
Taseko Mines Limited (TSX: TKO) (NYSE American: TGB) (LSE: TKO) is pleased to announce that the Gibraltar mine produced 34 million pounds of copper and 369 thousand pounds of molybdenum in the fourth quarter of 2023. For the full year, Gibraltar produced 123 million pounds of copper, well above guidance and 26% higher than the previous year.
Copper production in the fourth quarter was supported by strong copper grades of 0.27% with ore from the lower benches of the Gibraltar pit. Mill throughput in the quarter averaged 83,000 tons per day and was impacted by additional downtime for maintenance and monitoring of the ball mill in concentrator #2.
Copper sales volumes in the fourth quarter were 36 million pounds, and year-end concentrate inventories remained above normal levels.
Stuart McDonald, President and CEO of Taseko, commented, “The strong finish to 2023 is expected to continue in 2024 as the Gibraltar pit will remain the main source of ore for the first half of this year.”
Note: Production and sales volumes stated in this release are on a 100% basis.
Agnico Eagle Mines Limited (NYSE: AEM) (TSX: AEM) announced today that it sold 38,002,589 common s... READ MORE
Gladiator Metals Corp. (TSX-V: GLAD) (OTCQB: GDTRF) (FSE: ZX7) is pleased to announce that it has c... READ MORE
Vizsla Copper Corp. (TSX-V: VCU) (OTCQB: VCUFF) (FRANKFURT: 97E0) is pleased to announce results fr... READ MORE
SIRIOS RESOURCES INC. (TSX-V: SOI) announces that the Government of Québec, through the Société ... READ MORE
Bravada Gold Corporation (TSX-V: BVA) (FSE: BRTN) reports an updated, independent In-pit Resour... READ MORE