Surge Announces Positive Pre-Feasibility Study at Nevada North: After-Tax NPV8% of US$9.81 Billion, After-Tax IRR of 23.6% and Operating Cost of US$4,719/tonne Lithium Carbonate

          PFS improves on 2025 PEA with lower Phase 1 capital, lower operating cost, higher recovery and a faster 4.2-year payback over a 42-year mine life   Surge Battery Metals Inc. (TSX-V: NILI) (OTCQX: NILIF) (FSE: …
... READ MORE
October 5, 2026


Copyright 2026 The Prospector News