The Prospector News

Titan Mining On Track to Become the Only Fully Integrated U.S. Graphite Producer by Q4 2025

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Titan Mining On Track to Become the Only Fully Integrated U.S. Graphite Producer by Q4 2025

 

 

 

 

 

Titan Mining Corporation (TSX: TI; OTCQB: TIMCF) is pleased to provide an update on the construction of its graphite processing facility for its Kilbourne Graphite Project at Empire State Mines LLC, its wholly owned subsidiary located in St. Lawrence County, New York.

 

Highlights:

  • First Fully Integrated U.S. Graphite Producer in 70+ Years: Titan on track to deliver domestically sourced and processed natural graphite in Q4 2025.
  • Major Construction Milestone Achieved: Over 50% of major equipment delivered; installation starting August 2025, commissioning targeted for Q4 2025.
  • North American Supply Chain Focus: Over 90% of equipment sourced in North America, majority from the United States, supporting domestic manufacturing.
  • Permitted and Ready for Operations: All key operating permits secured; sales qualification targeted for Q1 2026.
  • Tariff-Free, Secure U.S. Supply: Titan offers a reliable, tariff-free graphite source amidst rising global trade restrictions and tariffs on imports.
  • Strategic Advantage with Existing Infrastructure: Utilizes the Company’s skilled 135+ person workforce, on-site power, and logistics network to fast-track readiness.
  • Clear Pathway to Growth: The Kilbourne Graphite Project offers significant scalability, positioning Titan to be able to meet a majority of projected U.S. graphite demand in key sectors.

 

The recent arrival and placement of the ball mill—shown in the image below—marks another significant milestone in advancing toward operational readiness.

 

Don Taylor, CEO of Titan commented: “Graphite is a critical material, yet the U.S. has gone decades without domestic production. The current resource outlined at Kilbourne represents only 8,300 ft of strike length tested of a known total strike length of 25,000 ft. Kilbourne has significant resource expansion potential to meet the demands of U.S. natural flake graphite over a long-term period. Our facility is a major step toward restoring U.S. industrial graphite capability and delivering a fully Made in America natural graphite product in 2025.”

 

Rita Adiani, President of Titan commented: “With escalating tariffs on imports and tightening trade restrictions globally, Titan is uniquely positioned to offer secure, tariff-free, U.S.-produced graphite to industrial markets. By investing in U.S.-sourced equipment, leveraging existing infrastructure, and maintaining a skilled domestic workforce, Titan provides customers with a reliable alternative amidst growing supply chain uncertainty.”

 

 

About Titan Mining Corporation

 

Titan is an Augusta Group company which produces zinc concentrate at its 100%-owned Empire State Mine located in New York state. Titan is also an emerging natural flake graphite producer and targeting to be the USA’s first end to end producer of natural flake graphite in 70 years. Titan’s goal is to deliver shareholder value through operational excellence, development and exploration. We have a strong commitment towards developing critical minerals assets which enhance the security of the domestic supply chain.

 

Posted July 21, 2025

Share this news article

MORE or "UNCATEGORIZED"


SAGA Metals Drills 485.4 m at 32.21% Fe2O3, 5.30% TiO2, 0.191% V2O5 Including 56.8 m at 49.56% Fe2O3, 8.17% TiO2, 0.339% V2O5 at Radar Critical Minerals Project in Labrador

SAGA Metals Corp. (TSX-V: SAGA) (OTCQX: SAGMF) (FSE: 20H), a North American exploration company foc... READ MORE

September 23, 2026

Fredonia Announces Closing of C$11.5M Bought Deal Private Placement Including Full Exercise of Underwriters’ Option

Fredonia Mining Inc. (TSX-V: FRED) is pleased to announce that it has closed its previously announce... READ MORE

September 23, 2026

Legacy in New Core Hole Hits 3.7 g/t Gold over 41ft (12.5m) near Surface, Incl. 15.1 g/t over 6.7ft (2.05m), plus 4 Mineralized Zones Incl. 0.62 g/t over 127ft (38.8m) at Baner, Idaho

Legacy Gold Mines Ltd. (TSX-V: LEGY) is pleased to report assay results from core holes LG26-017 an... READ MORE

September 23, 2026

Inventus Expands Shallow High-Grade Main Layer and Identifies Broad Bulk-Tonnage Gold Potential at Pardo

Inventus Mining Corp. (TSX-V: IVS) is pleased to report results from 100 drill holes from its now-... READ MORE

September 23, 2026

Sleeping Giant Mine Activity Report

Abcourt Mines Inc. (TSX-V: ABI) (OTCQB: ABMBF) is pleased to present its operational report for the ... READ MORE

September 23, 2026

Copyright 2026 The Prospector News