Santacruz Silver Mining Ltd. (TSX-V: SCZ) reports its financial and operating results for the first quarter of 2024. The full version of the financial statements and accompanying Management’s Discussion and Analysis can be viewed on the Company’s website at www.santacruzsilver.com or on SEDAR+ at www.sedarplus.ca.
Q1 2024 Highlights
Arturo Préstamo, Executive Chairman and CEO of Santacruz, commented, “Santacruz has successfully restructured its debt with Glencore, resulting in enhanced financial flexibility and a more robust balance sheet. This strategic move has bolstered the Company´s financial position and should allow for better optimization of Santacruz’s core business activities and the pursuit of long-term growth initiatives.”
Mr. Préstamo continued, “During the first quarter, production at our Bolivian mines faced several disruptions due to various events, including national holidays, and the national population census. Caballo Blanco experienced a challenging quarter due to additional production disruptions caused by safety training and mining in areas with lower silver grades. However, the preparation of new areas is progressing well, thanks to the integration ramp. Caballo Blanco is expected to mine areas with higher silver grades in the coming months and together with less operational disruptions, the Company expects a better performance. Our AISC per silver equivalent ounces sold increased due to the decrease in silver equivalent ounce sold, with the most impact being from Caballo Blanco. However, our Zimapan mine in Mexico experienced no production variances during the quarter, with the efficiency strategies implemented in late 2023 continuing to deliver improvements.”
Selected consolidated financial and operating information for the quarter ended March 31, 2024 are presented below. All financial information is prepared in accordance with International Financial Reporting Standards, and all dollar amounts are expressed in thousands of US dollars, except per unit amounts, unless otherwise indicated.
2024 First Quarter Highlights
2024-Q1 | 2023-Q4 | Change
Q1 vs Q4 |
2023-Q1 | Change
Q1 vs Q1 |
|
Operational |
|||||
Material Processed (tonnes milled) | 470,749 | 489,417 | (4 %) | 482,497 | (2 %) |
Silver Equivalent Produced (ounces) (1) | 4,478,122 | 4,788,318 | (6 %) | 4,727,882 | (5 %) |
Silver Ounces Produced | 1,581,949 | 1,719,737 | (8 %) | 1,769,520 | (11 %) |
Zinc Tonnes Produced | 22,847 | 23,777 | (4 %) | 22,463 | 2 % |
Lead Tonnes Produced | 2,953 | 3,130 | (6 %) | 3,043 | (3 %) |
Copper Tonnes Produced | 256 | 290 | (12 %) | 415 | (38 %) |
Silver Equivalent Sold (payable ounces) (2) | 3,632,938 | 3,813,863 | (5 %) | 4,380,895 | (17 %) |
Cash Cost of Production per Tonne (3) | 93.18 | 94.87 | (2 %) | 84.11 | 11 % |
Cash Cost per Silver Equivalent Ounce Sold ($/oz) (3) | 21.19 | 17.74 | 19 % | 17.29 | 23 % |
All-in Sustaining Cash Cost per Silver Equivalent Ounce Sold ($/oz) (3) | 24.12 | 21.37 | 13 % | 20.77 | 16 % |
Average Realized Price per Ounce of Silver Equivalent Sold ($/oz) (2) (3) (4) | 23.18 | 22.47 | 3 % | 22.03 | 5 % |
Financial |
|||||
Revenues | 52,589 | 57,616 | (9 %) | 65,378 | (20 %) |
Gross Profit | 463 | 1,550 | (70 %) | 14,680 | (97 %) |
Net Income (loss) | 129,025 | 16,271 | 693 % | (176) | 73,410 % |
Net Earnings (Loss) Per Share – Basic ($/share) | 0.37 | 0.05 | 640 % | 0.00 | 100 % |
Adjusted EBITDA (3) | (215) | 24,612 | (101 %) | 12,603 | (102 %) |
Cash and Cash Equivalent | 4,035 | 4,947 | (18 %) | 11,988 | (66 %) |
Working Capital (Deficiency) | 7,150 | (43,168) | 117 % | (78,906) | 109 % |
First Quarter 2024 Production Summary – By Mine
Bolivar (5) | Porco (5) | Caballo Blanco Group |
San Lucas | Zimapan | Total | ||
Material Processed (tonnes milled) | 72,801 | 50,862 | 72,462 | 69,220 | 205,404000 | 470,749 | |
Silver Equivalent Produced (ounces) (1) | 1,024,492 | 543,414 | 862,142 | 1,032,085 | 1,015,989 | 4,478,122 | |
Silver Ounces Produced | 425,756 | 176,436 | 284,809 | 294,998 | 399,950 | 1,581,949 | |
Zinc Tonnes Produced | 5,063 | 3,160 | 4,702 | 6,279 | 3,643 | 22,847 | |
Lead Tonnes Produced | 395 | 169 | 611 | 427 | 1,352 | 2,953 | |
Copper Tonnes Produced | N/A | N/A | N/A | N/A | 256 | 256 | |
Average head grades per mine: | |||||||
Silver (g/t) | 199 | 130 | 136 | 159 | 82 | 125 | |
Zinc (%) | 7.68 | 6.72 | 7.04 | 9.90 | 2.29 | 5.45 | |
Lead (%) | 0.74 | 0.46 | 1.10 | 0.96 | 0.83 | 0.84 | |
Copper (%) | N/A | N/A | N/A | N/A | 0.29 | 0.29 | |
Metal recovery per mine: | |||||||
Silver (%) | 91 | 83 | 90 | 83 | 74 | 81 | |
Zinc (%) | 91 | 92 | 92 | 92 | 77 | 84 | |
Lead (%) | 74 | 72 | 76 | 64 | 79 | 75 | |
Copper (%) | N/A | N/A | N/A | N/A | 43 | 43 | |
Silver Equivalent Sold (payable ounces) (2) | 1,014,743 | 419,230 | 573,347 | 754,910 | 870,708 | 3,632,938 | |
Notes for both tables above:
(1) | Silver Equivalent Produced (ounces) have been calculated using prices of $23.62/oz, $1.21/lb, $0.95/lb and $3.91/lb for silver, zinc, lead and copper respectively applied to the metal production divided by the silver price as stated here. |
