The Prospector News

Tocvan Drills 47.3 meters of 0.75 g/t Au from Surface in Step-out South of the Main Zone Also Drills 7.6 meters of 1.7 g/t Au and 7 g/t Ag at New 4-Trench Extension Target

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Tocvan Drills 47.3 meters of 0.75 g/t Au from Surface in Step-out South of the Main Zone Also Drills 7.6 meters of 1.7 g/t Au and 7 g/t Ag at New 4-Trench Extension Target

 

 

 

 

 

Tocvan Ventures Corp. (CSE: TOC) is pleased to announce results for the next six drill holes from its Phase II drill program at the Pilar Gold-Silver Project in Sonora, Mexico. A Phase II drill program has concluded with over 3,500 meters of reverse circulation drilling in twenty drill holes. Results for six drill holes are included in this release, highlighted by drill hole JES-21-47 which returned 47.3 meters at 0.75 g/t Au and 5 g/t Ag (0.80 g/t AuEq). Seven drill holes from new target areas are pending assay results.

 

 

 

Drill Result Highlights

 

JES-21-47 (Figure 1)

  • 3 meters at 0.75 g/t Au and 5 g/t Ag (0.80 g/t AuEq) from surface to 47.3 meters
    • Including 2 meters at 1.1 g/t Au and 12 g/t Ag from surface to 12.2 meters
    • Also8 meters at 1.06 g/t Au and 4 g/t Ag from 27.5 to 47.3 meters
    • Including 1 meters at 5.6 g/t Au and 22 g/t Ag from 44.2 to 47.3 meters

 

NEW 4-Trench Extension Target

JES-21-44

  • 2 meters at 0.41 g/t Au and 4 g/t Ag (0.45 g/t AuEq) from 10.7 to 54.9 meters
    • Including 7.6 meters at 1.7 g/t Au and 7 g/t Ag from 47.3 to 54.9 meters

 

 

“JES-21-47 is another significant step-out to our Main Zone, expanding the potential further southeast along trend”, commented VP Exploration, Brodie Sutherland. “With each hole we learn a little more about how this system behaves, giving us more confidence to test our new target areas at Pilar. In addition, we are starting to see results for the 4-Trench Extension target and we are excited to have intersected 7.6m at 1.7 g/t Au, in one of our first holes in that area. With the conclusion of our Phase II drill program, we look forward to releasing the remaining results once available and begin planning for the next phase of program development.”

 

 

Results Discussion

 

 

JES-21-44 – The hole was planned to test the 4-Trench Extension target. Drilling intersected a broad low-grade zone from 10.7 to 54.9m of 0.41 g/t Au, including a higher grade section at depth of 7.6m of 1.7g/t Au and 7 g/t Ag (see Table 1). Historic results from drill hole N-12 intersected 4.5m of 1.42 g/t Au, 40m to the east of JES-21-44 suggesting mineralization is widening to the northwest along this trend.

 

 

JES-21-47 – The hole was planned to test southeast along the Main Zone Trend 100m from drill hole JES-20-32. The hole also tested 60m up-dip of historic hole JES-18-03, which intersected 13.5m of 5.6 g/t Au and 22 g/t Ag. A broad zone was intersected from surface to 47.3m of 0.75 g/t Au and 5 g/t Ag with higher grade intervals up to 3.1m of 5.6 g/t Au and 22 g/t Ag.

 

Figure 1. Cross-Section of Drill Hole JES-21-47

 


Figure 2. Planview Map of Phase II Drill Program Update.

 

 Table 1. Summary of Drill Results

 

 *Insufficient drilling has been undertaken to determine true widths. All widths reported are core length. Gold equivalent (“AuEq”) is calculated using metal prices of $1,700/oz gold and $18/oz silver.

