The Prospector News

Stronger Q2 Puts Barrick On Track to Achieve 2023 Targets

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Stronger Q2 Puts Barrick On Track to Achieve 2023 Targets

 

 

 

 

 

Barrick Gold Corporation (TSX:ABX) (NYSE:GOLD) reported preliminary Q2 sales of 1.00 million ounces of gold and 101 million pounds of copper, as well as preliminary Q2 production of 1.01 million ounces of gold and 107 million pounds of copper. As previously guided, Barrick’s gold and copper production in 2023 is expected to increase through the year with the second half being higher than the first six months of 2023. The Company remains on track to achieve full year gold and copper guidance.1

 

The average market price for gold in Q2 was $1,976 per ounce while the average market price for copper in Q2 was $3.84 per pound. The Company’s second quarter realized copper price2 is expected to be 3% to 5% below the average second quarter market price for copper, primarily as a result of provisional pricing adjustments3 that reflect the decrease in the copper price over the course of Q2.

 

Preliminary Q2 gold production was higher than Q1, primarily as a result of higher production at Carlin, driven by a return to normal throughput levels following significant maintenance undertaken in the first four months of the year, as well as higher grades at both Kibali and Veladero. This was offset by lower production at: Cortez due to mine sequencing; Turquoise Ridge due to planned autoclave maintenance; and Pueblo Viejo, where tie-in work and commissioning of the plant expansion project impacted production. Compared to Q1, Q2 gold cost of sales per ounce4 is expected to be 3% to 5% lower, total cash costs per ounce5 are expected to be 1% to 3% lower, and all-in sustaining costs per ounce5 are expected to be up to 2% lower.

 

Preliminary Q2 copper production was higher than Q1, driven primarily by Lumwana. Compared to Q1, Q2 copper cost of sales per pound4 is expected to be 11% to 13% lower, C1 cash costs per pound5 are expected to be 15% to 17% lower, and all-in sustaining costs per pound5 are expected to be 7% to 9% lower.

 

Barrick will provide additional discussion and analysis regarding its second quarter 2023 production and sales when the Company reports its quarterly results before North American markets open on August 8, 2023.

 

The following table includes preliminary gold and copper production and sales results from Barrick’s operations:

  Three months ended
June 30, 2023
Six months ended
June 30, 2023
  Production Sales Production Sales
Gold (attributable ounces (000))    
Carlin (61.5%) 248 243 414 407
Cortez (61.5%) 110 112 250 249
Turquoise Ridge (61.5%) 68 72 149 154
Phoenix (61.5%) 29 28 56 54
Long Canyon (61.5%) 3 3 5 5
Nevada Gold Mines (61.5%) 458 458 874 869
Loulo-Gounkoto (80%) 141 140 278 274
Pueblo Viejo (60%) 77 79 166 169
North Mara (84%) 64 64 132 134
Kibali (45%) 87 87 151 154
Tongon (89.7%) 44 45 94 97
Bulyanhulu (84%) 49 48 93 94
Veladero (50%) 54 45 97 89
Hemlo 35 35 76 75
Total Gold 1,009 1,001 1,961 1,955
         
Copper (attributable pounds (millions))    
Lumwana 67 63 115 112
Zaldívar (50%) 22 22 44 45
Jabal Sayid (50%) 18 16 36 33
Total Copper 107 101 195 190

Technical Information

 

The scientific and technical information contained in this news release has been reviewed and approved by: Craig Fiddes, SME-RM, Lead, Resource Modeling, Nevada Gold Mines; Chad Yuhasz, P.Geo, Mineral Resource Manager, Latin America & Asia Pacific; and Richard Peattie, MPhil, FAusIMM, Mineral Resources Manager: Africa and Middle East — each a “Qualified Person” as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

 

Endnote 1

 

Porgera has been on temporary care and maintenance since April 2020 and is not currently included in our full year 2023 guidance. On April 9, 2021, the Government of Papua New Guinea (“PNG”) and Barrick Niugini Limited (“BNL”), the operator of the Porgera joint venture, signed a Framework Agreement in which they agreed on a partnership for Porgera’s future ownership and operation. On February 3, 2022, the Framework Agreement was replaced by the more detailed Porgera Project Commencement Agreement (the “Commencement Agreement”). On March 31, 2023, PNG, BNL, and New Porgera Limited, the new Porgera joint venture company, entered into the New Porgera Progress Agreement, which confirmed that all parties are committed to reopening the mine, in line with the terms of the Commencement Agreement and the Shareholders’ Agreement for the new Porgera joint venture company, both concluded in 2022. We expect to update our guidance to include Porgera following the execution of all of the definitive agreements to implement the binding Commencement Agreement, the satisfaction of all other conditions precedent, and the finalization of a timeline for the resumption of full mine operations.

 

Endnote 2

 

Copper realized price is a non-GAAP financial measure which excludes treatment and refining charges from sales.

 

We believe this provides investors and analysts with a more accurate measure with which to compare to market copper prices and to assess our copper sales performance. For those reasons, management believes that this measure provides a more accurate reflection of our Company’s past performance and is a better indicator of its expected performance in future periods.

 

The realized price measure is intended to provide additional information, and does not have any standardized definition under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measure is not necessarily indicative of sales as determined under IFRS. Other companies may calculate this measure differently.

 

Barrick will provide a full reconciliation of this non-GAAP financial measure when the Company reports its quarterly results on August 8, 2023.

