The Prospector News

Quiulacocha Tailings 40-Hole Drill Campaign: Full Speed Ahead !

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Quiulacocha Tailings 40-Hole Drill Campaign: Full Speed Ahead !

 

 

 

 

 

We are excited to report that Cerro de Pasco Resources Inc. (CDPR) is making significant progress in our Quiulacocha Tailings 40-Hole Drill Campaign. The first batch of drill samples has been safely transported to Lima for geochemical testing. Initial results expected soon will reveal metal concentrations and for the first time involve sampling at foundation depth using 60-element geochemical assays.

 

First drill samples from Quiulacocha Tailings ready for shipment to Bureau Veritas

 

To support our drilling program, we are pleased to introduce a Sonic Drill, which provides continuous, high-quality samples with minimal disturbance and no water usage, reducing environmental impact, enhancing resource recovery, and improving data quality.

 

We remain on track to complete the 40-hole campaign during this dry season, lasting until the end of October, with spirits high as we advance towards our goal!

 

In the upcoming phase, to prevent oxidation and preserve microstructural integrity, samples will be stored and transported to Lima in freezer containers, preventing lab delays and maintaining momentum.

 

 

Upon arrival in Lima, samples will be dried and assayed at the Inspectorate Services Lab (Bureau Veritas). Once geochemical and mineralogical testing is completed, select samples will be blended into representative composites and sent to Bureau Veritas Antofagasta (Chile) for advanced metallurgical testing.

 

 

Meanwhile, CDPR has successfully concluded Phase 1 of our geophysical studies, covering the dry area of the Quiulacocha Tailings, with exciting findings: depth readings range from 20 to over 40 meters in certain areas.

 

3D view of the Quiulacocha TSF, the drilling locations (red dots), the El Metalurgista concession (magenta line), and the geophysical profiles acquired and interpreted to build the 3D solid of the TSF foundation

 

Our aim is to collect over 1,000 samples offering a detailed overview of the project’s potential. We look forward to keeping you in the loop as we progress!

Posted September 27, 2024

Share this news article

MORE or "UNCATEGORIZED"


PTX Metals Inc. Announces Second Closing of Private Placement

PTX Metals Inc. (TSX-V: PTX) is pleased to announce the closing of the second tranche (with an addit... READ MORE

October 2, 2025

Lion One Produces 5,704 Tonnes at 10.60 g/t Gold from First Shrinkage Stope at Tuvatu and Increases Underground Development Rates by 70%

Lion One Metals Limited (TSX-V: LIO) (OTCQX: LOMLF) is pleased to provide an update on mining opera... READ MORE

October 2, 2025

ESGold Secures C$9 Million Strategic Partnership with Ocean Partners as Montauban Progress Accelerates

ESGold Corp. (CSE: ESAU) (OTCQB: ESAUF) (FSE: Z7D) is pleased to announce it has entered into a bind... READ MORE

October 2, 2025

Erdene Announces Updated Resource for the Zuun Mod Molybdenum-Copper Deposit

Erdene Resource Development Corp. (TSX:ERD) (MSE:ERDN) (OTCQB:ERDCD) is pleased to announce a... READ MORE

October 2, 2025

Copper Giant Achieves Up To 92% Copper And 97% Molybdenum Recoveries In Latest Metallurgical Testwork At Mocoa

Copper Giant Resources Corp. (TSX-V: CGNT) (OTCQB: LBCMF) (FRA: 29H0) announces results from i... READ MORE

October 2, 2025

Copyright 2025 The Prospector News