The Prospector News

Zinc One Closes Final Tranche of Non-Brokered Private Placement

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Zinc One Closes Final Tranche of Non-Brokered Private Placement

 

 

 

 

 

Zinc One Resources Inc. (TSX-V: Z) (OTC Pink: ZZZOF) (FSE: RH33) announces that it has closed the second and final tranche of its previously announced non-brokered private placement announced on May 2, 2018.

 

 

The Company has issued a further 6,532,216 units at a price of C$0.24 per unit, for gross proceeds of C$1,567,732. Together with the first tranche, the Financing was oversubscribed with a total of 22,595,502 units issued for gross proceeds of C$5,422,921. The first tranche was closed on May 22, 2018 (see Company’s news release of same date).

 

 

Each Unit is comprised of one common share of the Company and one-half of one transferable common share purchase warrant. Each Warrant will entitle the holder to purchase one additional common share of the Company at $0.35 per share for a period of three years from the date of issue.

 

 

All securities issued related to the final tranche of the Financing are subject to a four-month statutory hold period expiring October 26, 2018. Zinc One also paid in connection to the Financing, a total of C$4,293 in finders’ fees and issued a total of 17,889 Warrants to finders.

 

 

Proceeds of the Financing are being used for exploration activities on the Bongará Zinc Mine Project in Peru, satisfying the debt legacy associated with the acquisition of Forrester Metals Inc. and working capital purposes.

 

 

About Zinc One Resources Inc.

 

 

Zinc One is focused on the exploration and development of prospective and advanced zinc projects in mining-friendly jurisdictions. The Company’s key assets are the Bongará Zinc Mine Project and the Charlotte Bongará Zinc Project in north-central Peru. The Bongará Zinc Mine Project was in production from 2007 to 2008, but was closed due to the global financial crisis and concurrent decrease in the zinc price. Past production included 20% zinc grades and recoveries over 90% from surface and near-surface zinc-oxide mineralization. High-grade, zinc-oxide mineralization is known to outcrop between the mined area and the Charlotte Bongará Project, which is nearly six kilometres to the NNW and where past drilling intercepted various near-surface zones with high-grade zinc. Zinc One is managed by a proven team of geologists and engineers who have previously constructed and operated successful mining operations.

 

Posted June 25, 2018

Share this news article

MORE or "UNCATEGORIZED"


Koryx Copper Intersects 338.61 Meters At 0.38% Cu Eq Including 230.61 Meters At 0.45% Cu Eq and Multiple 2 Meters Intersections Over 1.00% Cu Eq

Significant copper and molybdenum intersections include: HM09: 13... READ MORE

May 15, 2024

Aya Gold & Silver Reports Q1-2024 Results; Maintains Guidance; Zgounder Expansion on Track

Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) is pleased t... READ MORE

May 15, 2024

Silver Mountain Delivers Positive Preliminary Economic Assessment For Its Reliquias Project, Peru; Pre-Tax NPV 5% Of C$107 million, Pre-Tax IRR Of 57%, And Payback Of 1.8 Years

Key Highlights – Preliminary Economic Assessment Pre-Tax Net Pr... READ MORE

May 15, 2024

ARIS MINING REPORTS Q1 2024 RESULTS WITH SEGOVIA GENERATING $13.8 MILLION IN OPERATING CASH FLOW

Aris Mining Corporation (TSX: ARIS) (NYSE-A: ARMN) announces its ... READ MORE

May 15, 2024

Orla Mining Reports First Quarter 2024 Results

Orla Mining Ltd. (TSX: OLA) (NYSE: ORLA) announces the results fo... READ MORE

May 15, 2024

Copyright 2024 The Prospector News