The Prospector News

TomaGold intersects 1.83 g/t Au over 52.3 m, including 125 g/t Au over 0.5 m at a depth of 350 m at Obalski

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

TomaGold intersects 1.83 g/t Au over 52.3 m, including 125 g/t Au over 0.5 m at a depth of 350 m at Obalski

 

 

 

 

 

The Corporation continues to intersect significant gold mineralization at depth

 

 

TOMAGOLD CORPORATION (TSX-V: LOT) (OTCQB: TOGOF)  is pleased to report the last results of its 11,500-metre drilling program on its wholly-owned Obalski property in Chibougamau, Quebec. In this latest phase, the Corporation drilled five holes for a total of 2,409 m.

 

Table 1: Best drilling results

 

Hole Zone Section From
(m)
To
(m)
Length
(m)*
Au
(g/t)
Ag
(g/t)
Cu
(%)
Depth
(m)
OBS-22-016 A-Po 300+00 E 258.35 283.50 25.15 0.31 0.58 0.06 200
OBS-22-017 C 300+00 E 193.20 194.00 0.80 3.83 8.30 0.42 165
  A-Po   297.95 314.90 16.95 0.33 0.09 0.03 260
  A-Po   343.90 353.25 9.35 6.07 3.29 0.08 295
Including     349.90 350.80 0.90 60.60 31.80 0.60  
OBS-22-018 C 300+00 E 306.85 310.45 3.60 0.43 0.63 0.02 285
OBS-22-019 A-Po 175+00 E 374.70 427.00 52.30 1.83 0.73 0.04 350
Including     423.80 424.30 0.50 125.00 45.80 3.30  

* True width is estimated at 65-70% of core length.

 

“This program was a true success as it allowed us to expand the mineralization at depth on Obalski with significant gold intersections, further demonstrating the mineral potential of our property,” said David Grondin, President and CEO of TomaGold. “The upcoming program slated for June will be even more exciting as we will continue to test the extensions of the mineralization, in addition to drilling anomalies detected to the west of the property following the results of the induced polarization survey.”

 

Table 2: Results of the 2021-22 drilling program on Obalski

 

Hole Zone Section Length
(m)*
Au
(g/t)
Ag
(g/t)
Cu
(%)
Depth
(m)
OBS-21-001 C 450+00 E 0.65 12.45 17.70 0.53 93
  A-Po   0.55 1.93 1.80 234
OBS-21-002 C 450+00 E 1.10 1.38 1.39 100
  A   0.50 67.10 40.10 2.32 205
  D   0.90 2.59 3.10 236
  A-Po   1.10 47.40 87.60 7.06 298
OBS-21-003 A-Po 450+00 E 11.95 0.51 1.84 0.12 276
Including     1.30 1.58 4.80 0.19  
Including     1.10 1.20 4.20 0.53  
  A-Po   0.50 6.35 1.90 376
  A-Po   7.10 0.26 2.13 419
OBS-21-004 A-Po
OBS-21-005 A-Po 120+00 E 4.05 3.01 3.35 200
OBS-21-005A A-Po 120+00 E 49.25 0.21 0.19 0.04 374
OBS-21-006 A-Po 120+00 E 1.90 0.24 0.68 250
OBS-21-007 A-Po 120+00 E 20.75 0.43 0.29 385
OBS-21-008 A-Po 150+00 E 12.55 0.85 1.40 0.11 185
Including A-Po   2.10 3.40 4.73 0.65  
OBS-21-009 A-Po 150+00 E 28.50 1.41 0.81 200
Including A-Po   1.50 6.84 1.50  
Including A-Po   4.50 4.03 2.87  
OBS-21-010 A-Po 150+00 E 45.95 0.32 0.35 425
OBS-21-010A A-Po 150+00 E 54.80 0.33 0.20 425
Including A-Po   3.50 1.44 0.80  
OBS-21-011 A-Po 200+00 E 0.50 1.60 2.60 210
OBS-21-012 A-Po 200+00 E 27.50 0.39 0.83 300
OBS-21-013 A-Po 200+00 E 1.40 0.76 2.10 0.14 450
OBS-21-014 A-Po 250+00 E 8.90 0.62 0.12 210
OBS-21-014A A-Po 250+00 E 7.70 0.89 0.32 230
OBS-21-015 A-Po 250+00 E 3.20 23.78 16.55 1.00 330
Including A-Po   0.45 167.50 112.00 6.08  
OBS-21-015A A-Po 250+00 E 10.50 5.06 3.27 360
Including A-Po   0.65 71.00 31.40  
OBS-22-016 A-Po 300+00 E 25.15 0.31 0.58 0.06 200
OBS-22-017 C 300+00 E 0.80 3.83 8.30 0.42 165
  A-Po   16.95 0.33 0.09 0.03 260
  A-Po   9.35 6.07 3.29 0.08 295
Including     0.90 60.60 31.80 0.60  
OBS-22-018 C 300+00 E 3.60 0.43 0.63 0.02 285
OBS-22-019 A-Po 175+00 E 52.30 1.83 0.73 0.04 350
Including     0.50 125.00 45.80 3.30  

