Eloro Resources Intersects 150.47 g Ag eq/t (9.45 g Ag/t, 1.53% Zn, 0.88% Pb and 0.07% Sn) over 441.21m in High-Grade Feeder Zone in Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

          This intersection in hole DSB-30 includes a higher-grade portion grading 209.30 g Ag eq/t (10.06 g Ag/t, 2.76% Zn, 0.98% Pb and 0.07% Sn) over 102.30m. This hole has the longest continuously mineralized intersection obtained …
... READ MORE
September 20, 2022


Copyright 2025 The Prospector News