Victoria Gold: 2022 Fourth Quarter & Full Year Results

 

 

 

 

 

Victoria Gold Corp. (TSX:VGCX) is pleased to announce its fourth quarter and year ended December 31, 2022 summary financial and operating results. The Company uses certain non-IFRS performance measures throughout this news release. Please refer to the “Non-IFRS Performance Measures” section of this new release for more information. All currency figures are in Canadian $ unless otherwise indicated.

 

All amounts are in Canadian dollars unless otherwise indicated. This release should be read in conjunction with the Company’s Financial Statements and Management’s Discussion and Analysis for the years ended December 31, 2022 and 2021, available on the Company’s website or on SEDAR.

 

2022 Highlights  
Gold produced 150,182 ounces
Average gold price realized C$ 2,306
Revenue (000s) C$ 321,843
Gross Profit (000s) C$ 87,732
Net Income (000s) C$ 35,040
Earnings per share – Basic C$ 0.55
EBITDA (000s) C$ 140,454
   

 

“With 2022 gold production of over 150,000 ounces combined with robust gold prices, the Eagle Mine generated significant positive gross profit, net income and EBITDA,” noted Mr. John McConnell, President and CEO. “However, gold production was negatively impacted by a number of challenges which reduced availability of the crushing and conveying circuit. This resulted in gold production missing our expectations and unit costs higher than anticipated. We have significantly improved our operational and maintenance staffing and protocols and will implement further strategies to continue the improvement program throughout 2023. This is expected to result in material production increases during 2023 which is anticipated to lead to higher margins, earnings and cash flows.”

 

Operational highlights – Fourth Quarter and Year Ended 2022

  • Mine production was 1.6 million tonnes of ore in the quarter. Mine production for the year was 7.1 million tonnes of ore.
  • Ore stacked on the heap leach facility in the quarter was 1.4 million tonnes at an average grade of 0.90 grams per tonne. Ore stacked for the year was 6.6 million tonnes at an average grade of 0.85 g/t.
  • Gold production was 43,741 ounces in the quarter. Gold production for the year was 150,182 oz.

 

 

Financial highlights – Fourth Quarter and Year Ended 2022

  • Gold sold in the quarter was 40,573 oz, at an average realized price1 of $2,278 (US$1,678) per oz. Gold sold for the year was 139,596 oz, at an average realized price1 of $2,306 (US$1,772) per oz.
  • Recognized revenue was $92.3 million based on sales of 40,573 oz of gold in the quarter. Recognized revenue was $321.8 million based on sales of 139,596 oz of gold for the year.
  • Operating earnings were $23.2 million in the quarter. Operating earnings were $79.1 million for the year.
  • Net income was $10.5 million, or $0.16 per share on a basic basis and $0.16 per share on a diluted basis for the quarter. Net income was $35.0 million, or $0.55 per share on a basic basis and $0.54 per share on a diluted basis for the year.
  • Cash costs1 were $1,249 (US$920) per oz and all-in sustaining costs (“AISC“)1 were $1,868 (US$1,376) per oz of gold sold in the quarter. Cash costs1 were $1,191 (US$916) per oz and AISC1 of $1,875 (US$1,441) per oz of gold sold for the year.
  • EBITDA1 were $35.2 million in the quarter. EBITDAwere $140.5 million for the year.
  • Free cash flowdeficiency was $9.2 million, or $0.14 per sharein the quarter. Free cash flow1 deficiency was $53.5 million, or a deficiency of $0.83 per sharefor the year.
  • Cash and cash equivalents were $20.6 million at December 31, 2022 after net draw of $2.8 million against the Company’s debt facilities for the year.

