The Prospector News

Taseko Announces a 26% Increase in Annual Copper Production from its Gibraltar Mine

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Taseko Announces a 26% Increase in Annual Copper Production from its Gibraltar Mine

 

 

 

 

 

Taseko Mines Limited (TSX: TKO) (NYSE American: TGB) (LSE: TKO) is pleased to announce that the Gibraltar mine produced 34 million pounds of copper and 369 thousand pounds of molybdenum in the fourth quarter of 2023.  For the full year, Gibraltar produced 123 million pounds of copper, well above guidance and 26% higher than the previous year.

 

Copper production in the fourth quarter was supported by strong copper grades of 0.27% with ore from the lower benches of the Gibraltar pit. Mill throughput in the quarter averaged 83,000 tons per day and was impacted by additional downtime for maintenance and monitoring of the ball mill in concentrator #2.

 

Copper sales volumes in the fourth quarter were 36 million pounds, and year-end concentrate inventories remained above normal levels.

 

Stuart McDonald, President and CEO of Taseko, commented, “The strong finish to 2023 is expected to continue in 2024 as the Gibraltar pit will remain the main source of ore for the first half of this year.”

 

Note: Production and sales volumes stated in this release are on a 100% basis.

 

Posted January 10, 2024

Share this news article

MORE or "UNCATEGORIZED"


Ucore Secures Additional US$4.6 Million from U.S. Department of War to Advance Samarium and Gadolinium Refining

Expanded RapidSX™ program supports critical defense supply... READ MORE

September 14, 2026

Thunder Gold Reports 404.5 Metres of Continuous Gold Mineralization Averaging 0.453 g/t Au in Extension of TM23-137

Thunder Gold Corp. (TSX-V: TGOL) (FSE: Z25) (OTCQB: TGOLF) is ple... READ MORE

September 14, 2026

Getty Drills 46m of 1.47% Copper Within 150m of 0.71% Copper in Step-Out Intercepts at Getty South

Highlights: Getty South step-out drilling intersects shallow, thi... READ MORE

September 14, 2026

Osisko Gold Announces Formal Construction Decision and Development Update for the Cariboo Gold Project

HIGHLIGHTS Positive formal construction decision on the Cariboo G... READ MORE

September 14, 2026

OUTCROP SILVER ANNOUNCES UPDATED MINERAL RESOURCE ESTIMATE FOR THE SANTA ANA PRIMARY SILVER PROJECT

Indicated Resources Contain 29.9 Moz AgEq1 at 519 g/t AgEq and I... READ MORE

September 14, 2026

Copyright 2026 The Prospector News