The Prospector News

Talisker Acquires Congress Property Further Extending the Bralorne Gold Project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Talisker Acquires Congress Property Further Extending the Bralorne Gold Project

 

 

 

 

 

Talisker Resources Ltd. (CSE:TSK) (OTCQB:TSKFF) is pleased to announce that the Company has entered into an agreement with Discovery Metals Corp. to acquire a 100% interest in the Congress Property located contiguous to the Company’s Bralorne Gold Project in southwestern British Columbia. 

 

The Congress Property is located directly north of the historic Bralorne-Pioneer mine and consists of 20 mineral claims, three mining leases and eight crown grants totaling 2,675.50 hectares.  The property contains a historic indicated and inferred resource of 192,638 tonnes grading at 9.24 g/t for 57,234 oz (Mine Development Assessment Process – Congress Project Stage 1 Report, September 1988) defined by underground sampling and surface and underground drilling.  As the report was prepared prior to NI 43-101 standards for disclosure, Talisker does not know the relationship of the historic resource categories. Talisker has no knowledge of the reliability of the historic resource.  Additional drilling and sampling and quality control will be required to verify and upgrade the historical estimate. Talisker’s qualified person has not done sufficient work to classify the historical estimate as a current mineral resource and the Company is not treating the historical estimate as a current mineral resource.

 

Several highly prospective exploration targets are present on the ground including the Lou zone with historic drilling intersecting zones ranging from 1.4 to 4 meters with grades between 5 and 11 g/t Au.  Eight separate vein zones have been identified away from the Congress and Lou zones. The Company notes that a qualified person has not verified the data disclosed in respect of the property, including sampling, analytical and test data underlying this information. The data comes from historic reports prepared by previous owners. The acquisition is subject to the approval of the Canadian Securities Exchange.

 

Under the terms of the purchase agreement, Talisker will issue 1,000,000 common shares to Discovery Metals Corp. in return for 100% ownership of the Congress Property.  The common shares are subject to a four month hold period pursuant to applicable securities laws and further subject to certain resale restrictions for up to one year.

 

Terry Harbort, President & CEO of Talisker commented, “With the acquisition of the Congress Property and the previously announced acquisitions of the Royalle Claims and Naikun Crown Grants, the Bralorne Gold Project now comprises 7,791 hectares over 51 mineral claims, three mining leases and 181 Crown grants.  Talisker will be aggressively exploring to unlock the mineral potential along the entire 33 kilometres trend now 100% controlled by the Company.”

 

About Talisker Resources Ltd.

 

Talisker is a junior resource company involved in the exploration of gold projects in British Columbia, Canada. Talisker’s projects include the Bralorne Gold Complex, an advanced stage project with significant exploration potential from a historical high-grade producing gold mine as well as its Spences Bridge Project where the Company holds ~85% of the emerging Spences Bridge Gold Belt and several other early stage Greenfields projects. With its properties comprising 277,292 hectares over 312 claims, six leases and 181 crown grant claims, Talisker is a dominant exploration player in the south-central British Columbia. The Company is well funded to advance its aggressive systematic exploration program at its projects.

 

Qualified Person

 

The technical information contained in this news release has been approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker’s Vice President, Exploration and Resource Development, who is a “qualified person” within the meaning of National Instrument 43-101, Standards of Disclosure for Mineral Projects.

 

Posted April 9, 2020

Share this news article

MORE or "UNCATEGORIZED"


First Phosphate Intersects 92.5 m of 11.82% Igneous Phosphate Starting at Surface at Its Begin-Lamarche Project in Saguenay-Lac-St-Jean, Quebec, Canada

First Phosphate Corp. (CSE: PHOS) (OTC: FRSPF) (FSE: KD0) is plea... READ MORE

April 23, 2024

Kuya Silver Provides Update on Mine Start-up and Uncovers New Major Silver-Mineralized Vein Zone South of the Bethania Mine, Peru

Kuya Targeting Commencement of Production at Bethania in H1 2024 ... READ MORE

April 23, 2024

Silvercorp Reports Operational Results and Financial Results Release Date for Fiscal 2024, and Issues Fiscal 2025 Production, Cash Costs, and Capital Expenditure Guidance

Silvercorp Metals Inc. (TSX: SVM) (NYSE American: SVM) reports pr... READ MORE

April 23, 2024

Lithium Ionic Expands Newly Discovered Zone at Salinas; Drills 1.53% Li2O over 15m, incl. 2.31% Li2O over 8m; 1.15% Li2O over 19m, incl. 1.67% Li2O over 10m, and 1.32% Li2O over 14m

Excellent follow-up drill results from high-grade discovery holes... READ MORE

April 23, 2024

Solaris Reports First Drilling Results from 2024 Program and Exploration Update, Including 150m of 0.67% CuEq within 384m of 0.51% CuEq and 284m of 0.53% CuEq from Near Surface

Solaris Resources Inc. (TSX: SLS) (NYSE: SLSR) is pleased to repo... READ MORE

April 23, 2024

Copyright 2024 The Prospector News