 

Fourth Quarter and Year to Date 2022 Operating Results

 

    Three months ended Years ended
    December 31,
2022
December 31,
2021
December 31,
2022
December 31,
2021
Operating data          
Ore mined t 1,552,756 2,515,702 7,108,091 9,488,128
Waste mined t 2,916,476 3,200,397 10,408,166 15,028,269
Total mined t 4,469,232 5,716,099 17,516,257 24,516,397
Strip ratio w:o 1.88 1.27 1.46 1.58
Mining rate tpd 48,579 62,132 47,990 67,168
Ore stacked on pad t 1,363,841 2,539,309 6,619,872 9,157,313
Ore stacked grade g/t Au 0.90 0.83 0.85 0.85
Throughput (stacked) tpd 14,824 27,601 18,137 25,089
Gold produced oz 43,741 49,496 150,182 164,222
Gold sold oz 40,573 49,219 139,596 158,736

Notes –     Strip ratio: waste to ore (“w:o”)
                  Mining rate: tonnes per day (“tpd”)

 

Results vs. Revised 2022 Guidance

 

The Company issued original 2022 Guidance for the Eagle Gold Mine on March 24, 2022, which consisted of a gold production target of 165,000-190,000 ounces and AISC1 range of US$1,225-$1,425 per ounce. On October 4, 2022, as a result of a major failure of the overland conveyor belt which curtailed crushing, conveying and ore stacking on the heap leach pad for approximately 18 days, the Company retracted its 2022 production and cost guidance. Actual 2022 gold production was 150,182 ozs while AISC were US1,441 per oz of gold sold for the year.

 

Gold production and sales

During the three months ended December 31, 2022, the Eagle Gold Mine produced 43,741 ounces of gold, compared to the 49,496 ounces of gold production in Q4 2021. During the year ended December 31, 2022, the Eagle Gold Mine produced 150,182 ounces of gold, compared to the 164,222 ounces of gold production for the prior year comparable period. Fourth quarter and full year 2022 production results were below expectations. Mechanical availability of the crushing and conveying circuit was lower than anticipated. The most significant reason for the lower mechanical availability was the failure of the belt on the overland conveyor late in Q3 2022 resulting in approximately 18 days of downtime and lower quarter-over-quarter and year-over-year gold production.

 

During the three months ended December 31, 2022, the Company sold 40,573 ounces of gold, compared to the 49,219 gold ounces sold in Q4 2021. During the year ended December 31, 2022, the Company sold 139,596 ounces of gold, compared to the 158,736 gold ounces sold in the prior year comparable period. Fourth quarter and full year 2022 gold sales results were below expectations due to the reasons mentioned in the production discussion above.

 

Mining

During the three months ended December 31, 2022, a total of 1.6 million tonnes of ore was mined, at a strip ratio of 1.88:1 with a total of 4.5 million tonnes of material mined. In comparison, a total of 2.5 million tonnes of ore was mined, at a strip ratio of 1.27:1 with a total of 5.7 million tonnes of material mined for the prior comparable period in 2021.

 

Total tonnes mined were 22% lower during the three months ended December 31, 2022. Ore tonnes mined were 39% lower due to lower ore stacking in the period, which is discussed in further detail in the Processing section herein. Waste tonnes mined were 9% lower year-over-year as stripping requirements did not necessitate additional material to be mined.

 

During the year ended December 31, 2022, a total of 7.1 million tonnes of ore were mined, at a strip ratio of 1.46:1 with a total of 17.5 million tonnes of material mined. In comparison, a total of 9.5 million tonnes of ore were mined, at a strip ratio of 1.58:1 with a total of 24.5 million tonnes of material mined for the prior comparable period in 2021.

 

Total tonnes mined were 29% lower during the year ended December 31, 2022 compared with the same period in 2021. Ore tonnes mined were 26% lower year-over-year, primarily due to foregoing stacking run of mine material during the year. ROM material was either stockpiled or wasted in 2022 rather than stacked on the HLF.

 

Waste tonnes mined were 31% lower year over year. As per the Eagle mine plan, waste dump sequencing required longer waste haul distances to establish lower lifts of the Eagle Pup waste rock storage area to conform with geotechnical criteria established for the WRSA design. These lifts are now largely complete and average waste haul distances in 2023 are significantly shorter which is expected to translate in to higher waste mining rates going forward.

