The Prospector News

Second Rig Commences Drilling at Columbus Gold’s Paul Isnard Project in French Guiana; Third Drill in Transit.

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Second Rig Commences Drilling at Columbus Gold’s Paul Isnard Project in French Guiana; Third Drill in Transit.

 

 

 

 

 

Columbus Gold Corporation (TSX-V:CGT) is pleased to report that a second drill rig, operating on a 24 hour basis, commenced drilling on August 1st at Columbus Gold’s Montagne d’Or gold deposit, Paul Isnard Project, French Guiana. A third drill rig is in transit to French Guiana and is expected to arrive this month.
 

Utilizing a cut-off grade of 0.4 g/t gold, the Montagne d’Or gold deposit hosts a resource of 140.1 million tonnes grading 1 g/t gold for a total of 4.31 million contained Inferred ounces of gold. The best mineralized and most consistent zones on the Montagne d’Or deposit, based on current interpretation, are located in the principal Upper Felsic Zone (“UFZ”) (for further details, please refer to Columbus Gold’s news release of June 30, 2014). Drilling of the UFZ on a 50 metre spacing array began on June 23rd. There are approximately 16,000 metres remaining in the current Phase II program, which on deployment of the third drill rig, is scheduled to be completed in October.

Posted August 12, 2014

Share this news article

MORE or "UNCATEGORIZED"


Silver Mountain Announces Closing of Prospectus Offering

Silver Mountain Resources Inc. (TSX-V: AGMR) (OTCQB: AGMRF) is ... READ MORE

April 24, 2024

Mandalay Extends the Storheden Gold Deposit Adjacent to the Operating Björkdal Mine

Mandalay Resources Corporation (TSX: MND) (OTCQB: MNDJF) announce... READ MORE

April 24, 2024

Collective Mining Intercepts 632.25 Metres at 1.10 g/t Gold Equivalent in a 200 Metre Step-Out Hole to the South at Trap

Collective Mining Ltd. (TSX: CNL) (OTCQX: CNLMF) (FSE: GG1) is pl... READ MORE

April 24, 2024

Koryx Copper Intersects 207 Meters at 0.49% and 116 Meters at 0.54% Copper Equivalent

Significant copper and molybdenum intersections include: HM19: 11... READ MORE

April 24, 2024

Red Pine Intercepts Significant Mineralization at the Wawa Gold Project, including 5.34 g/t over 13.39 metres including 16.50 g/t gold over 0.97 metre and 13.62 g/t gold over 2.13 metres

Red Pine Exploration Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased ... READ MORE

April 24, 2024

Copyright 2024 The Prospector News