SPC Nickel Corp. (TSX-V: SPC) is pleased to announce new assay results from its Phase 1 drilling campaign, including the complete assay results from hole WG-23-026, at the recently consolidated West Graham and Crean Hill 3 properties located in the world-class Nickel-Copper mining district of Sudbury, Ontario.
Highlights
Grant Mourre, CEO and President of SPC Nickel commented, “We are enthusiastic about these assay results from the West Graham Project drilling program which continue to return thick mineralized zones with nickel and copper grades that are equal to or better than the historic West Graham Resource. To date, assays from only 9 of the 22 holes drilled during the campaign have been received from the lab, so we expect to continue providing updates on results through the remainder of this quarter. Our focus remains on working towards delivering a combined mineral resource estimate at the West Graham Project by the end of 2023.”
Assay Results
Notes: Results for hole WG-23-020 and partial results for WG-23-026 were previously reported in Company’s April 11, 2023 news release.
West Graham Project
On January 23, 2023, SPC Nickel announced the signing of an Agreement with Vale Canada granting SPC Nickel the right to earn 100% interest in the Crean Hill 3 Property which is adjacent to SPC Nickel’s West Graham Property (see Figure 2 for property location and SPC Nickel’s January 23, 2023 press release for full details of the Agreement).
SPC Nickel considers the West Graham and Crean Hill 3 resource estimates to be historic mineral estimates for purposes of NI 43-101. Neither the Company nor a qualified person on behalf of SPC Nickel have done sufficient work to classify the historical estimates as current mineral resources and SPC Nickel is not treating such historical estimates as current mineral resources. SPC Nickel considers the historic mineral estimates to be relevant to an understanding of the Project but has not done any work to validate the estimates. Nickel Equivalent value (NiEq.) % = Ni% + Cu% x 0.32 + Co% x 0.53 and does not factor in Pt, Pd, Au or Ag values. No allowances have been made for recovery losses that may occur should mining eventually result. The NiEq.% calculation used in this release is consistent with the relative metal prices used in the West Graham Resource report published by First Nickel Inc. in 20092.
Reference
Quality Assurance, Quality Control and Qualified Persons
The technical elements of this news release have been approved by Mr. Grant Mourre, P.Geo. (PGO), CEO and President of SPC Nickel Corp. and a Qualified Person under National Instrument 43-101.
SPC Nickel follows rigorous sampling and analytical protocols that meet or exceed industry standards. Core samples are stored in a secured area until transport in batches to the ALS facility in Sudbury, Ontario, Canada. Sample batches include certified reference materials, blank, and duplicate samples that are then processed under the control of ALS. All samples were analyzed in Vancouver by ALS Chemex. Platinum, palladium, and gold values were determined together using standard lead oxide collection fire assay and ICP-AES finish. Base metal values were determined using sodium peroxide fusion and ICP-AES finish. Silver values were determined using an aqua regia digestion and an AAS finish. A Certified Reference Material (CRM) standard, blank or duplicate is inserted on every 10th sample in the following order: CRM, blank, CRM, duplicate. The cycle repeats every 40 samples, thus ensuring that 10% of samples submitted are control samples.
About SPC Nickel Corp.
SPC Nickel Corp. is a Canadian public corporation focused on exploring for Ni-Cu-PGMs within the world class Sudbury Mining Camp. SPC Nickel is currently exploring its key 100% owned exploration project Lockerby East located in the heart of the historic Sudbury Mining Camp that includes the Graham West Resource and the Crean Hill 3 property under option from Vale. SPC Nickel also holds three additional projects across Canada including the large camp-scale Muskox Project (located in Nunavut), the past producing Aer-Kidd Project (located in the Sudbury Mining Camp) and the Janes Project (located 50 km northwest of Sudbury). The corporate focus is on Sudbury, and SPC Nickel continues to look for new opportunities to add shareholder value.
Table 1: Assay results from the Phase 1 drill program on the West Graham Project. Assays from all holes not listed in Table 1 are pending. (CNW Group/SPC Nickel Corp.)
Figure 1: Plan map of the current area of drilling on the West Graham Project showing the collar locations and drill traces of the completed holes. (CNW Group/SPC Nickel Corp.)
Figure 2: Aerial plan map of the West Graham area showing the relative locations of the historic Crean Hill 3, West Graham and Lockerby East resources. Addition current and historic mineralized zones including the Crean Hill Mine (current and historic), Lockerby Mine (historic) and the Ellen Pit (historic) are also shown. (CNW Group/SPC Nickel Corp.)
Red Pine Exploration Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased ... READ MORE
F3 Uranium Corp. (TSX-V: FUU) (OTC Pink: FUUFF) is pleased to ann... READ MORE
Collective Mining Ltd. (NYSE: CNL) (TSX: CNL) is pleased to ann... READ MORE
Aris Mining Corporation (TSX: ARIS) (NYSE-A: ARMN) announces t... READ MORE
Staffing in place and operations shakedown underway Rare E... READ MORE