The Prospector News

G Mining Ventures Reports Fourth Quarter 2025 Operational Results

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

G Mining Ventures Reports Fourth Quarter 2025 Operational Results

 

 

 

 

 

G Mining Ventures Corp. (TSX: GMIN) (OTCQX: GMINF) is pleased to announce its preliminary production results for the fourth quarter and full year ended December 31, 2025, for the Tocantinzinho Gold Mine located in the State of Pará, Brazil.

 

During the fourth quarter, TZ produced 47,346 ounces of gold, with the mill processing 1,077 kt of ore at an average grade of 1.49 g/t Au and achieving recoveries of 91.8%.

 

For the full year, TZ produced 171,871 ounces of gold, from the processing of 4,086 kt of ore at an average grade of 1.44 g/t Au and recoveries averaging 90.6%.

 

“Tocantinzinho delivered a strong fourth quarter, successfully closing its first full year of commercial production,” commented Louis-Pierre Gignac, President & Chief Executive Officer, “Continued optimization initiatives are driving improvements in mine and plant productivity. These strong operational results were achieved alongside a solid safety performance, with only two lost time incidents, resulting in a Lost Time Injury Frequency Rate of 0.15.”

 

Fourth Quarter & Full Year 2025 Production Results Highlights

  • The average mining rate increased to 64.7 thousand tonnes per day, representing an 18% rise compared to Q3 2025 following the commissioning of additional mining equipment
  • Gold production totaled 47,346 ounces in the fourth quarter and 171,871 ounces for the full year
  • Gold sales amounted to 47,457 ounces for the fourth quarter and 172,093 ounces for the full year

 

 

Table 1. Tocantinzinho Preliminary Fourth Quarter and Full-Year 2025 Operational Results

 

TZ Production Q4 2025 FY 2025
Mining Activities      
Ore Tonnes Mined kt 1,725 6,673
Waste Tonnes Mined kt 4,230 12,407
Total Tonnes Mined kt 5,954 19,080
Strip Ratio Waste/Ore 2.45 1.86
Average Mining Rate tpd 64,720 52,272
Processing Activities      
Total Tonnes Processed kt 1,077 4,086
Average Plant Throughput tpd 11,711 11,195
Average Gold Recovery % 91.8 90.6
Average Gold Grade of Ore Processed g/t Au 1.49 1.44
Gold Produced oz 47,346 171,871
Gold Sold oz 47,457 172,093
       

 

Operational results are preliminary in nature and subject to final reconciliation. Financial and operational results for the fourth quarter and year-end 2025 will be released at the end of March, followed by a conference call hosted by senior management.

 

Qualified Person

 

Louis-Pierre Gignac, President & Chief Executive Officer of GMIN, a QP as defined in NI 43-101, has reviewed the press release on behalf of the Corporation and has approved the technical disclosure contained in this press release.

 

About G Mining Ventures Corp.

G Mining Ventures Corp. is a mining company engaged in the acquisition, exploration and development of precious metal projects to capitalize on the value uplift from successful mine development. GMIN is well-positioned to grow into the next mid-tier precious metals producer by leveraging strong access to capital and proven development expertise. GMIN is currently anchored by the Tocantinzinho Mine in Brazil, supported by the Gurupi Project in Brazil and the Oko West Project in Guyana — all with significant exploration upside and located in mining-friendly jurisdictions.

Posted January 13, 2026

Share this news article

MORE or "UNCATEGORIZED"


Forte Minerals Secures Community Access Agreement for Exploration at the Alto Ruri High Sulphidation Gold Project, Peru

Forte Minerals Corp. (CSE: CUAU) (OTCQX: FOMNF) (Frankfurt: 2OA) is pleased to announce that it has ... READ MORE

November 24, 2026

Pre-Feasibility Study for Richmond Hill Delivers Strong Economics with US$2 Billion After-Tax NPV(5%) and 71% IRR

Dakota Gold Corp. (NYSE American: DC) is pleased to report the results of its S-K 1300 Pre-Feasibili... READ MORE

November 24, 2026

Fury Intercepts 9.81 g/t Gold over 2.99 m within Seven Mineralized Zones at Eau Claire, Advancing Resource Conversion

Fury Gold Mines Limited (TSX: FURY) (NYSE American: FURY) is pleased to announce results from five ... READ MORE

November 24, 2026

CanAlaska Announces Preliminary Results from Summer Drill Program on West McArthur JV Project

CanAlaska Uranium Ltd. (TSX-V: CVV) (OTCQX: CVVUF) (FSE: DH7) is pleased to report that it has comp... READ MORE

November 24, 2026

Onyx Gold Intersects 1.6 g/t Gold Over 24.8 Meters at New SE Target, Extending Gold-Bearing Trend to Approximately 4 km

Onyx Gold Corp. (TSX-V: ONYX) (OTCQX: ONXGF) is pleased to report assay results from 36 drill holes ... READ MORE

November 24, 2026

Copyright 2026 The Prospector News