The Prospector News

SNC-Lavalin awarded construction management services contract by Coeur Mining for Rochester POA 11 project in US

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

SNC-Lavalin awarded construction management services contract by Coeur Mining for Rochester POA 11 project in US

 

 

 

 

 

SNC-Lavalin (TSX:SNC) is pleased to announce that it has been awarded a $30 million USD contract by Coeur Rochester, Inc., a wholly-owned subsidiary of Coeur Mining, Inc (NYSE: CDE), to provide construction management services for the Plan of Operations, Amendment Number 11 (“POA 11”)  expansion project at Coeur’s Rochester mine near Lovelock, Nevada. The contract commenced in fourth quarter 2020 and is estimated to be completed by the end of 2022. This win is aligned with SNC-Lavalin’s new strategy moving forward in the Services segment.

 

 

“SNC-Lavalin’s Mining & Metallurgy strategic plan is gaining traction with this mandate. It is an example of the mining services work that our team is winning across our core geographies, including the United States of America. SNC-Lavalin and Coeur continue to foster a strong relationship that finds and executes services solutions to create world-class operations,” said César Inostroza, Senior Vice-President, Mining & Metallurgy, SNC-Lavalin. “This award is a testament to the continued partnership between SNC-Lavalin and Coeur. It leverages our knowledge of the Rochester mine and engineering expertise from the previous phase of this project and expands our work in the US.”

 

 

The POA 11 expansion project includes the construction of a new crushing plant, including a primary, secondary and tertiary crushing circuit (high pressure grinding rolls), a new heap leach pad (300,000,000 tons), a new Merrill Crowe process plant (13,750 gallons per minute), and upgrades to existing electrical utility system infrastructure, including a new substation and power distribution lines. This mandate is well aligned with our expertise in silver, gold and base metal project delivery as well as our commitment to delivering real value to our clients. SNC-Lavalin’s offices in Reno, Nevada and Toronto, Ontario will continue to support the construction management phase of the project. In addition, a team based locally at the site will manage construction-related activities.

 

 

“The strong business partnership between Coeur and SNC-Lavalin will help ensure a robust project delivery for Rochester, paving the way for improved performance in the future.” said Terrence F.D. Smith, Coeur’s Senior Vice President and Chief Development Officer. “All of us at Coeur look forward to continue working with SNC-Lavalin as we advance this pivotal project.”

 

Since approval of the initial Plan of Operation in 1986, the Rochester mine has undergone periodic mine plan amendments to support development projects and continued operations. The Plan of Operations, Amendment Number 11 (“POA 11”) proposes another mine life extension, which is expected to maintain the current workforce and support full production activities at Rochester until 2033.  Coeur’s Rochester mine is located 100 miles northeast of Reno near Lovelock, Nevada. It is an open-pit mining operation that produces silver and gold. Mining methods include typical open-pit techniques where ore and waste rock are drilled, blasted, crushed, loaded and hauled to either leach pads (ore) or rock disposal sites.

 

About SNC-Lavalin

 

 

Founded in 1911, SNC-Lavalin is a fully integrated professional services and project management company with offices around the world. SNC-Lavalin connects people, technology and data to help shape and deliver world-leading concepts and projects, while offering comprehensive innovative solutions across the asset lifecycle. Our expertise is wide-ranging — consulting & advisory, intelligent networks & cybersecurity, design & engineering, procurement, project & construction management, operations & maintenance, decommissioning and sustaining capital – and delivered to clients in four strategic sectors: EDPM (engineering, design and project management), Infrastructure, Nuclear and Resources, supported by Capital. People. Drive. Results.

 

Posted January 13, 2021

Share this news article

MORE or "UNCATEGORIZED"


Energy Fuels Announces Q2-2021 Results, Including Robust Balance Sheet, Market Leading U.S. Uranium and Vanadium Position & Launch of U.S. Commercial Rare Earth Production; Webcast on August 3, 2021

Energy Fuels Inc. (NYSE American: UUUU) (TSX: EFR) reported its f... READ MORE

August 2, 2021

Wealth Closes Final Tranche of Strategic Investment for Total of $3,036,000

Wealth Minerals Ltd. (TSX-V: WML) (OTCQB: WMLLF) (SSE: WMLCL) (FS... READ MORE

August 2, 2021

Blue Sky Uranium Closes Final Tranche of Non-Brokered Private Placement

Blue Sky Uranium Corp. (TSX-V: BSK) (FSE: MAL2) (OTC: BKUCF) is p... READ MORE

August 2, 2021

Thor Explorations Announces First Gold Pour at Its Segilola Gold Mine in Nigeria

Thor Explorations Ltd. (TSX-V: THX) (AIM: THX) is pleased to anno... READ MORE

July 30, 2021

Goliath Drills 67.1 Meters of Quartz-Sulphide Veining, Brecciation and Associated Alteration in Fourth Drill Hole (GD21-004) at the Surebet Zone, Golden Triangle B.C.

One hundred percent of the drill holes completed to date have int... READ MORE

July 30, 2021

We acknowledge the [financial] support of the Government of Canada.

Government of Canada Supported
Copyright 2021 The Prospector News