period primarily due to inventory adjustments related to the build-up of heap leach inventory in the second quarter of 2021 and higher cement and cyanide consumption related to the high clay content of the ore.  Production costs per ounce in the second quarter of 2022 decreased when compared to the prior-year period due to higher gold production, partially offset by higher production costs per tonne.

 

Minesite costs per tonne in the second quarter of 2022 increased when compared to the prior-year period primarily due to the reasons described above.  Total cash costs per ounce in the second quarter of 2022 decreased when compared to the prior-year period due to higher gold production and higher by-product revenues from higher silver sales, partially offset by higher minesite costs per tonne.

 

La India Mine – Operating Statistics
Six Months Ended Six Months Ended
June 30, 2022 June 30, 2021
Tonnes of ore processed (thousands of tonnes) 2,919 3,387
Tonnes of ore processed per day 16,127 18,713
Gold grade (g/t) 0.55 0.45
Gold production (ounces) 41,718 21,745
Production costs per tonne $ 12 $ 7
Minesite costs per tonne $ 13 $ 7
Production costs per ounce of gold produced ($ per ounce) $ 844 $ 1,040
Total cash costs per ounce of gold produced ($ per ounce) $ 876 $ 1,026

 

Gold production in the first six months of 2022 increased when compared to the prior-year period.  In the first six months of 2022 the heap leach operated at normal levels, while in the prior-year period, irrigation of the heap leach was significantly reduced from March to June 2021 due to low local water availability.

 

Production costs per tonne in the first six months of 2022 increased when compared to the prior-year period primarily due to inventory adjustments related to the build-up of heap leach inventory in the second quarter of 2021 and higher cement and cyanide consumption related to the high clay content of the ore and higher open pit costs resulting from a higher stripping ratio at the Main Zone.  Production costs per ounce in the first six months of 2022 decreased when compared to the prior-year period due to higher gold production, partially offset by higher production costs per tonne.

 

Minesite costs per tonne in the first six months of 2022 increased when compared to the prior-year period primarily due to reasons described above.  Total cash costs per ounce in the first six months of 2022 decreased when compared to the prior-year period due to higher gold production and higher by-product revenues from higher silver sales, partially offset by higher minesite costs per tonne.

 

Operational Highlights

  • In the second quarter and first six months of 2022, the La India mine had an outstanding health and safety performance, with a zero combined accident frequency
  • In the second quarter of 2022, the quantity of ore tonnes placed on the heap leach was slightly below forecast.  At the end of the second quarter of 2022, gold production remains in line with forecast
  • The Main Zone pit is expected to be depleted in the third quarter of 2022. Ore production is then expected to transition to the La India pit and the El Realito pit

 

Project Highlights

  • Pre-stripping of the El Realito pit is approximately 81% complete. Pre-stripping activities are in line with forecast and are expected to be completed in the third quarter of 2022

 

Exploration highlights

  • Results from the exploration drilling along the west of the Main Zone pit confirmed the potential to add oxidized mineral resources near the pit boundary which could potentially extend the mine life

 

About Agnico Eagle

 

Agnico Eagle is a senior Canadian gold mining company, producing precious metals from operations in Canada, Australia, Finland and Mexico.  It has a pipeline of high-quality exploration and development projects in these countries as well as in the United States and Colombia.  Agnico Eagle is a partner of choice within the mining industry, recognized globally for its leading environmental, social and governance practices.  The Company was founded in 1957 and has consistently created value for its shareholders, declaring a cash dividend every year since 1983.

 

Posted July 28, 2022

Share this news article

MORE or "UNCATEGORIZED"


Silver Mountain Announces Closing of Prospectus Offering

Silver Mountain Resources Inc. (TSX-V: AGMR) (OTCQB: AGMRF) is ... READ MORE

April 24, 2024

Mandalay Extends the Storheden Gold Deposit Adjacent to the Operating Björkdal Mine

Mandalay Resources Corporation (TSX: MND) (OTCQB: MNDJF) announce... READ MORE

April 24, 2024

Collective Mining Intercepts 632.25 Metres at 1.10 g/t Gold Equivalent in a 200 Metre Step-Out Hole to the South at Trap

Collective Mining Ltd. (TSX: CNL) (OTCQX: CNLMF) (FSE: GG1) is pl... READ MORE

April 24, 2024

Koryx Copper Intersects 207 Meters at 0.49% and 116 Meters at 0.54% Copper Equivalent

Significant copper and molybdenum intersections include: HM19: 11... READ MORE

April 24, 2024

Red Pine Intercepts Significant Mineralization at the Wawa Gold Project, including 5.34 g/t over 13.39 metres including 16.50 g/t gold over 0.97 metre and 13.62 g/t gold over 2.13 metres