* True width is estimated at 65-70% of core length.

 

Sample preparation and analysis

TomaGold has implemented and is adhering to a strict Quality Assurance/Quality Control program for the current drilling program. The core is sawed in half, with one half kept as a witness sample in Chibougamau and the other half shipped directly by bus to ALS Chemex in Val-d’Or, Quebec. ALS grinds the half core to 1/8″, split it into two halves and keeps one half as a witness (reject) in Val-d’Or. ALS pulverizes the other half to minus 150 mesh, takes a 50 g sample for analysis and keeps the rest, identified as “pulp”.

 

The technical content of this press release has been reviewed and approved by André Jean, P.Eng., the Corporation’s Director of Exploration and a qualified person under National Instrument 43-101.

 

About the Obalski property

The Obalski property covers 345 hectares about 2 km south of Chibougamau, Quebec. Discovered in 1928, the Obalski deposit produced 100,273 tonnes at grades of 1.14% Cu, 2.08 g/t Au and 6.04 g/t Ag from the A zone between 1964 to 1972, and around 9,000 tonnes at a reported grade of 8.5 g/t Au from the D zone in 1984 (Source: SIGEOM and Camchib Exploration internal reports).

 

About TomaGold

TomaGold Corporation is a Canadian mineral exploration corporation engaged in the acquisition, assessment, exploration and development of gold mineral properties. TomaGold has interests in five gold properties near the Chibougamau mining camp in northern Quebec: Obalski, Monster Lake East, Monster Lake West, Hazeur and Lac Doda. It also participates in a joint venture with Evolution Mining Ltd. and New Gold Inc., through which it holds a 24.5% interest in the Baird property, near the Red Lake mining camp in Ontario.

 

Posted April 14, 2022

Share this news article

MORE or "UNCATEGORIZED"


South Pacific Metals Extends the Mineralized Structures at Megabe to More than 300 Metres of Confirmed Strike Length; Structures Open Along Strike and at Depth

Step-out drilling places SPMC on the upper margin of a potential ... READ MORE

August 24, 2026

North Arrow Extends Target AE Strike Length to 1000 m and Completes Rotation 3 Regional RC Drilling, Kraaipan Gold Project, Botswana

New surface targets identified North Arrow Minerals Inc. (... READ MORE

August 24, 2026

USA Rare Earth Announces Completion of Upsized $1.55 Billion Capitalization of the U.S. Government-Backed Special Purpose Vehicle for Serra Verde Offtake

U.S. Department of War (DoW) provides a $750 million investment i... READ MORE

August 24, 2026

Lavras Gold Intersects High-Grade Gold at Caneleira, Supporting Near-Surface Continuity of the Vein System

Hole 26CN044 returns 24.30 g/t gold over a drilled width of 9 met... READ MORE

August 24, 2026

Ivanhoe Electric Receives Preliminary Project Letter from the Export-Import Bank of the United States for $1.1 Billion in Potential Debt Financing for the Santa Cruz Copper Project

Letter Provides Increased Potential Debt Financing from $825 Mill... READ MORE

August 24, 2026

Copyright 2026 The Prospector News