G2 Goldfields Inc. (TSX: GTWO) (OTCQX: GUYGF) announces new assay results from the Company’s ongoing drilling program in the greater OKO-AREMU district, Guyana. G2 currently holds exploration rights to 83,967 acres in the district and the New Oko Discovery Area represents the third significant gold discovery on the Company’s holdings. Drill results within this release are part of an ongoing program from a new discovery initially announced in March (see press releases dated March 18, April 1, April 28, June 9 and July 15, 2025, available on SEDAR+ and the Company’s website) which lies 10km north of its existing gold resources at the Oko-Ghanie Deposit (1.5 million ounces indicated at 3.40 g/t Au and 1.6 million ounces inferred at 2.48 g/t Au). Multiple gold targets are currently being explored along a prominent 15km trend extending north from the Oko-Ghanie deposit.
Highlights:
Figure 1 — Plan View of District Target Areas
Within the New Oko Discovery, G2 has completed 108 drill holes totalling 20,423m to date. This release provides assay results for forty-nine drill holes (AMD 51 to AMD 99 inclusive) and a complete set of results is available here, with highlights shown in Tables 1 and 2 below.
Figure 2 – New Oko Discovery Long Section with Wireframe of Mineralisation
Discussion of Results
Diamond drilling in the New Oko Discovery area is primarily focused on defining near surface gold mineralisation amenable to open pit mining methods. This current round of drilling has established significant gold mineralisation down plunge of previously released gold intercepts, extending gold mineralisation to vertical depths of 350m. Highlights of expansion holes are presented in Table 1.
Table 1 – Highlights of Expansion Drill Holes
DRILL HOLE |
FROM
(METRES)
TO
(METRES)
INT.
(METRES)
GRADE
(G/T AU)
GRADE x
DH WIDTH
AMD54A202.0251.049.01.363.2Incl.219.5234.515.03.044.6
AMD56274.0326.052.01.158.7Incl.278.5290.012.03.237.9
AMD58257.0303.546.51.046.7Incl.272.0284.012.02.024.4
AMD68303.5350.146.60.835.2Incl.314.0318.54.53.515.7AMD68365.0368.03.00.51.6
AMD71322.6360.037.41.347.5Incl.322.5334.511.92.327.9
AMD94218.9260.041.21.768.3Incl.226.0229.03.016.048.0
Notes to Table 1: Intercepts reported are down-hole widths. True widths are estimated between 68% and 93% of reported down-hole widths. Average grades are calculated with un-capped gold assays, as insufficient drilling has been completed to determine capping levels for higher grade intercepts.
Additionally, shallow infill drilling above 100m vertical depth has further defined high-grade gold mineralisation in upper parts of the new Oko Discovery Zone. Highlights of drill intercepts are included in Table 2.
Table 2 – Highlights of Infill Diamond Drill Holes
DRILL HOLE |
FROM
(METRES)
TO
(METRES)
INT.
(METRES)
GRADE
(G/T AU)
GRADE x
DH WIDTHAMD78117.1154.037.03.2117.7Incl.124.1127.93.826.7102.3
AMD8121.362.441.11.352.4Incl.30.039.39.33.633.2
AMD8431.590.058.51.378.8Incl.36.040.54.54.620.5And75.082.57.53.324.7AMD84106.5108.01.51.52.3
AMD8719.569.049.54.2207.6Incl.27.036.09.018.7168.4
*AMD9713.521.07.513.8103.3AMD9755.577.021.50.715.6
Notes to Table 2: Intercepts reported are down-hole widths. True widths are estimated between 68% and 93% of reported down-hole widths. Average grades are calculated with un-capped gold assays, as insufficient drilling has been completed to determine capping levels for higher grade intercepts.
* N.B. Pending additional assays for the upper contact of this zone (AMD97).
