The Prospector News

Prospector News Podcast – “Bactech Environmental Moves Rapidly Towards Two Distinct Goals”

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Prospector News Podcast – “Bactech Environmental Moves Rapidly Towards Two Distinct Goals”

 

 

 

 

 

Prospector News Publisher Michael Fox Talks to the President and CEO of Bactech Environmental about their Bioleaching Projects in Sudbury and Ecuador.

 

It’s early days in Sudbury, but the company has secured funding to prove its preliminary patent process to separate Nickel, cobalt and iron from Pyrrhotite Concentrate. Once proven the company hope to move the project forward to a test plant to prove its commercialization

 

In Ecuador the company has secured it’s permitting for the Bioleaching plant (gold/copper) being built there. In recent weeks it has signed several agreements with local artisanal miners to provide mineral stock to the plant for processing. The project remains on time for commissioning in early 2023.

 

BacTech | BacTech (bactechgreen.com)

Posted July 19, 2022

Share this news article

MORE or "UNCATEGORIZED"


Newcore Gold Closes $15 Million Bought Deal Financing

Newcore Gold Ltd. (TSX-V: NCAU) (OTCQX: NCAUF) is pleased to anno... READ MORE

May 28, 2026

Group Eleven Drills 11.8m of 13.4% Zn+Pb (3.3% Zn and 10.1% Pb) and 45 g/t Ag in 80m Step-Out; and Confirms Deeper Cu-Ag Mineralization in 720m Step-Out

Group Eleven Resources Corp. (TSX-V: ZNG) (OTCQB: GRLVF) (FSE: 3G... READ MORE

May 28, 2026

Miata Expands District-Scale Gold System at Sela Creek, Suriname, Including 11 m at 3.35 g/t Au within 25.1 m at 1.71 g/t Au at Jons Trend

Miata Metals Corp. (TSX-V: MMET) (FSE: 8NQ) (OTCQX: MMETF) is ple... READ MORE

May 28, 2026

GFG Discovers District-Scale Gold System at Nahanni with High-Grade Intercepts up to 11.20 g/t Au in First-Pass Drilling

GFG Resources Inc. (TSX-V: GFG) (OTCQB: GFGSF) is pleased to repo... READ MORE

May 28, 2026

Paramount Gold Announces Results of Feasibility Study for the Grassy Mountain Gold Project

After-Tax NPV of $375M and IRR of 39% ($3,600/oz gold)   After-T... READ MORE

May 28, 2026

Copyright 2026 The Prospector News