Sitka Drills 218.6 Metres of 1.25 g/t Gold, Including 44.4 Metres of 3.86 g/t Gold, and a Second Interval of 92.7 Metres of 1.14 g/t Gold in a Single Hole at Its RC Gold Project, Yukon

          Drilling continues to demonstrate that gold mineralization extends well beyond the current Blackjack deposit, with hole 129 expanding mineralization 150 m east of the resource and hole 132 confirming broad higher-grade mineralization at depth below …

Zentek Announces New PEA for Albany Graphite: US$3.85 Billion After-Tax NPV at a 5% Discount Rate, 27.4% After-Tax IRR, on an Acid-Free Route to 99.9992% Purity Graphite

          Initial capital of US$817 million, after-tax payback of 4.4 years and a 30-year mine life, for the nuclear, defence and allied-nation supply chains the Project targets.   Zentek Ltd. (TSX-V: ZEN) (NASDAQ: ZTEK) reported the results of …

Largo Starts Production of Copper and Platinum Group Metals as By-Products of Vanadium Operations Following Mining Agency Approval

          Key Highlights: Approval of Brazil’s National Mining Agency allows Largo to produce and sell copper concentrates with platinum group metals from its Maracás Menchen mine in addition to vanadium, titanium and iron. Industrial-scale flotation tests …

STLLR Gold Intersects 12.46 g/t Au over 16.17 m and 18.62 g/t Au over 5.30 m at the Jonpol Deposit of the Tower Gold Project and Provides Exploration Plans for the Remainder of 2026

          STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D) reports final assay results at the Jonpol Deposit at the Garrison Property and exploration plans at the Tower Gold Project in the Timmins Mining Camp in …

White Gold Corp. Announces Positive Preliminary Economic Assessment with C$1.9 Billion After-Tax NPV, 38% IRR and 1.7 Year Payback Period on the White Gold Project, Yukon, Canada

          Maiden PEA outlines a 9.4 year, 12,000 tonne per day open pit operation producing an average of 188,000 ounces of gold per year (223,000 ounces per year over the first five years) at a US$3,600/oz …

Maple Gold Reports Final Joutel Winter Drill Results, Including 8.6 g/t Gold over 4.2 Metres Within 2.5 g/t Gold over 18.3 Metres in the Eagle Mine Area, and Launches Expanded, Fully Funded 25,000 Metre Fall Drill Campaign

          Highlights High-grade gold mineralization at Joutel has been extended up to 450 metres beyond the Eagle-Telbel mine workings; system remains open along strike and at depth. New drill hole intercepts, located between the Eagle and …