 

Endnote 3

 

The sales price for Barrick’s copper production is determined provisionally at the date of sale with the final price determined based on market copper prices at a future date set by the customer, generally one to three months after the initial date of sale. Market prices for copper may fluctuate during this extended settlement period. The prices of Barrick’s copper sales are marked-to-market at the balance sheet date based on the forward copper price for the relevant quotational period. All such mark-to-market adjustments are recorded in copper sale revenues. If the market price for copper declines, the final sales price realized by the company at settlement may be lower than the provisional sales price initially recognized by the company, requiring negative adjustments to Barrick’s average realized copper price for the relevant period.

 

Endnote 4

 

Gold cost of sales per ounce is calculated as cost of sales across our gold operations (excluding sites in care and maintenance) divided by ounces sold (both on an attributable basis based on Barrick’s ownership share). Copper cost of sales per pound is calculated as cost of sales across our copper operations divided by pounds sold (both on an attributable basis based on Barrick’s ownership share).

 

References to attributable basis means our 100% share of Hemlo and Lumwana, our 89.7% share of Tongon, our 84% share of North Mara and Bulyanhulu, our 80% share of Loulo-Gounkoto, our 61.5% share of Nevada Gold Mines, our 60% share of Pueblo Viejo, our 50% share of Veladero, Zaldívar and Jabal Sayid and our 45% share of Kibali.

 

Endnote 5

 

Total cash costs per ounce and all-in sustaining costs per ounce are non-GAAP financial measures which are calculated based on the definition published by the World Gold Council (“WGC”) (a market development organization for the gold industry comprised of and funded by gold mining companies from around the world, including Barrick). The WGC is not a regulatory organization. Management uses these measures to monitor the performance of our gold mining operations and its ability to generate positive cash flow, both on an individual site basis and an overall company basis.

 

Total cash costs start with our cost of sales related to gold production and removes depreciation, the non-controlling interest of cost of sales and includes by-product credits. All-in sustaining costs start with total cash costs and include sustaining capital expenditures, sustaining leases, general and administrative costs, minesite exploration and evaluation costs and reclamation cost accretion and amortization. These additional costs reflect the expenditures made to maintain current production levels.

 

We believe that our use of total cash costs and all-in sustaining costs will assist analysts, investors and other stakeholders of Barrick in understanding the costs associated with producing gold, understanding the economics of gold mining, assessing our operating performance and also our ability to generate free cash flow from current operations and to generate free cash flow on an overall company basis. Due to the capital-intensive nature of the industry and the long useful lives over which these items are depreciated, there can be a significant timing difference between net earnings calculated in accordance with IFRS and the amount of free cash flow that is being generated by a mine and therefore we believe these measures are useful non-GAAP operating metrics and supplement our IFRS disclosures. These measures are not representative of all of our cash expenditures as they do not include income tax payments, interest costs or dividend payments. These measures do not include depreciation or amortization.

 

Total cash costs per ounce and all-in sustaining costs per ounce are intended to provide additional information only and do not have standardized definitions under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. These measures are not equivalent to net income or cash flow from operations as determined under IFRS. Although the WGC has published a standardized definition, other companies may calculate these measures differently.

 

C1 cash costs per pound and all-in sustaining costs per pound are non-GAAP financial measures related to our copper mine operations. We believe that C1 cash costs per pound enables investors to better understand the performance of our copper operations in comparison to other copper producers who present results on a similar basis. C1 cash costs per pound excludes royalties and production taxes and non-routine charges as they are not direct production costs. All-in sustaining costs per pound is similar to the gold all-in sustaining costs metric and management uses this to better evaluate the costs of copper production. We believe this measure enables investors to better understand the operating performance of our copper mines as this measure reflects all of the sustaining expenditures incurred in order to produce copper. All-in sustaining costs per pound includes C1 cash costs, sustaining capital expenditures, sustaining leases, general and administrative costs, minesite exploration and evaluation costs, royalties and production taxes, reclamation cost accretion and amortization and write-downs taken on inventory to net realizable value.

 

Barrick will provide a full reconciliation of these non-GAAP financial measures when the Company reports its quarterly results on August 8, 2023.

 

Posted July 13, 2023

Share this news article

MORE or "UNCATEGORIZED"


Commerce Resources Announces Closing Of C$2.15 Million Non-Brokered Private Placement Of Secured Convertible Notes

Commerce Resources Corp.  (TSX-V: CCE) (FSE: D7H0) is pleased to... READ MORE

May 13, 2025

North Bay Resources Announces Resource Estimate of 474,000 ounces at Fran Gold Project, British Columbia

North Bay Resources, Inc. (OTC: NBRI) is pleased to announce a re... READ MORE

May 13, 2025

NEVGOLD ADDS MORE SIGNIFICANT OXIDE GOLD-ANTIMONY RESULTS: 2.19 G/T AUEQ OVER 64.0 METERS (0.72 G/T AU AND 0.33% ANTIMONY), INCLUDING 4.17 G/T AUEQ OVER 24.1 METERS (1.47 G/T AU AND 0.60% ANTIMONY), AND ALSO INCLUDING 10.86 G/T AUEQ OVER 4.50 METERS (1.43 G/T AU AND 2.10% ANTIMONY) AT THE LIMOUSINE BUTTE PROJECT, NEVADA

NevGold Corp. (TSX-V:NAU) (OTCQX:NAUFF) (Frankfurt:5E50) is pleas... READ MORE

May 13, 2025

G2 Drills 76m @ 1.5 g/t Au and 3m @ 12.5 g/t Au in Scout Drilling at Peters Mine, Guyana

G2 Goldfields Inc. (TSX: GTWO) (OTCQX: GUYGF) is pleased to annou... READ MORE

May 13, 2025

Aya Gold & Silver Reports Record Q1-2025 Results, Strengthens Liquidity and Reaffirms Guidance

Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) announced fi... READ MORE

May 13, 2025

Copyright 2025 The Prospector News