Abitibi Metals Drills 44.5 Metres At 2.82% CuEq in Central Drilling At The B26 Polymetallic Deposit

          Highlights: The Company has received results from drillholes 1274-24-301-305 and 339-341 highlighted by the following intervals: #339 – 2.82% CuEq over 44.5 metres beginning at 146 metres depth #340 – 3.35 % CuEq over 20.75 metres …
... READ MORE
May 2, 2024

Abitibi Metals Drills 19.75 Metres At 1.35% CuEq In Western Extension With 500 Metre Step-out At The B26 Polymetallic Deposit

          Highlights: The Company has received results from drillholes 1274-24-333 to 337, highlighted by the following intervals: #335 – 0.93% CuEq over 26.9 metres beginning at 44.5 metres depth #336 – 1.35% CuEq over 19.75 metres beginning at 216.2 metres depth The …
... READ MORE
April 29, 2024

ABITIBI METALS DRILLS 10.6 METRES AT 11.4% CU EQ WITHIN 34 METRES AT 4.1% CU EQ NEAR SURFACE AT THE B26 DEPOSIT*

        First Two Drill Holes in Ongoing 30K Metre Campaign Among Highest-Grade in Project History, Support Open Pit Potential at B26 Polymetallic Deposit, Quebec   Highlights: Drillhole 1274-24-293 intersected 4.0% CuEq over 22.7 metres, including 6.3% CuEq over 10.6 metres beginning …
... READ MORE
February 29, 2024


Copyright 2024 The Prospector News