The Prospector News

Silver Tiger Metals – 3 meters of 1,526 g/t Silver Eq Returned From Drilling Into The Sulphide Zone

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Silver Tiger Metals – 3 meters of 1,526 g/t Silver Eq Returned From Drilling Into The Sulphide Zone

 

 

 

 

Glenn Jessome, President and CEO of Silver Tiger Metals (TSX.V:SLVR – OTCQX:SLVTF), joins me to review the first assay results from the #exploration campaign being conducted from underground drill pads targeting the high-grade silver veins, and the Sulfide and Shale Zones on its 100% owned, #silver#gold El Tigre Project in Mexico.

  • Highlights from the drilling program include the following:

— Hole ET-24-627: 3.0 meters grading 1,526.3 g/t total silver equivalent from 297.5 meters to 300.5 meters, consisting of 833.5 g/t silver, 0.13 g/t gold, 0.87% #copper, 6.22% #lead and 13.24% #zinc within 17.3 meters grading 309.0 g/t total silver equivalent from 297.5 meters to 314.8 meters consisting of 160.0 g/t silver, 0.12 g/t gold, 0.18% copper, 1.34% lead and 2.68% zinc in the Sulfide Zone. — Hole ET-23-626:8 meters grading 321.0 g/t total silver equivalent from 253.5 meters to 258.3 meters, consisting of 254.1 g/t silver, 0.10 g/t gold, 0.33% copper, 0.33% lead and 0.61% zinc within 17.1 meters grading 140.0 g/t total silver equivalent from 242.0 meters to 259.1 meters consisting of 95.4 g/t silver, 0.09 g/t gold, 0.13% copper, 0.29% lead and 0.54% zinc in the Sulfide Zone.

 

This underground drilling work will continue with 1 drill rig, and all the prior data and other derisking work that the company is busy with in the background will be building toward a Preliminary Economic Study on the underground mining phase, set to release later in Q2. We discussed that banks and institutional analysts are now taking notice of these underground drill results, with Desjardins, Ventum Capital Markets, and SCP Research, all issuing updates and upgrades to their share price targets following this recent news.

 

Additionally, we also circled back to the ongoing #permitting developments and more mining permits just issued by the new political administration in Mexico. Now that permits have started getting granted in Mexico, he feels it is just a matter of time before the first open-pit permits start getting issued in the first half of 2025. Glenn points out that this permitting visibility will be a very meaningful catalyst for the company and many Mexican mining projects across the board to get rerated significantly higher.

 

Courtesy of Silver Tiger Metals via the KE Report

Posted February 13, 2025

Share this news article

MORE or "UNCATEGORIZED"


Hudbay Provides Annual Reserve and Resource Update with Mine Life Extensions and Improved Three-Year Production Outlook

Hudbay Minerals Inc. (TSX:HBM) (NYSE: HBM) today released its ann... READ MORE

March 27, 2026

OREZONE GOLD COMPLETES STRATEGIC ACQUISITION OF CASA BERARDI GOLD MINE AND QUEBEC EXPLORATION PORTFOLIO AND REPORTS FOURTH QUARTER 2025 RESULTS

Strategic acquisition of an established operating gold mine, loca... READ MORE

March 27, 2026

Cerro de Pasco Resources Secures Access Agreement Over Entire Quiulacocha Tailings Area, Enabling Next Phase of Project Development

Cerro de Pasco Resources Inc. (TSX-V: CDPR) (OTCQB: GPPRF) (FRA: ... READ MORE

March 26, 2026

SAGA Metals Acquires Strategic Titanium Assets from Rio Tinto in Quebec

The Garneau Titanium Project Features Ilmenite-Rich Boulder with ... READ MORE

March 26, 2026

ValOre Reports Positive Leaching Results from Ongoing Metallurgical Program for Pedra Branca PGM Project, Brazil; 73% Platinum and 74% Palladium Achieved Extraction from Weathered Material and 66% Platinum and 79% Palladium from Chromitite;

ValOre Metals Corp. (TSX‐V: VO) (OTCQB: KVLQF) (Frankfurt: KEQ0... READ MORE

March 26, 2026

Copyright 2026 The Prospector News