The Prospector News

Taseko Announces a 26% Increase in Annual Copper Production from its Gibraltar Mine

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Taseko Announces a 26% Increase in Annual Copper Production from its Gibraltar Mine

 

 

 

 

 

Taseko Mines Limited (TSX: TKO) (NYSE American: TGB) (LSE: TKO) is pleased to announce that the Gibraltar mine produced 34 million pounds of copper and 369 thousand pounds of molybdenum in the fourth quarter of 2023.  For the full year, Gibraltar produced 123 million pounds of copper, well above guidance and 26% higher than the previous year.

 

Copper production in the fourth quarter was supported by strong copper grades of 0.27% with ore from the lower benches of the Gibraltar pit. Mill throughput in the quarter averaged 83,000 tons per day and was impacted by additional downtime for maintenance and monitoring of the ball mill in concentrator #2.

 

Copper sales volumes in the fourth quarter were 36 million pounds, and year-end concentrate inventories remained above normal levels.

 

Stuart McDonald, President and CEO of Taseko, commented, “The strong finish to 2023 is expected to continue in 2024 as the Gibraltar pit will remain the main source of ore for the first half of this year.”

 

Note: Production and sales volumes stated in this release are on a 100% basis.

 

Posted January 10, 2024

Share this news article

MORE or "UNCATEGORIZED"


Americas Gold and Silver Reports High-Grade 149 Vein Extension Including 24,913 g/t Silver and 16.9% Copper at Galena Complex and Effective Date of Share Consolidation

Americas Gold and Silver Corporation (TSX: USA) (NYSE American: U... READ MORE

August 23, 2025

XXIX Announces Closing of $6.0 Million Financing

XXIX Metal Corp. (TSX-V: XXIX) is pleased to announce that it has... READ MORE

August 23, 2025

GRAPHITE ONE ANNOUNCES CLOSING OF C$13.3 MILLION BROKERED LIFE OFFERING

Graphite One Inc. (TSX-V: GPH) (OTCQX: GPHOF) is pleased to annou... READ MORE

August 22, 2025

Kuya Silver Reports Second Quarter 2025 Results; Continued Progress at Bethania Silver Project with Increased Mining Output, Significant Underground Development, and Encouraging Exploration Results

Kuya Silver Corporation (CSE: KUYA) (OTCQB: KUYAF) (FSE: 6MR1) is... READ MORE

August 22, 2025

Abcourt Accepts $5.8M Financing Offer from Investissement Québec

Abcourt Mines Inc. (TSX-V: ABI) (OTCQB: ABMBF) is pleased to anno... READ MORE

August 22, 2025

Copyright 2025 The Prospector News