The Prospector News

XIMEN MINING UPDATE ON PERMIT STATUS AT KENVILLE GOLD MINE

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

XIMEN MINING UPDATE ON PERMIT STATUS AT KENVILLE GOLD MINE

 

 

 

 

 

SOON TO BE ONE OF THE GREENEST GOLD MINES

NELSON, BC

 

 

Ximen Mining Corp. (TSX-V: XIM) (FRA: 1XMA) (OTCQB: XXMMF) announces that in a recent call with our liaison officer from Major Mines of BC on December 8TH 2022, senior management from Ximen discussed the need to update shareholders regarding the current status of the Kenville Gold Mine permit, which has now been a nearly four-year process. The parties agreed that the following was an acceptable update for release.

The Company is expecting two permits, one from the Ministry of Energy, Mines and Low-Carbon Innovation, and one from the Ministry of Environment.

The Draft Permit from Mines is now complete and will be provided any day. The Mines department is finalizing specifics related to the permit area and the amount of the reclamation bond to be required. The Company expects that the area will be directly related to its 100-year-old owned Crown Grants that cover both surface and underground rights, as well as additional rights related to these Crown Grants. (Definition of a Crown Grant is specifically different than Mineral Titles – See image Below). The reclamation bond has been previously discussed in detail and the Company does not expect anything out of the ordinary course of business.

The draft Permit from Environment has been prepared with all conditions and inter-department reviews completed and recommendations to address the Company’s activities. This is expected to be forwarded to the Company any day.

The permits from Mines and Environment will come with conditions. There will be a brief review period and if acceptable Ximen will sign off in agreement and the Final Permit to commence work will be issued.

If there are any questions or comments, please feel free to reach out to our office and we will be happy to respond. The Company has continuously engaged with the community and provided tours and site visits to all interested parties. This has been a cumbersome process, but it is our objective to preserve this site as it has been for the last 100 years and create many impactful, meaningful and well-paying jobs for the region, as well maintain a small environmental footprint, aiming to be one of the greenest gold producers in BC and a leader in our industry. The power to the site is hooked up and tied in to the energy from the Kootenay Dam as well.  All drilling will be contained in the underground development using pneumatic drills. The compressors and lines are all installed, powered up and ready to be deployed.

 

We understand it’s been a long wait and the last couple of years have been challenging for all. We appreciate your continued support and patience and want to assure everyone that all departments, Mines, Environment and the Ximen Team have been working diligently to finalize this process in the best interest of all parties concerned.

“We are all part of a diverse natural community here in the Kootenays and its important that we all do the best we can as custodians to preserve the beauty and nature that is in our trust, while providing opportunities for our families and the community as a whole.”, states Anderson CEO

New Portal
Small Environmental Footprint

 

Technical disclosure in this news release has been approved by Dr. Mathew Ball, P.Geo., a Qualified Person as defined by National Instrument 43-101 and VP Exploration for Ximen Mining Corp.

The Company also announces it has granted 1,000,000 Restricted Share Units to its directors, officers, employees and consultants. The RSUs are payable in common shares of the Company. The RSUs are not transferable and will be subject to a four-month hold period from the date of grant and any applicable regulatory acceptance

Posted December 16, 2022

Share this news article

MORE or "UNCATEGORIZED"


NEVADA KING INTERCEPTS 2.44 G/T AU OVER 90.0M AND 3.17 G/T AU OVER 60.1M AT PIT BOTTOM, AS WELL AS 4.97 G/T AU & 163 G/T AG OVER 27.4M AT ATLANTA

Nevada King Gold Corp. (TSX-V: NKG) (OTCQB: NKGFF)  is pleased t... READ MORE

March 13, 2025

Goliath Resources Updated Modelling Confirms Its Large Gold Rich Layered System Is Directly Associated To Motherlode Intrusive Source (RIRG) And Multiple Gold Rich Feeder Dykes That Assayed Up To 12 g/t AuEq Over 10 Meters That Remain Open For Expansion, Surebet Discovery, Golden Triangle, B.C.

Dyke Highlights: 17 feeder dykes have been intersected in drill h... READ MORE

March 13, 2025

NGEx Drills 51.50m at 4.37% Cu and 10.42 g/t Au (12.26% CuEq), including 21.50m at 8.71% Cu and 23.81 g/t Au (26.68% CuEq), and 27.40m at 7.80% Cu and 23.17 g/t Au (25.19% CuEq) at Lunahuasi

NGEx Minerals Ltd. (TSX: NGEX) (OTCQX: NGXXF) is pleased to prov... READ MORE

March 13, 2025

Fortuna intersects 7.2 g/t Au over 31.5 meters at Kingfisher, Séguéla Mine, Côte d’Ivoire

Fortuna Mining Corp. (NYSE: FSM) (TSX: FVI) is pleased to provide... READ MORE

March 13, 2025

ARIS MINING REPORTS RECORD Q4 2024 FINANCIAL RESULTS WITH STRONG EBITDA GROWTH AND ANNOUNCES 25% CAPACITY EXPANSION AT MARMATO

Aris Mining Corporation (TSX: ARIS) (NYSE-A: ARMN) announces its... READ MORE

March 13, 2025

Copyright 2025 The Prospector News