  

About the Pilar Property

 

The Pilar Gold-Silver property is interpreted as a structurally controlled low-sulphidation epithermal project hosted in andesite rocks. Three zones of mineralization have been identified in the north-west part of the property from historic surface work and drilling and are referred to as the Main Zone, North Hill and 4-Trench. Structural features and zones of mineralization within the structures follow an overall NW-SE trend of mineralization. Over 19,200 m of drilling have been completed to date. Significant results are highlighted below:

 

  • 2020 Phase I RC Drilling Highlights include (all lengths are drilled thicknesses):
    • 6m @ 1.6 g/t Au, including 9.2m @ 10.8 g/t Au and 38 g/t Ag;
    • 2m @ 1.1 g/t Au, including 3.1m @ 6.0g/t Au and 12 g/t Ag ;
    • 4m @ 2.5 g/t Au and 73 g/t Ag, including 1.5m @ 33.4 g/t Au and 1,090 g/t Ag
  • 17,700m of Historic Core & RC drilling. Highlights include:
    • 61.0m @ 0.8 g/t Au
  • 5m @ 53.5g/t Au and 53 g/t Ag
  • 0m @ 9.6 g/t Au
  • 0m @ 10.2 g/t Au and 46 g/t Ag

 

Soil and Rock sampling results from undrilled areas indicate mineralization extends towards the southeast from the Main Zone and 4-Trench Zone. Recent Surface exploration has defined three new target areas: Triple Vein Zone, SE Vein Zone and 4 Trench Extension.

 

 

Brodie A. Sutherland, P.Geo., VP Exploration for Tocvan Ventures Corp. and a qualified person  as defined by Canadian National Instrument 43-101, has reviewed and approved the technical information contained in this release.

 

 

Quality Assurance / Quality Control

 

 

RC chips were shipped for sample preparation to ALS Limited in Hermosillo, Sonora, Mexico and for analysis at the ALS laboratory in North Vancouver. The ALS Hermosillo and North Vancouver facilities are ISO 9001 and ISO/IEC 17025 certified. Gold was analyzed using 50-gram nominal weight fire assay with atomic absorption spectroscopy finish. Over limits for gold (>10 g/t), were analyzed using fire assay with a gravimetric finish. Silver and other elements were analyzed using a four-acid digestion with an ICP finish. Over limit analyses for silver (>100 g/t) were re-assayed using an ore-grade four-acid digestion with ICP-AES finish. Control samples comprising certified reference samples and blank samples were systematically inserted into the sample stream and analyzed as part of the Company’s robust quality assurance / quality control protocol.

 

 

About Tocvan Ventures Corp.

 

 

Tocvan is a well-structured exploration development company. Tocvan was created in order to take advantage of the prolonged downturn the junior mining exploration sector, by identifying and negotiating interest in opportunities where management feels they can build upon previous success. Tocvan currently has approximately 28 million shares outstanding and is earning into two exciting opportunities. The Pilar Gold-Silver project in Sonora, Mexico and the Rogers Creek Copper project in southern British Columbia, management feels both projects represent tremendous opportunity to create shareholder value.

 

 

 

Posted July 8, 2021

Share this news article

MORE or "UNCATEGORIZED"


Evergold Announces Closing of $1,242,000 Private Placement to Support First-Ever Drilling of High Potential DEM Porphyry Copper-Gold-Silver Prospect, BC

Evergold Corp. (TSX-V: EVER) (WKN: A2PTHZ) is pleased to announc... READ MORE

September 30, 2023

Lavras Gold closes upsized private placement

Lavras Gold Corp. (TSX-V: LGC) (OTCQB: LGCFF) has raised gross pr... READ MORE

September 30, 2023

First Phosphate Receives Letter of Interest in the Amount of up to US$170 Million from the Export-Import Bank of the United States (EXIM)

First Phosphate Corp. (CSE: PHOS) (OTC Pink: FRSPF) (FSE: KD0) is... READ MORE

September 30, 2023

New Pacific Metals Closes C$35 Million Bought Deal Financing

New Pacific Metals Corp. (TSX: NUAG) (NYSE American: NEWP) announ... READ MORE

September 30, 2023

Laramide intercepts broad-based uranium mineralization in initial holes from 2023 Australian exploration program

Laramide Resources Ltd. (TSX: LAM) (ASX: LAM) (OTCQX: LMRXF) is p... READ MORE

September 30, 2023

Copyright 2023 The Prospector News