The Prospector News

SANTA FE EXPLORATION PLAN OF OPERATIONS ENTERS NEPA REVIEW

You have opened a direct link to the current edition PDF

Open PDF Close
Slider

Share this news article

SANTA FE EXPLORATION PLAN OF OPERATIONS ENTERS NEPA REVIEW

 

 

 

 

 

Lahontan Gold Corp. (TSX-V: LG) (OTCQB: LGCXF) (FSE: Y2F) is pleased to announce that the company’s Exploration Plan of Operations has begun National Environmental Policy Act (“NEPA”) review by the Federal Bureau of Land Management. The BLM has up to six months to complete the process, however Lahontan, its permitting consultants, and the BLM believe the process will be much more rapid, as the POO has been posted on the BLM National NEPA Registry and a draft Environmental Assessment has already been completed. The Company has also signed a Contributed Funds Agreement with the BLM whereby Lahontan will provide funding to the BLM in support of the NEPA process allowing the BLM to assign additional personnel to the review team and potentially further reduce the time required to complete the review.

Kimberly Ann, Lahontan Founder, Chair, CEO, and President commented: “Lahontan is excited to have its Exploration POO enter the NEPA review process. When NEPA is completed, the POO will allow for staged exploration drilling of over 700 holes within the Santa Fe Mine Project area, greatly enhancing the potential to expand the project’s gold and silver resources and enhance expanded mining opportunities. The Contributed Funds Agreement allows the BLM to utilize additional personnel to complete the NEPA analysis and provide funding in case of a Federal government shutdown.”

 

About Lahontan Gold Corp

Lahontan Gold Corp. is a Canadian mine development and mineral exploration company that holds, through its US subsidiaries, four top-tier gold and silver exploration properties in the Walker Lane of mining friendly Nevada. Lahontan’s flagship property, the 26.4 km2 Santa Fe Mine project, had past production of 359,202 ounces of gold and 702,067 ounces of silver between 1988 and 1995 from open pit mines utilizing heap-leach processing. The Santa Fe Mine has a Canadian National Instrument 43-101 compliant Indicated Mineral Resource of 1,539,000 oz Au Eq (48,393,000 tonnes grading 0.92 g/t Au and 7.18 g/t Ag, together grading 0.99 g/t Au Eq) and an Inferred Mineral Resource of 411,000 oz Au Eq (16,760,000 grading 0.74 g/t Au and 3.25 g/t Ag, together grading 0.76 g/t Au Eq), all pit constrained (Au Eq is inclusive of recovery, please see Santa Fe Project Technical Report and note below*). The Company plans to continue advancing the Santa Fe Mine project towards production, update the Santa Fe Preliminary Economic Assessment, and drill test its satellite West Santa Fe project during 2025. For more information, please visit our website: www.lahontangoldcorp.com

 

* * Please see the “Preliminary Economic Assessment, NI 43-101 Technical Report, Santa Fe Project”, Authors: Kenji Umeno, P. Eng., Thomas Dyer, PE, Kyle Murphy, PE, Trevor Rabb, P. Geo, Darcy Baker, PhD, P. Geo., and John M. Young, SME-RM; Effective Date: December 10, 2024, Report Date: January 24, 2025. The Technical Report is available on the Company’s website and SEDAR+. Mineral resources are reported using a cut-off grade of 0.15 g/t AuEq for oxide resources and 0.60 g/t AuEq for non-oxide resources. AuEq for the purpose of cut-off grade and reporting the Mineral Resources is based on the following assumptions gold price of US$1,950/oz gold, silver price of US$23.50/oz silver, and oxide gold recoveries ranging from 28% to 79%, oxide silver recoveries ranging from 8% to 30%, and non-oxide gold and silver recoveries of 71%.

 

Qualified Person

Brian J. Maher, M.Sc., CPG-12342, is a “Qualified Person” as defined under Canadian National Instrument 43-101, Standards of Disclosure for Mineral Projects, and has reviewed and approved the content of this news release in respect of all disclosure other than the Mineral Resource Estimate as noted above. Mr. Maher is Vice President-Exploration for Lahontan Gold  and has verified the data disclosed in this news release, including the sampling, analytical and test data underlying the disclosure.

Posted September 25, 2025

Share this news article

MORE or "SLIDER"


Ellis Martin Report: Terry Lynch, CEO of Power Metallic (TSXV: PNPN | OTCQB: PNPNF)

Join Ellis Martin on Money Talk Radio and The Ellis Martin Report for a conversation with Ter... READ MORE

October 2, 2025

Resourceful Women - "Giah Sumalde: Taking Up Space – Resourceful Women Style!"

Resourceful Women in Mining features Giak Sumalde, marketing manager at the Center for Excell... READ MORE

October 2, 2025

Dryden Gold Reports New Gold Discovery at the Hyndman Project High-Grade Channel Sample Assays Leads to a 2026 Drill Program

  Dryden Gold Corp. (TSX-V: DRY) (OTCQB: DRYGF) (FSE: X7W) is pleased to discuss the assay results ... READ MORE

October 2, 2025

P2 Gold: Gabbs Project Exploration Update

P2 Gold Inc. (TSX-V: PGLD) (OTCQB: PGLDF) reports that it has received the Notices of Extension for... READ MORE

October 2, 2025

Prospector Podcast - Kimberly Ann: Lahontan Gold CEO Outlines Company Growth in Nevada

In this episode of the Prospector Podcast, host Michael Fox interviews Kimberly Ann, President &... READ MORE

October 1, 2025

Copyright 2025 The Prospector News