The Prospector News

Purepoint Announces Hook Lake Winter Program

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

 

 

 

 

 

 

Purepoint Uranium Group Inc. (TSX VENTURE:PTU) today announced its winter exploration program at the Hook Lake Project in Saskatchewan’s Athabasca Basin. The project is a joint venture with AREVA Resources Canada Inc. and Cameco Corporation and is located immediately north of Patterson Lake where high-grade uranium mineralization has been discovered by the Fission Uranium Corp and Alpha Minerals Inc. Joint Venture.

 

The 2014 diamond drill program will focus on the highly prospective “Patterson Lake Corridor”, the same (electromagnetic) conductive trend that hosts the Patterson Lake South uranium discovery.

 

“We are more than tripling the size of our drill program this year,” said Chris Frostad, Purepoint’s President and CEO. “Based on the positive indicators for uranium deposition at the Hook Lake Project, well-established electromagnetic (EM) conductors and the local discovery of high grade uranium mineralization, the Joint Venture partners are fully supportive of these heightened efforts.”

 

Highlights:

 



--  The "Patterson Corridor" hosts over 35 kilometers of known airborne EM
    conductors on the Hook Lake property. Over 40 ground EM targets remain
    untested and ready for drilling;
--  The program consists of approximately 5,000 metres of diamond drilling
    for a total budget of $2,500,000;
--  During last week's meeting, the Joint Venture partners agreed to proceed
    with the planning and preparation of the 2014 program and budget at
    these levels;
--  On November 27, 2012 the company filed a National Instruments 43-101
    compliant technical report on its Hook Lake uranium project. The report
    can be found on Sedar.com or on Purepoint's website (www.purepoint.ca).
 

 

 

Hook Lake Project

The Hook Lake Project consists of nine claims totaling 28,683 hectares and is situated in the southwestern Athabasca Basin only 5 kilometres northeast of the new high-grade uranium discovery by the Fission/Alpha joint venture. The depth to the Athabasca unconformity is very shallow, ranging from zero to 350 metres. Three prospective structural “corridors” have been defined on the property, each corridor being comprised of multiple EM conductors that have been confirmed to be the results of graphitic metasediments that intersect the Athabasca unconformity.

 

The Patterson Lake Corridor is the same conductive trend along which the Fission/Alpha joint venture has intersected high-grade uranium mineralization, most notably the intercept of 9.08% U3O8 over 54.5 metres in drill hole PLS13-075 including 21.76% U3O8 over 21.5 metres. Within the Hook Lake project, the Patterson Lake Corridor displays geophysical evidence of a complex structural history and, where drill tested, has shown favourable signs of alteration and structural disruption. In 2011, three new claims totaling 2,632 hectares were added to the Hook Lake project due north of where high grade uranium boulders were discovered by Fission/Alpha on their PLS property.

 

About Purepoint

 

Purepoint Uranium Group Inc. is focused on the precision exploration of its eleven projects in the Canadian Athabasca Basin. Purepoint proudly maintains project ventures in the Basin with three of the largest uranium producers in the world, Cameco Corporation, AREVA and Rio Tinto. Established in the Athabasca Basin well before the initial resurgence in uranium earlier last decade, Purepoint is actively advancing a large portfolio of multiple drill targets in the world’s richest uranium region.

Posted October 8, 2013

Share this news article

MORE or "UNCATEGORIZED"


Cameco reports first quarter results, Cigar Lake restart and the continued execution of strategy to support global clean-air transition

Cameco (TSX: CCO) (NYSE: CCJ) reported its consolidated financial... READ MORE

May 7, 2021

ValOre Provides Update on Rhodium Assay Program at Pedra Branca PGE Project: All targets and deposits return rhodium mineralization, highlights of 1.44 and 1.37 g/t Rh from Esbarro deposit, 1.27 g/t Rh from Cedro deposit

ValOre Metals Corp. (TSX‐V: VO) (OTC: KVLQF) (Frankfurt: KEQ0) ... READ MORE

May 7, 2021

Golden Tag Intersects 286.02 g/t Ag.Eq Over 18.43 m and Identifies Mineralized Skarn Shoots 265 m above Fernandez Zone

Golden Tag Resources Ltd. (TSX-V: GOG) (OTCQB: GTAGF) has success... READ MORE

May 6, 2021

Atico Continues to Expand VMS Footprint with High Grade Copper-Gold Intercepts Reporting 3.70% Cu, 2.80 g/t Au, 40.63 g/t Ag and 4.53% Zn over 3.94 meters and Reinitiates Regional Exploration at La Plata Project in Ecuador

Atico Mining Corporation (TSX-V: ATY) (OTC: ATCMF) is pleased to ... READ MORE

May 6, 2021

Falco Closes the Sale of a Portfolio of Net Smelter Return Royalties

Falco Resources Ltd. (TSX-V:FPC) is pleased to announce that it h... READ MORE

May 6, 2021

Copyright 2021 The Prospector News