The Prospector News

TASEKO MINES ANNOUNCES THIRD QUARTER COPPER PRODUCTION OF 35 MILLION POUNDS FROM THE GIBRALTAR MINE

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

TASEKO MINES ANNOUNCES THIRD QUARTER COPPER PRODUCTION OF 35 MILLION POUNDS FROM THE GIBRALTAR MINE

 

 

 

 

 

Taseko Mines Limited (TSX: TKO) (NYSE American: TGB) (LSE: TKO) is pleased to announce that the Gibraltar Mine produced 35 million pounds of copper and 369 thousand pounds of molybdenum in the third quarter (100% basis).

 

Stuart McDonald, President and CEO of Taseko, commented, “The 25% quarter-over-quarter increase in copper production was a result of higher grades, improved recoveries and increased mill throughput. Mining in the Gibraltar pit is progressing on plan and the lower benches are providing the ore quality we expected. Molybdenum grades have also increased as mining has progressed deeper into the Gibraltar pit, resulting in a 60% increase in quarterly molybdenum production.”

 

A port workers strike in early July caused shipping delays and a build-up of Gibraltar copper concentrate inventory. As a result, third quarter sales volumes lagged production by three million pounds, and the excess inventory is expected to be shipped and sold in the fourth quarter.

 

Taseko is providing this third quarter production update in advance of an analyst and investor tour taking place at the Gibraltar Mine later today.

 

Presentation slides to be used during the tour will be available at

https://tasekomines.com/investors/presentations.

 

Posted October 4, 2023

Share this news article

MORE or "UNCATEGORIZED"


Brixton Metals Reports Record Silver Intercepts of 18.2m of 3,638 g/t Ag Including 6.8m of 9,421 g/t Ag at its Langis Project in Ontario

Brixton Metals Corporation (TSX-V: BBB) (OTCQB: BBBXF) is pleased... READ MORE

March 18, 2026

Altamira Gold Intersects High Grade Gold Mineralization in the First Drill Hole at the Guillermo Target and Extends Maria Bonita Mineralization at Depth, Cajueiro District, Brazil

Altamira Gold Corp.’s (TSX-V: ALTA) (FSE: T6UP) (OTCQB: EQTRF)Â... READ MORE

March 18, 2026

Newcore Gold Announces Updated Mineral Resource Estimate for the Enchi Gold Project, Ghana

1,502,000 Indicated and 626,000 Inferred Gold Ounces; Expanded In... READ MORE

March 18, 2026

Eco Oro Completes Second Tranche of US$4.5 Million Financing

Eco Oro Minerals Corp. (CSE: EOM) announces it has completed the ... READ MORE

March 18, 2026

Terra Balcanica Intercepts 607 g/t Ag Eq. Over 3.0 m and 670 g/t Ag Eq. Over 3.9 m At Cumavici in Bosnia and Herzegovina

Terra Balcanica Resources Corp. (CSE:TERA) (FRA:UB1) (OTC:TEBAF) ... READ MORE

March 18, 2026

Copyright 2026 The Prospector News