The Prospector News

Marathon Gold Closes Flow-Through Offering

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Marathon Gold Closes Flow-Through Offering

 

 

 

 

 

Marathon Gold Corporation (TSX: MOZ) is pleased to announce the closing of its previously announced C$6.9 million non-brokered charity flow-through offering at a price of C$1.0488 per flow-through share. Marathon intends to use the proceeds of the Offering for eligible exploration expenditures at its Valentine Gold Project. Franco-Nevada Corporation acquired the common shares comprising the entire back-end of the Offering.

 

About Marathon

 

Marathon is a Toronto based gold company advancing its 100%-owned Valentine Gold Project located in the central region of Newfoundland and Labrador, one of the top mining jurisdictions in the world. The Project comprises a series of five mineralized deposits along a 32-kilometre system. A December 2022 Updated Feasibility Study outlined an open pit mining and conventional milling operation producing 195,000 ounces of gold a year for 12 years within a 14.3-year mine life. The Project was released from federal and provincial environmental assessment in 2022 and construction commenced in October 2022. The Project has estimated Proven Mineral Reserves of 1.43 Moz (23.36 Mt at 1.89 g/t) and Probable Mineral Reserves of 1.27 Moz (28.22 Mt at 1.40 g/t). Total Measured Mineral Resources (inclusive of the Mineral Reserves) comprise 2.06 Moz (29.23 Mt at 2.19 g/t) with Indicated Mineral Resources (inclusive of the Mineral Reserves) of 1.90 Moz (35.40 Mt at 1.67 g/t). Additional Inferred Mineral Resources are 1.10 Moz (20.75 Mt at 1.65 g/t Au). Please see the NI 43-101 Technical Report “Valentine Gold Project, NI 43-101 Technical Report and Feasibility Study” effective November 30, 2022, Marathon’s Annual Information Form for the year ended December 31, 2022 and other filings made with Canadian securities regulatory authorities available at www.sedar.com for further details and assumptions relating to the Valentine Gold Project.

 

Posted July 11, 2023

Share this news article

MORE or "UNCATEGORIZED"


Pirate Gold Intersects 30.6 g/t Au over 1.35m and 4.25 g/t Au over 6.65m at Moosehead; Identifies New Gold Structure

Eastern Trend shallow drilling continues to deliver high-grade as... READ MORE

August 28, 2026

Brixton Metals Announces Closing Of Final Tranche Of Private Placement For Aggregate Gross Proceeds Of $9.1 Million

Brixton Metals Corporation (TSX-V: BBB) (OTCQX: BBBXF) is please... READ MORE

August 28, 2026

Cygnus Metals Limited: Drilling Results Update

Chibougamau Copper-Gold Project, Canada   HIGHLIGHTS: Results fr... READ MORE

August 28, 2026

Purepoint Uranium Group Inc. Closes Private Placement

Purepoint Uranium Group Inc. (TSX-V: PTU) (OTCQB: PTUUF) announce... READ MORE

August 28, 2026

Mogotes Metals Closes US$15 Million Strategic Investment by Rio Tinto and Formation of Strategic & Technical Alliance

Mogotes Metals Inc. (TSX-V: MOG) (FSE: OY4) (OTCQB: MOGMF) is ple... READ MORE

August 28, 2026

Copyright 2026 The Prospector News