The Prospector News

Viva Gold Announces High-Grade Drill Results at its Tonopah Project Including 1.5 Meters at 138 grams/ton Gold

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Viva Gold Announces High-Grade Drill Results at its Tonopah Project Including 1.5 Meters at 138 grams/ton Gold

 

 

 

 

 

Viva Gold Corp. (TSX-V:VAU) (OTCBB:VAUCF) is pleased to announce initial assay results from the recently completed 11hole Reverse Circulation drill program at its Tonopah Gold Project.

 

 

Drill Result Highlights

 

 

TG1808 – 1.5 meters at 138 grams per tonne and 1.5 meters at 8.9 g/t within a zone of 9.1 meters containing an average uncapped grade of 25.4 g/t or a capped grade of 5.8 g/t using a 20 g/t ton grade cap. A second zone of 4.6 meters at 5.5 g/t was intercepted that included, 1.5 meters at 14.9 g/t. TG1808 terminated in a 0.6 g/t intercept indicating potential for further depth extent. Average grade for all intercepts over a length of 70.1 meters using a 0.25 g/t cutoff grade totaled 3.9 g/t uncapped or 1.4 g/t capped.  

 

 

TG1807 – 9.1 meters @  4.5 g/t  within a zone grading 2.0 g/t over 39.6 meters. Hole was terminated in a 0.4 g/t intercept. Average grade for all intercepts over 83.8 meters of 1.0 g/t using a 0.25 g/t cutoff grade.

 

 

TG 1808 was drilled in the south end of the Dauntless zone and produced grades and intercepts that significantly exceed modelled expectations for this location. The hole was extended 20 meters below target depth with good results ending in strong mineralization further demonstrating potential for additional mineralization at depth. TG 1807 was drilled at the intersection of the Discovery and Dauntless zones and confirmed modelled results for this area. TG 1806 was designed to target the southern extension of the Discovery fault. This hole did not achieve target depth due to drilling difficulties, but the hole was completed in strong grade also indicating the potential for additional mineralization at depth. TG 1805 was targeted to intercept the southern extension to the Discovery zone, but intercepted limited mineralization above cutoff grade.  

 

 

“These initial results provide solid confirmation of the high grade nature of the Tonopah project and further validation for the database of historical information acquired with the project. This work confirms our geologic model which encompasses high-grade vein systems associated with a series of extensional fault zones overprinting a lower-grade zone of blanket type mineralization. The long runs of grade and numerous zones of mineralization intercepted at relatively shallow depths also supports the open pit potential of this project. The holes all terminated in grade, further demonstrating additional depth potential for the system. We believe that our project goal of over 1.0 million contained ounces of gold resource for this project is achievable,” states James Hesketh, President & CEO.

 

 

Tonopah Project
Initial Drill Results for 2018 RC Drill Program

 

 

    Depth   Uncapped Capped*
Hole   From To Length Gold Grade Gold Grade
    Meter Meter Meter Gram/Tonne Gram/Tonne
             
             
TG 1808   54.9 57.9 3.0 0.5 0.5
             
and   64.0 73.2 9.1 25.4 5.8
  including 65.5 67.1 1.5 138.0 20.0
  including 70.1 71.6 1.5 8.9 8.9
             
and   83.8 89.9 6.1 0.4 0.4
             
And   97.5 102.1 4.6 5.5 5.5
  Including 99.1 100.6 1.5 14.9 14.9
             
And   108.2 120.4 12.2 1.2 1.2
And            
And TD 123.4 125.0 1.5 0.6 0.6
             
All zones   54.9 125.0 70.1 3.9 1.4
             
TG 1807   10.7 19.8 9.1 0.3 0.3
And   35.1 74.7 39.6 2.0 2.0
  Including 59.4 68.6 9.1 4.5 4.5
And   80.8 83.8 3.0 0.4 0.4
And TD 93.0 94.5 1.5 0.4 0.4
             
All zones   10.7 94.5 83.8 1.0 1.0
             
TG 1806   21.3 29.0 7.6 0.3 0.3
And TD 71.6 74.7 3.0 0.7 0.7
             
TG 1805   38.1 39.6 1.5 0.5 0.5
             
 

* Capped at 20 grams/tonne

       
0.25 gram/tonne used throughout      

 

 

An additional seven drill holes have been completed in this drilling program. These holes were targeted to demonstrate extensions to known structures or were targeted to infill between known zones of mineralization. The Company expects assay results for these additional holes in early August. As announced on April 26th, 2018 Viva Gold plans to drill 28 holes in total for the project, the latter half and second phase of 17 holes should commence later this year.

 

 

The Tonopah property contains a near-surface low-sulfidation epithermal gold system which includes near vertical quartz-adularia-gold veins hosted by the Palmetto Formation argillite and the overlying Tertiary rhyolitic volcanics within a low-angle zone of mineralization which includes and often parallels an erosion surface discontinuity at the top of the Palmetto. Mineralization has been identified in a series of north-striking extensional structural zones within an overall mineralized trend along the north-northwest Walker Lane trend, covering an area over 2,000 meters long and 300 meters wide.
       

 

All technical information which is included in this statement has been reviewed and approved by Thomas C. Matthews of Gustavson Associates LLC. Mr. Matthews is independent of the Company and a qualified person, pursuant to the meaning of such terms in National Instrument 43-101 Standards of Disclosure for Mineral Projects. The basis for the high-grade cap of 20 g/t and 0.25 g/t cutoff grade utilized for this release are based on technical analysis documented in the March 27, 2018 NI43-101 Technical Report on Mineral Resources, Tonopah Project, Nye County, Nevada. 

 

 

Viva Gold is a gold exploration and development company with a focus on Nevada.

 

Posted July 9, 2018

Share this news article

MORE or "UNCATEGORIZED"


Silver Mountain Announces Closing of Prospectus Offering

Silver Mountain Resources Inc. (TSX-V: AGMR) (OTCQB: AGMRF) is ... READ MORE

April 24, 2024

Mandalay Extends the Storheden Gold Deposit Adjacent to the Operating Björkdal Mine

Mandalay Resources Corporation (TSX: MND) (OTCQB: MNDJF) announce... READ MORE

April 24, 2024

Collective Mining Intercepts 632.25 Metres at 1.10 g/t Gold Equivalent in a 200 Metre Step-Out Hole to the South at Trap

Collective Mining Ltd. (TSX: CNL) (OTCQX: CNLMF) (FSE: GG1) is pl... READ MORE

April 24, 2024

Koryx Copper Intersects 207 Meters at 0.49% and 116 Meters at 0.54% Copper Equivalent

Significant copper and molybdenum intersections include: HM19: 11... READ MORE

April 24, 2024

Red Pine Intercepts Significant Mineralization at the Wawa Gold Project, including 5.34 g/t over 13.39 metres including 16.50 g/t gold over 0.97 metre and 13.62 g/t gold over 2.13 metres

Red Pine Exploration Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased ... READ MORE

April 24, 2024

Copyright 2024 The Prospector News