
Kodiak Copper Corp. (TSX-V: KDK) (OTCQB: KDKCF) (FSE: 5DD1) announces additional drill results from the summer 2025 drill program at its 100% owned MPD copper-gold porphyry project in southern British Columbia. The program focused on short, near-surface infill and confirmation drill holes at the West, Adit, and South Zones. Results from 10 diamond drill holes totaling 1173 metres completed at the West Zone and three diamond drill holes totaling 232 metres completed at the South Zone are presented herein.
Highlights:
Claudia Tornquist, President and CEO of Kodiak, said, “The West Zone keeps delivering attractive drill results with this year’s program confirming shallow, gold-rich mineralization and good grades seen in past drilling. This bodes well for future economics and underscores the West Zone’s important role for the full MPD mineral resource estimate expected in the fourth quarter. At the South Zone, we received encouraging results near surface from an area with very limited drilling, pointing to the potential to expand this already substantial zone. We look forward to drilling this area further.”
Figure 1: MPD Project – location map and Mineral Deposits/mineralized zones. West Zone and final South Zone results reported herein.
Figure 2: Plan map showing West Zone drilling to date. New 2025 holes at West Zone reported herein are bold traces with assays. Bar graphs show downhole copper (green) and gold (red) values for the Kodiak drilling. Background is the colour-contoured copper-in soil data.
Figure 3: West Zone – Holes AXE-25-001 to AXE-25-010 long section (looking west).
Drilling at the West Zone has intersected mineralization over an area of 650 metres by 300 metres and from surface to a depth of 960 metres. The West Zone is interpreted to be open to the south and west, as well as at depth. Copper and gold mineralization in the West Zone is hosted within diorite porphyry, andesitic volcanic rocks, and heterolithic volcaniclastic breccia. The highest grade copper intersections are associated with magnetite rich, skarn-style mineralization (locally up to 50% of the host rock) that include highly elevated gold values (see July 27, 2023 news release). The 2025 drilling corroborated historical results in the near surface and will be used to support the development of a Mineral Resource at the West Zone.
Figure 4: Plan map showing South Zone drilling to date. New 2025 holes at South Zone reported herein are bold traces with assays. Bar graphs show downhole copper (green) and gold (red) values for the Kodiak drilling. Background is the colour-contoured copper-in soil data.
Three additional holes, one of which was lost due to poor ground conditions, were drilled at the northeastern extension of the South Zone (formerly called the Mid Zone). The South Zone consists of altered and mineralized volcanic rocks and altered, coarse-grained monzonite porphyry stocks. Mineralization is predominantly copper with lesser gold and minor molybdenum. The 2025 drill holes reported herein are located to the east side of the South Zone and indicate a potential extension of the zone. Drilling in this area is limited, and further work is warranted to determine the extent of the mineralization and how it is related to the South Zone porphyry system.
Table 1: 2025 West and South Zone Weighted Assay Intervals for holes AXE-25-001 to AXE-25-013 (see Figures 2 & 3).
Hole | From (m) | To (m) | Interval** (m) | Cu % | Au g/t | Ag g/t | CuEq* |
West Zone | |||||||
AXE-25-001 | 17 | 129 | 112 | 0.17 | 0.08 | 0.66 | 0.23 |
AXE-25-002 | 30 | 123 | 93 | 0.16 | 0.17 | 0.60 | 0.27 |
Includes | 33 | 57 | 24 | 0.31 | 0.29 | 1.07 | 0.51 |
AXE-25-003 | 13 | 102 | 89 | 0.15 | 0.20 | 0.64 | 0.29 |
AXE-25-004 | 18 | 66 | 48 | 0.17 | 0.13 | 0.53 | 0.26 |
AXE-25-005 | 18 | 39 | 21 | 0.08 | 0.10 | 0.41 | 0.15 |
And | 52.5 | 63 | 10.5 | 0.12 | 0.35 | 0.85 | 0.36 |
AXE-25-006 | 3 | 141 | 138 | 0.22 | 0.11 | 0.74 | 0.29 |
Includes | 33 | 42 | 9 | 0.67 | 0.15 | 2.75 | 0.79 |
and includes | 81 | 102 | 21 | 0.41 | 0.15 | 0.90 | 0.51 |