(2) | Silver Equivalent Sold (payable ounces) have been calculated using the Average Realized Price per Ounce of Silver Equivalent Sold stated in the table above, applied to the payable metal content of the concentrates sold from Bolivar, Porco, the Caballo Blanco Group, San Lucas and Zimapan. |
(3) | The Company reports non-GAAP measures, which include Cash Cost of Production per Tonne, Cash Cost per Silver Equivalent Ounce Sold, All-in Sustaining Cash Cost per Silver Equivalent Ounce Sold, Average Realized Price per Ounce of Silver Equivalent Sold, and Adjusted EBITDA. These measures are widely used in the mining industry as a benchmark for performance, but do not have a standardized meaning and may differ from methods used by other companies with similar descriptions. See ”Non-GAAP Measures” section below for definitions. |
(4) | Average Realized Price per Ounce of Silver Equivalent Sold is prior to all treatment, smelting and refining charges. |
(5) | Bolivar and Porco are presented at 100% whereas the Company records 45% of revenues and expenses in its consolidated financial statements. |
Silver Equivalent Ounces Produced
Q1 2024 vs Q1 2023
In Q1 2024, the Company processed 470,749 tonnes of material and produced 4,478,112 silver equivalent ounces including 1,581,949 ounces of silver, 22,847 tonnes of zinc, 2,953 tonnes of lead and 256 tonnes of copper. When compared to Q1 2023, total material processed was slightly less, however silver equivalent ounce production decreased 5% due primarily to lower production, silver grade and plant recovery at Caballo Blanco.
Q1 2024 vs Q4 2023
When compared to the previous quarter total material processed was slightly less. Silver equivalent ounce production decreased 6% quarter-over-quarter as a result of less material processed, along with lower silver grades from the Bolivar and Caballo Blanco mines in Bolivia.
Cash Cost of Production per Tonne
Q1 2024 vs Q1 2023
Consolidated cash cost of production per tonne of mineralized material processed was $93.18 in Q1 2024 compared to $84.11 in Q1 2023. Increases in unit production costs at the Bolivian operations, a result of lower production rates have driven the consolidated net increase in cash costs of 11% per tonne.
Q1 2024 vs Q4 2023
Consolidated cash cost of production per tonne of mineralized material processed remained stable with a slight decrease of 2% driven mostly by incremental decreases across all operations. Cash cost per tonne at San Lucas increased 12%, which was offset by the 2% decrease at all other Bolivian operations. In Mexico, cash cost of production has decreased from the Q4 2023 high to be relatively in line with the other quarters of 2023.
Cash Cost per Silver Equivalent Ounce Sold
Q1 2024 vs Q1 2023
Cash cost per silver equivalent ounce sold was $21.19 in Q1 2024 compared to $17.29 in Q1 2023. There was an increase in unit costs together with a decrease of silver equivalent ounces sold mainly due to the silver equivalent conversion ratio of base metals to silver, which was higher due to the changes in realized metal prices and resulted in the reduction of silver equivalent ounces sold.
Q1 2024 vs Q4 2023
Consolidated results for Q1 2024 show an 19% increase in cash costs per silver equivalent ounce sold compared to Q4 2023. There was an increase in unit costs together with a decrease of silver equivalent ounces sold.
All-In Sustaining Cash Cost per Silver Equivalent Ounce Sold
Q1 2024 vs Q1 2023
Q1 2024 AISC per silver equivalent ounce sold was $24.12, compared to Q1 2023 of $20.77. This 16% increase in unit cost was due primarily to the 17% decrease in silver equivalent ounces sold.
Q1 2024 vs Q4 2023
Consolidated AISC per silver equivalent ounce sold increased 13% from Q4 2023, mainly a result of higher unit operating costs, partly offset by lower sustaining capital expenditures mostly related to the completion of the integration ramp at Caballo Blanco in Q1 2024.
Corporate Update
On May 13, 2024, the Board of Directors appointed Arturo Préstamo as CEO of the Company.
About Santacruz Silver Mining Ltd.
Santacruz Silver is engaged in the operation, acquisition, exploration, and development of mineral properties in Latin America. The Bolivian operations are comprised of the Bolivar, Porco and the Caballo Blanco Group, which consists of the Tres Amigos, Reserva and Colquechaquita mines. The Soracaya exploration project and San Lucas ore sourcing and trading business are also in Bolivia. The Zimapan mine is in Mexico.
Concurrent $11.5 Million Private Placement Equity Financing and P... READ MORE
Highlights: Integrated North Island Project resource estimate dem... READ MORE
Brixton Metals Corporation (TSX-V: BBB) (OTCQB: BBBXF) is pleased... READ MORE
Drillhole WMA082-11 Intersected 6.47% U3O8 Over 25.8 Metres; Including 2... READ MORE
First Ever Drill Assays from the Road IP Target Return 104.7 metr... READ MORE