The Prospector News

Rock Tech Lithium Secures $1.4 million in Federal Funding for Georgia Lake Infrastructure Development

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Rock Tech Lithium Secures $1.4 million in Federal Funding for Georgia Lake Infrastructure Development

 

 

 

 

 

  • Pending final due diligence, Rock Tech Lithium Inc. has secured CAD 1.4 million in federal funding through the Government of Canada’s Critical Minerals Infrastructure Fund (CMIF). Rock Tech is one of four critical minerals projects in Northern Ontario selected for this funding.
  • The funding will be used to upgrade and extend a 10-kilometre access road north of Nipigon, Ontario. This road will facilitate the transportation of lithium from the Georgia Lake Project mine site to the proposed downstream Lithium Converter facility in Red Rock, Ontario.

 

Rock Tech Lithium Inc. (TSX-V: RCK) (OTCQX: RCKTF) (FWB: RJIB) (WKN: A1XF0V) is pleased to announce that it has been awarded up to CAD 1.4 million in funding from the Government of Canada’s Critical Minerals Infrastructure Fund, a federal initiative to support the development of clean energy and transportation infrastructure projects in Canada’s critical minerals sector. Pending final due diligence, the funding will be used to upgrade and extend the Fairloch Lake Road to enable the transportation of Lithium-containing spodumene from its Georgia Lake Project mine site. Lake Nipigon Forest Management (a forest management cooperative of Bingwi Neyaashi Anishinaabek, Biinjitiwaabik Zaaging Anishinaabek, Red Rock Indian Band, and Animbiigoo Zaagi’igan Anishinaabek) has been engaged to complete the road construction.

 

Dirk Harbecke, Rock Tech’s CEO commented: “We are honoured to receive this funding to support the development of our Georgia Lake mining project. Unlike many other projects in Ontario, our Georgia Lake project benefits from a highly strategic location with extensive infrastructure already in place. This results in lower development costs compared to more remote projects.”

 

ABOUT ROCK TECH

 

Rock Tech’s vision is to supply the electric vehicle and battery industry with sustainable, locally produced Lithium, targeting a 100% recycling rate. To ensure resilient supply chains, the company plans to build Lithium converters at the doorstep of its customers, beginning with the Company’s proposed Lithium Hydroxide Converter in Guben, Brandenburg, Germany. The second Converter is planned to be built in Red Rock, Ontario, Canada. Rock Tech Lithium plans to source raw material from its own Georgia Lake spodumene project in the Thunder Bay Mining District of Ontario, Canada, and procure from other ESG-compliant mines. Ultimately, Rock Tech’s goal is to create a closed-loop Lithium production system. Rock Tech has gathered one of the strongest teams in the industry to close the most pressing gap in the clean mobility story. The Company has adopted strict environmental, social and governance standards and is developing a proprietary refining process to increase efficiency and sustainability further.

 

 


Jennifer Main, Rock Tech’s ESG Manager at the critical minerals news conference on Oct. 7 in Thunder Bay, ON. (CNW Group/Rock Tech Lithium Inc.)

 

Posted October 9, 2024

Share this news article

MORE or "UNCATEGORIZED"


NIOB Intersects 211+ Metres of Cumulative Pegmatite with Encouraging Nb-REE Exploration Indicators at Seigneurie; Assays Pending

North American Niobium and Critical Minerals Corp. (CSE: NIOB) (FSE: KS82.F) (OTCQB: NIOMF) has dril... READ MORE

April 29, 2026

Guanajuato Silver Announces Year-End and Q4 2025 Results

Guanajuato Silver Company Ltd. (TSX-V:GSVR)(OTCQX:GSVRF) is pleased to announce financial informatio... READ MORE

April 29, 2026

Trident Intersects 15.11 g/t Au over 51.83m from 256.0m in the BK3 Zone at the Contact Lake Gold Project, Saskatchewan

Trident Resources Corp. (TSX-V: ROCK) (OTCQB: TRDTF) (Frankfurt: 6BP0) is pleased to announce assay... READ MORE

April 29, 2026

West Point Gold Intersects 18.3m of 6.05 g/t Au and 35.1m of 2.23 g/t Au, Expanding the High-Grade Northeast Tyro Zone to over 400m of Strike Length and to 300m Depth

West Point Gold Corp. (TSX-V: WPG) (OTCQB: WPGCF) (FSE: LRA0) is pleased to announce step-out... READ MORE

April 29, 2026

First Quantum Minerals Reports First Quarter 2026 Results

First Quantum Minerals Ltd. (TSX: FM) today reports results for the three months ended March ... READ MORE

April 29, 2026

Copyright 2026 The Prospector News