AXE-25-007 | 9 | 84.8 | 75.8 | 0.13 | 0.21 | 0.62 | 0.27 |
AXE-25-008 | 0.3 | 60 | 59.7 | 0.24 | 0.12 | 0.79 | 0.32 |
Includes | 33 | 47 | 14 | 0.58 | 0.18 | 1.56 | 0.70 |
And | 99 | 114 | 15 | 0.11 | 0.11 | 0.70 | 0.19 |
AXE-25-009 | 9 | 21 | 12 | 0.15 | 0.10 | 0.49 | 0.22 |
And | 37.5 | 141 | 103.5 | 0.14 | 0.28 | 0.54 | 0.33 |
Includes | 84 | 91 | 7 | 0.21 | 2.11 | 1.20 | N/A |
and includes | 105 | 114 | 9 | 0.46 | 0.27 | 1.15 | 0.64 |
AXE-25-010 | 2 | 22 | 20 | 0.16 | 0.13 | 0.46 | 0.24 |
And | 44.5 | 56.5 | 12 | 0.08 | 0.03 | 0.35 | 0.10 |
And | 88 | 94 | 6 | 0.22 | 0.16 | 1.25 | 0.33 |
South Zone | |||||||
AXE-25-011 | 49.6 | 60 | 10.4 | 0.07 | 0.02 | 1.31 | 0.09 |
AXE-25-012 | 10.5 | 16.5 | 6 | 0.34 | 0.03 | 75.96 | N/A |
AXE-25-013 | 15 | 131 | 116 | 0.14 | 0.03 | 3.01 | 0.17 |
includes | 75.9 | 131 | 55.1 | 0.19 | 0.03 | 3.70 | 0.23 |
*Copper equivalent grades (%CuEq) are for comparative purposes only to express the combined abundance of copper, gold, and silver. Metallurgical recovery is assumed as 82% for copper, 60% for gold and 54% for silver as determined by Kodiak metallurgical testing as stated in the Mineral Resource Estimate (see news release June 25, 2025). Metal prices used in calculations are: US$4.20/lb copper, US$2,600/oz gold, and US$30/oz silver, using the formula: CuEq = Cu(%) + Au(g/t) x 0.6606 + Ag(g/t) x 0.0069
**Intervals are downhole drilled core intervals. Drilling data to date is insufficient to determine true width of mineralization.
Table 2: 2025 Diamond Drill Collar Information: West and South Zones
Hole ID | Easting (UTM Z10) |
Northing (UTM Z10) |
Elevation (m) |
Azimuth (degrees) | Dip (degrees) |
EOH (m) |
Reported |
AXE-25-001 | 677391 | 5502769 | 1387 | 0 | -90 | 152.5 | West |
AXE-25-002 | 677394 | 5502819 | 1391 | 270 | -65 | 123 | West |
AXE-25-003 | 677389 | 5502889 | 1398 | 0 | -90 | 102 | West |
AXE-25-004 | 677387 | 5502888 | 1398 | 270 | -50 | 93 | West |
AXE-25-005 | 677388 | 5502890 | 1398 | 90 | -55 | 103.5 | West |
AXE-25-006 | 677382 | 5502968 | 1404 | 90 | -75 | 149 | West |
AXE-25-007 | 677399 | 5503050 | 1410 | 90 | -70 | 84.8 | West |
AXE-25-008 | 677406 | 5503126 | 1414 | 270 | -65 | 120 | West |
AXE-25-009 | 677491 | 5503126 | 1416 | 210 | -60 | 147 | West |
AXE-25-010 | 677344 | 5503020 | 1402 | 0 | -90 | 98.5 | West |
AXE-25-011 | 678655 | 5502112 | 1214 | 145 | -45 | 84.2 | South |
AXE-25-012 | 678624 | 5502129 | 1218 | 210 | -45 | 16.5* | South |
AXE-25-013 | 678624 | 5502129 | 1218 | 210 | -45 | 131 | South |
* Drill hole did not reach target depth.
Sampling, Laboratory Analyses and QA/QC Procedures
All core samples are delivered to accredited laboratory Activation Laboratories Ltd. Kamloops, BC, for preparation and Fire Assay prior to being shipped to their Ancaster, Ontario Laboratory for Multi-element analysis. The samples are analyzed for gold by fire assay fusion with an AA finish. If samples return gold values over 10ppm, samples are reanalysed by fire assay with gravimetric finish. Samples then undergo four acid digestion and ICP-OES and ICP-MS analysis for 48 elements. Samples that return copper values above 10,000 ppm are further analysed using a “near-total” digestion, ICP-OES package. Actlabs meets all requirements of International Standards ISO/IEC 17025:2015 and ISO 9001:2015 for analytical procedures. In addition to Actlabs quality assurance-quality control protocols, Kodiak implements an internal QA/QC program that includes the insertion of sample blanks, duplicates, and certified reference materials, at a rate of one per ten samples.
Dave Skelton, P.Geo., Vice President Exploration and the Qualified Person as defined by National Instrument 43-101, has approved and verified the technical information used in this news release.
First Phosphate Corp. (CSE: PHOS) (OTCQB: FRSPF) (FSE: KD0) is ... READ MORE
Toogood Gold Corp. (TSX-V: TGC) announced preliminary drill core ... READ MORE
Assays on Holes 1-3 Confirm High-Grade Copper with Significant Go... READ MORE
Visible gold to the naked eye “VG-NE” heat map of all holes r... READ MORE