 

Processing

During the three months ended December 31, 2022, a total of 1.4 million tonnes of ore was stacked on the HLF. A total of 2.5 million tonnes of ore was stacked on the HLF for the prior comparable period in 2021.

 

Ore stacked on the HLF decreased by 46% for the three months ended December 31, 2022 largely due to the belt splice failure of the overland conveyor (see Company News Release data October 4, 2022) and not stacking ROM on the HLF as noted above. Production was impacted for approximately 18 days while the belt was replaced. In addition to the belt splice, there was a sustained period of extreme cold temperatures (sub -50 oC) in December. Crushing and conveying operations were curtailed for approximately six days during this period. While cold weather interruptions are anticipated, the temperatures experienced in December 2022 were more extreme than normal.

 

Ore stacked for the quarter had an average grade of 0.90 g/t Au, compared to 0.83 g/t Au in the prior comparable period in 2021.

 

During the year ended December 31, 2022, a total of 6.6 million tonnes of ore was stacked on the HLF. A total of 9.2 million tonnes of ore was stacked on the HLF for the prior comparable period in 2021.

 

Ore stacked on the pad decreased by 28% for the year ended December 31, 2022 compared with the same period in 2021. The primary reason for the reduced tonnes in 2022 was foregoing ROM hauling to the HLF. As previously noted in the 2022 Q3 MD&A, the decision was made to not stack ROM material due to higher unit costs and lower gold recovery. Crushed tonnes decreased by 7% year-over-year as a result of the challenges experienced in the fourth quarter highlighted above.

 

Ore stacked for the year ended December 31, 2022 had an average grade of 0.85 g/t Au, compared to 0.85 g/t Au in the prior comparable period in 2021.

 

As at December 31, 2022, the Company estimates there are 102,175 recoverable oz within mineral inventory.

 

Capital

The Company incurred a total of $25.0 million in capital expenditures during the three months ended December 31, 2022:

  1. sustaining capital of $11.0 million, including:
    1. construction of the water treatment facility of $3.5 million,
    2. scheduled capital component rebuilds on mobile mining fleet of $3.2 million,
    3. upgrades and capital component rebuilds on the material handling system of $2.2 million, and
    4. other ongoing sustaining capital initiatives of $2.1 million;
  2. capitalized stripping activities of $15.0 million;
  3. $6.1 million spend on growth capital expenditures (growth exploration and mine expansion); and net of
  4. $7.1 million reduction to the Company’s asset retirement obligation during the quarter.

 

The Company incurred a total of $113.0 million in capital expenditures during the year ended December 31, 2022:

  1. sustaining capital of $60.1 million including:
    1. construction of the water treatment facility of $16.9 million,
    2. scheduled capital component rebuilds on mobile mining fleet of $15.3 million,
    3. new conveyor along with upgrades and capital component rebuilds on material handling system of $10.3 million,
    4. expansion to the heap leach pad of $6.6 million,
    5. final construction on the truck shop of $1.7 million, and
    6. other ongoing sustaining capital initiatives of $9.3 million;
  2. capitalized stripping activities of $32.5 million;
  3. $26.4 million spend on growth capital expenditures (growth exploration and mine expansion); and net of
  4. $6.0 million reduction to the Company’s asset retirement obligation during the year ended December 31, 2022.

 

Fourth Quarter and Full Year 2022 Financial Results

 

Expressed in 000s, except per share amounts   Three months ended Years ended
  December 31, 2022 December 31, 2021 December 31, 2022 December 31, 2021
Financial data          
Revenue $ 92,310 110,647 321,843 356,454
Gross profit $ 22,872 49,788 87,732 150,974
Net income $ 10,464 45,661 35,040 110,368
Earnings per share – Basic $ 0.16 0.73 0.55 1.77
Earnings per share – Diluted $ 0.16 0.69 0.54 1.68

 