Dan Noone, G2 CEO, stated: “We are very encouraged by the ongoing progress at the project, especially the expansion of near-surface, open-pittable gold zones that will be reflected in the updated Mineral Resource Estimate scheduled for Q4 2025. In parallel, work on the Preliminary Economic Assessment is advancing well, and we remain confident that the project will develop into a very significant new gold mine for Guyana.”
Patrick Sheridan, G2 Executive Chairman, added: “The next three months will be a pivotal time for our shareholders as we deliver the initial economic parameters for a multi-open pit operation combined with a high-grade underground mine at our Oko Main Zone (776,600 oz. Au Indicated contained within 2,729,000 tonnes @ 8.85 g/t Au and 498,200 oz Au. Inferred contained within 2,938,000 tonnes @ 5.27 g/t Au). At the same time, we will continue drilling across several new promising areas.”
QA/QC
Drill core is logged and sampled in a secure core storage facility located on the OKO Project site, Guyana. Core samples from the program are cut in half, using a diamond cutting saw, and are sent to MSALABS Guyana, in Georgetown, Guyana, which is an accredited mineral analysis laboratory, for analysis. Samples from sections of core with obvious gold mineralisation are analysed for total gold using an industry-standard 500g metallic screen fire assay (MSALABS method MSC 550). All other samples are analysed for gold using standard Fire Assay-AA with atomic absorption finish (MSALABS method; FAS-121). Samples returning over 10.0 g/t gold are analysed utilizing standard fire assay gravimetric methods (MSALABS method; FAS-425). Certified gold reference standards, blanks, and field duplicates are routinely inserted into the sample stream, as part of G2 Goldfield’s quality control/quality assurance program. No QA/QC issues were noted with the results reported herein.
About G2 Goldfields Inc.
G2 Goldfields finds and develops gold deposits in Guyana. The founders and principals of the Company have been directly responsible for the discovery of more than 10 million ounces of gold in the prolific and underexplored Guiana Shield. G2 continues this legacy of exploration excellence and success.
In March 2025, G2 announced an Updated Mineral Resource Estimate for the Oko property in Guyana [see press release dated March 10, 2025]. Highlights of the Updated MRE include:
Total combined open pit and underground Resource for the Oko Main Zone (OMZ):
Total combined open pit and underground Resource for the Ghanie Zone:
Total open pit Resource for the Oko NW Zone:
The MRE was prepared by Micon International Limited with an effective date of March 1, 2025. The Oko district has been a prolific alluvial goldfield since its initial discovery in the 1870s, and modern exploration techniques continue to reveal the considerable potential of the district.
All scientific and technical information in this news release has been reviewed and approved by Dan Noone (CEO of G2 Goldfields Inc.), a “qualified person” within the meaning of National Instrument 43-101. Mr. Noone (B.Sc. Geology, MBA) is a Fellow of the Australian Institute of Geoscientists.
Additional information about the Company is available on SEDAR+ (www.sedarplus.ca) and the Company’s website (www.g2goldfields.com).
On behalf of the Board of G2 Goldfields Inc.
“Daniel Noone”
CEO & Director
For Further Information
Jacqueline Wagenaar, VP Investor Relations
Direct: +1.416.628.5904 x.1150
Email: j.wagenaar@g2goldfields.com
Galway Metals Inc. (TSX-V: GWM)(OTCQB: GAYMF) is pleased to report results from 11 diamond drill hol... READ MORE
Sitka Gold Corp. (TSX-V: SIG) (FSE: 1RF) (OTCQB: SITKF) is pleased to announce additional positive ... READ MORE
Blackrock Silver Corp. (TSX-V: BRC) (OTCQX: BKRRF) (FSE: AHZ0) is pleased to report the resul... READ MORE
Vizsla Royalties Corp. (TSX-V: VROY) (OTCQB: VROYF) is pleased to highlight the mandate let... READ MORE
Kinross Gold Corporation (TSX: K) (NYSE: KGC) announced today that it has sold an aggregate of 29,85... READ MORE