The Prospector News

Prospector News Podcast – Jeff Clark “We are Due for a Black Swan Event Affecting Gold”

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Prospector News Podcast – Jeff Clark “We are Due for a Black Swan Event Affecting Gold”

 

 

 

 

 

Prospector News Publisher Michael Fox gets to talk to the Gold Advisor Jeff Clark face to face at the New Orleans Investment Conference. The discussion touched on all the various catalysts that may affect the Gold Price in 2024. Including the potential for a Black Swan event. Jeff points out there seems to be one every three years or so (The last one was the Pandemic in 2020). Inflationary and Recessionary pressures will be key to Gold’s direction.

 

Finally, we discuss Jeff’s new Book Pay Dirt and its valuable advice for Investors.

 

Order Pay Dirt Here

Follow the Gold Advisor 

Posted November 15, 2023

Share this news article

MORE or "UNCATEGORIZED"


RPX GOLD FURTHER EXTENDS ZONE OF HIGH-GRADE MINERALIZATION WITHIN THE PEA OPEN PIT, Intersects 25.50 g/t gold over 4.26 metres, including 135.00 g/t gold over 0.71 metres

RPX Gold Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased to announce ... READ MORE

October 7, 2026

Bullion Gold Intersects 1.73 g/t Au Over 13.4 Metres Including 3.80 g/t Au Over 4.4 Metres in DDH TG-04 at Terragold

Bullion Gold Discoveries Corp. (TSX-V: BGD) is pleased to announc... READ MORE

October 7, 2026

SAGA Metals Drills 495.6 m at 37.86% Fe2O3, 5.51% TiO2, 0.273% V2O5 Including 68.2 m at 52.95% Fe2O3, 8.57% TiO2, 0.381% V2O5 at Radar Critical Minerals Project in Labrador

SAGA Metals Corp. (TSX-V: SAGA) (OTCQX SAGMF) (FSE: 20H) a North ... READ MORE

October 7, 2026

Revival Gold Intersects 8.4 g/t Gold over 6.2 Meters and 8.5 g/t Gold over 3.4 Meters Supporting Overall Continuity of Mineralization at the Beartrack-Arnett Joss Target

Revival Gold Inc. (TSX-V: RVG) (OTCQX: RVLGF) is pleased to repor... READ MORE

October 7, 2026

Q2 Metals Extends Near Surface Mineralization 100 Metres North at the Cisco Lithium Project, Intercepting 134.5 Metres at 1.20% Li₂O and 101.6 Metres at 1.02% Li₂O

Highlights: CS26-096: two separate intervals, including: 134.5 m ... READ MORE

October 7, 2026

Copyright 2026 The Prospector News