Expressed in 000s, except per share amounts   As at
December 31, 2022
As at
December 31, 2021
Financial position      
Cash and cash equivalents $ 20,572 31,251
Working capital $ 94,687 62,808
Property, plant and equipment $ 670,813 626,400
Total assets $ 1,016,806 891,386
Long-term debt $ 184,512 151,251
       

 

Revenue

For the fourth quarter, the Company recognized revenue of $92.3 million compared to $110.6 million for the previous year’s comparable period. The decrease in revenue is attributed to a lower average realized price and a lower number of gold oz sold, partially offset by higher C$/US$ exchange rate. Revenue is net of treatment and refining charges, which were $0.3 million for the three months ended December 31, 2022. The Company sold 40,573 ounces of gold at an average realized price1 of $2,278 (US$1,678), compared to 49,219 oz at an average realized price1 of $2,251 (US$1,786), in the fourth quarter of 2021.

 

For the year ended December 31, 2022, the Company recognized revenue of $321.8 million compared to $356.5 million for the previous year’s comparable period. The decrease in revenue is attributed to a lower average realized price and lower number of gold oz sold, partially offset by higher C$/US$ exchange rate. Revenue is net of treatment and refining charges, which were $0.9 million for the year ended December 31, 2022. The Company sold 139,596 oz of gold at an average realized1 price of $2,306 (US$1,772), compared to 158,736 oz at an average realized1 price of $2,243 (US$1,790) for the year ended December 31, 2021.

 

Cost of goods sold

Cost of goods sold was $50.6 million for the three months ended December 31, 2022 compared to $44.5 million for the previous year’s comparable period. The increase in cost of goods sold year-over-year is attributed to increased costs due to inflation and change in inventory.

 

Cost of goods sold was $166.4 million for the year ended December 31, 2022 compared to $145.5 million for the previous year’s comparable period. The increase in cost of goods sold is attributed to inflation and the change in inventory.

 

Depreciation and depletion

Depreciation and depletion was $18.8 million for the three months ended December 31, 2022 compared to $16.3 million for the previous year’s comparable period.

 

Depreciation and depletion was $67.7 million for the year ended December 31, 2022 compared to $60.0 million for the previous year’s comparable period.

 

Assets are depreciated on a straight-line basis over their useful life, or depleted on a units-of-production basis over the reserves to which they relate.

 

Liquidity and Capital Resources

At December 31, 2022, the Company had cash and cash equivalents of $20.6 million (December 31, 2021 – $31.3 million) and a working capital surplus of $94.7 million (December 31, 2021 – $62.8 million surplus). The decrease in cash and cash equivalents of $10.7 million over the year ended December 31, 2021, was due to operating activities ($84.3 million increase in cash) primarily from operating cash flow before working capital adjustments and financing activities ($31.3 million increase in cash) from shares issued for cash and draws made on credit facilities and long-term debt offset by investing activities ($126.3 million decrease in cash) primarily from capital expenditures incurred at the Eagle Gold Mine.

 

2023 Outlook

Victoria’s operational outlook assumes that operations will continue without any significant COVID-19 related interruptions. The Company has taken precautions to mitigate the risk of COVID-19 on operations. However, the COVID-19 pandemic and any future emergence and spread of similar pathogens could have a material adverse impact on our business, operations and operating results, financial condition, liquidity and market for our securities.

 

Production at the Eagle Gold Mine for 2023 is estimated to be between 160,000 and 180,000 ounces.

 

The seasonality experienced in 2021 and 2022, where gold production was lower in the first half of the year compared to the last half of the year, is expected to be reduced in 2023. Seasonality is expected to diminish compared to previous years as the gold ounces in inventory, primarily on the heap leach pad, is higher at the end of 2022 and regularly scheduled maintenance periods, which were previously weighted to the first quarter, are expected to be reduced and spread over the year.

 

AISC1 for 2023 are expected to be between US$1,350 and US$1,550 per oz of gold sold.

