The Prospector News

SilverCrest Appoints New VP; Updates La Joya Resources

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

SilverCrest Appoints New VP; Updates La Joya Resources

 

 

 

SilverCrest Mines Inc. (TSX VENTURE:SVL)(NYSE MKT:SVLC) announce the appointment of Mr. Marcio Fonseca (P.Geo.) to the newly created position of Vice President, Corporate Development. In his new position, Mr. Fonseca will be responsible for developing, implementing and executing all aspects of SilverCrest’s corporate development opportunities designed to accelerate the Company’s growth and enhance its shareholder’s value. Mr. Fonseca’s responsibilities will be to forge new and strengthen existing relationships with institutional and retail investors, source and evaluate opportunities for corporate and property acquisitions, develop and implement corporate financial strategies and raise the corporate profile of the Company in the general investment community through marketing and presentation of the Company’s assets and plans for growth
 

—————————————————————————————————————–

 

 

SilverCrest Mines Inc. (TSX VENTURE:SVL)(NYSE MKT:SVLC)(NYSE Amex:SVLC) announce an updated resource estimation for the La Joya Property in Durango, Mexico. The updated Inferred Resources are summarized as (refer to tables below for details);

 

 

 

– Cutoff grade of 15 gpt silver equivalent    198.6 million ounces Ag Eq

(Ag Eq(i),Global Case):

– Cutoff grade of 30 gpt Ag Eq (Base Case);   159.8 million ounces Ag Eq

– Cut-off grade of 60 gpt Ag Eq (High Grade   100.8 million ounces of Ag Eq

Case);

– Cut-off grade of 0.05% WO3;                 75.1 million pounds (35,700

tonnes) of tungsten

 

 

 

The Company believes that the 60 gpt Ag Eq portion of the deposit with an estimated tonnage of 27.9 million tonnes grading 112 grams per tonne Ag Eq(i) constitutes a priority area to be examined as a potential “Starter Pit” for initial conceptual operations that will be examined in the Preliminary Economic Assessment (PEA) to be commenced shortly. The La Joya Property has excellent potential for additional resources with the deposits being open in most directions. Further infill and expansion drilling is recommended to increase and convert resources from Inferred to Indicated.
 

These resources have been independently estimated by EBA Engineering Consultants Ltd., a Tetra Tech Company utilizing Company Phase I and Phase II drill results and surface sampling programs along with independently-validated historic data. Drilling to date has been relatively widespread in the Main Mineralized Trend (MMT) as well as the independent deposits of Coloradito and Santo Nino. The MMT which includes the Phase I and II drilling areas, has a length of 2.5 kilometres and an average minimum width of over 700 metres (see attached Figures – http://media3.marketwire.com/docs/svl129_F1-2.pdf).

 
The La Joya resource models separate the deposits into two broad categories based on the predominant mineralogy. The first category is comprised of silver, gold and copper mineralization (AgCu Rich Zone), with lesser amounts of tungsten (WO3), molybdenum (Mo), lead (Pb), and Zinc (Zn). The second category is predominantly tungsten and molybdenum mineralization (Contact Zone) with lesser amounts of Ag, Cu, Au, Pb, and Zn. The mineralogy of these categories is often gradational and overprinted in some areas. The AgCu Rich Zone generally lies spacially above the Contact Zone and generally follows the contours of the underlying intrusive, which outcrops in several areas. The summaries of the resource estimates below show the resources attributed to each of these mineralization categories for each of the current deposits, specifically, the MMT, Santo Nino, and Coloradito.

Posted February 1, 2013

Share this news article

MORE or "UNCATEGORIZED"


Silver Mountain Announces Closing of Prospectus Offering

Silver Mountain Resources Inc. (TSX-V: AGMR) (OTCQB: AGMRF) is ... READ MORE

April 24, 2024

Mandalay Extends the Storheden Gold Deposit Adjacent to the Operating Björkdal Mine

Mandalay Resources Corporation (TSX: MND) (OTCQB: MNDJF) announce... READ MORE

April 24, 2024

Collective Mining Intercepts 632.25 Metres at 1.10 g/t Gold Equivalent in a 200 Metre Step-Out Hole to the South at Trap

Collective Mining Ltd. (TSX: CNL) (OTCQX: CNLMF) (FSE: GG1) is pl... READ MORE

April 24, 2024

Koryx Copper Intersects 207 Meters at 0.49% and 116 Meters at 0.54% Copper Equivalent

Significant copper and molybdenum intersections include: HM19: 11... READ MORE

April 24, 2024

Red Pine Intercepts Significant Mineralization at the Wawa Gold Project, including 5.34 g/t over 13.39 metres including 16.50 g/t gold over 0.97 metre and 13.62 g/t gold over 2.13 metres

Red Pine Exploration Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased ... READ MORE

April 24, 2024

Copyright 2024 The Prospector News