The Prospector News

St. Augustine Gold and Copper Limited Announces Closing of Private Placement

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

St. Augustine Gold and Copper Limited Announces Closing of Private Placement

 

 

 

 

 

St. Augustine Gold and Copper Limited (TSX:SAU) announced today that it has closed its previously announced private placement with Queensberry Mining and Development Corp. for 55,000,000 shares at a subscription price of US$0.20 per share for a total investment of US$11 million. The funds received will be used for working capital and to further advance the King-king Project. Located in the Philippines, King-king is one of the largest undeveloped copper-gold deposits in the world.
 

The shares issued pursuant to this private placement will be subject to trading restrictions until October 1, 2013.
 

ABOUT THE KING-KING PROJECT
 

King-king is one of the largest undeveloped copper-gold deposits in the world. As released in the October 2010 Technical Report and the updated resource report released August 15, 2011, Measured mineral resources are 120.3 million tonnes at 0.315% total copper, 0.112 soluble copper and 0.816 grams per tonne (g/t) gold; Indicated mineral resources are 841.9 million tonnes at 0.245% total copper, 0.054% soluble copper, and 0.316 grams per tonne (g/t) gold. Inferred mineral resources are an additional 188.8 million tonnes at 0.215% total copper, 0.048% soluble copper, and 0.265 g/t gold. The Measured and Indicated mineral resource consists of 5.4 billion pounds of contained copper and 10.3 million troy ounces of contained gold.
 

The King-king deposit is a gold rich copper-gold porphyry deposit located in the southeast of the Philippine Island of Mindanao, 35km east of Davao City and 13 km from the coast. The project is listed as one of the top priority projects by the Philippine Mines and Geosciences Bureau. The project has a strip ratio less than one for years 1to 5 and is in an advanced stage with 95,651 meters of drilling composed of 291 core and reverse circulation (“RC”) holes, including 6,052 meters of new drilling composed of 14 core holes (and 1 RC) in 2011. King-king has entered the feasibility stage of development (social, environmental and engineering phases).

Posted June 3, 2013

Share this news article

MORE or "UNCATEGORIZED"


Maverix Metals to Increase Credit Facility to US$120 Million

Maverix Metals Inc. (NYSE American: MMX) (TSX: MMX) is pleased to... READ MORE

September 16, 2019

Brixton Metals Samples 45 g/t Au at Union and Drills 8.53 g/t Au over two metres at LD on its Atlin Goldfields Project

Brixton Metals Corporation (TSX-V: BBB) (OTCQB: BBBXF) is pleased... READ MORE

September 16, 2019

Osisko Announces Sale of Brucejack Offtake to Pretium

Osisko Gold Royalties Ltd (TSX:OR) (NYSE:OR) announces today that... READ MORE

September 16, 2019

Balmoral Intersects 14.03 g/t Gold Over 3.29 Metres in Shallow, High-Grade Gold Discovery, Area 52, Detour Gold Trend Project, Quebec

Balmoral Resources Ltd. (TSX: BAR) (OTCQX: BALMF) announces that ... READ MORE

September 16, 2019

Beta Hunt Gold Mineralized System Continues to Grow

RNC Minerals (TSX: RNX) (RNC) is pleased to announce results of t... READ MORE

September 16, 2019

Copyright 2019 The Prospector News - Site design by Spyderbaby Productions