 

Sustaining capital, not including waste stripping, is estimated at C$30 million (US$23 million) for 2023. Sustaining capital during 2023 is expected to be materially lower than previous years due to the absence of major one-time infrastructure construction (water treatment plant in 2022 and truck shop in 2021). Major items included in 2023 sustaining capital include mobile equipment rebuilds and fixed maintenance rebuilds.

 

Capitalized waste stripping is estimated at C$50 million (US$38 million) and is included in AISC1 but is not included in the sustaining capital above. Waste stripping will be expensed or capitalized based on the actual quarterly stripping ratio versus the expected life of mine stripping ratio and may be quite variable quarter-over-quarter and year-over-year. Waste stripping in 2023 is expected to be materially higher than the life of mine average annual waste stripping. This accounting treatment for waste stripping will affect earnings and capital but will not affect AISC1 or cash flow.

 

Growth capital related to Eagle Gold Mine expansion initiatives is estimated at C$15 million (US$11 million) for 2023 and includes heap leach pad expansion. In addition, growth exploration spending in 2023 is estimated to be C$10 million (US$8 million).

 

Qualified Person

The technical content of this news release has been reviewed and approved by Paul D. Gray, P.Geo, as the “Qualified Person” as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

 

About the Dublin Gulch Property

Victoria Gold’s 100%-owned Dublin Gulch gold property (the “Property”) is situated in central Yukon Territory, Canada, approximately 375 kilometers north of the capital city of Whitehorse, and approximately 85 kilometers from the town of Mayo. The Property is accessible by road year round, and is located within Yukon Energy’s electrical grid.

 

The Property covers an area of approximately 555 square kilometers, and is the site of the Company’s Eagle and Olive Gold Deposits. The Company issued a National Instrument 43-101 Technical Report for the Eagle Gold Mine dated December 3, 2019 (the “2019 Eagle Technical Report”). Since the date of the 2019 Eagle Technical Report, the Company has produced gold from its Eagle Mine. Based on the 2019 Eagle Technical Report and after adjusting for depletion through December 31, 2022, the Eagle and Olive deposits include Proven and Probable Reserves of 2.5 million ounces of gold from 125 million tonnes of ore with a grade of 0.63 grams of gold per tonne. Based on the 2019 Eagle Technical Report and after adjusting for depletion through December 31, 2023, the Mineral Resource for the Eagle and Olive deposits has been estimated to host 209 million tonnes averaging 0.62 grams of gold per tonne, containing 4.0 million ounces of gold in the “Measured and Indicated” category, inclusive of Proven and Probable Reserves, and a further 28 million tonnes averaging 0.61 grams of gold per tonne, containing 0.6 million ounces of gold in the “Inferred” category.

 

Posted February 25, 2023

Share this news article

MORE or "UNCATEGORIZED"


Red Pine Discovers Significant Gold Mineralization in Faulted Extension of the Jubilee Shear on the Wawa Gold Project

Red Pine Exploration Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased ... READ MORE

October 31, 2024

F3 Announces Closing of Private Placement for Aggregate Gross Proceeds of C$8 Million

F3 Uranium Corp. (TSX-V: FUU) (OTC Pink: FUUFF) is pleased to ann... READ MORE

October 31, 2024

Collective Mining Announces Closing of Concurrent Financings for Gross Proceeds of C$46.35 Million

Collective Mining Ltd. (NYSE: CNL) (TSX: CNL) is pleased to ann... READ MORE

October 31, 2024

ARIS MINING ANNOUNCES CLOSING OF US$450 MILLION SENIOR NOTES OFFERING TO FUND REDEMPTION OF OUTSTANDING 6.875% SENIOR NOTES

Aris Mining Corporation  (TSX: ARIS) (NYSE-A: ARMN) announces t... READ MORE

October 31, 2024

Rare Element Resources Receives Final Approval Required to Commence Operations of Rare Earth Demonstration Plant in Wyoming

Staffing in place and operations shakedown underway Rare E... READ MORE

October 31, 2024

Copyright 2024 The Prospector News