The Prospector News

Prospector News Podcast – Dr. Dave Lawie “Technology Can Help Bridge the Critical Minerals Gaps”

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Prospector News Podcast – Dr. Dave Lawie “Technology Can Help Bridge the Critical Minerals Gaps”

 

 

 

 

 

Prospector News Publisher Michael Fox sits down in person with Dr Dave Lawie Chief Geoscientist from Imdex at the Resourcing Tomorrow conference in London UK. We continue our discussion on filling the supply gap. This talk centers on the role technology will play in getting more critical resources into the supply chain.

We discuss the role of technology in through the Mine Life:

• Technology in existing mines

• Technology that will get more minerals through the remediation process at the end of a mines life

• Technology that will make the early-stage developments more to production more quickly (Time is Money)

 

Imdex 

Posted December 20, 2023

Share this news article

MORE or "UNCATEGORIZED"


RPX GOLD FURTHER EXTENDS ZONE OF HIGH-GRADE MINERALIZATION WITHIN THE PEA OPEN PIT, Intersects 25.50 g/t gold over 4.26 metres, including 135.00 g/t gold over 0.71 metres

RPX Gold Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased to announce ... READ MORE

October 7, 2026

Bullion Gold Intersects 1.73 g/t Au Over 13.4 Metres Including 3.80 g/t Au Over 4.4 Metres in DDH TG-04 at Terragold

Bullion Gold Discoveries Corp. (TSX-V: BGD) is pleased to announc... READ MORE

October 7, 2026

SAGA Metals Drills 495.6 m at 37.86% Fe2O3, 5.51% TiO2, 0.273% V2O5 Including 68.2 m at 52.95% Fe2O3, 8.57% TiO2, 0.381% V2O5 at Radar Critical Minerals Project in Labrador

SAGA Metals Corp. (TSX-V: SAGA) (OTCQX SAGMF) (FSE: 20H) a North ... READ MORE

October 7, 2026

Revival Gold Intersects 8.4 g/t Gold over 6.2 Meters and 8.5 g/t Gold over 3.4 Meters Supporting Overall Continuity of Mineralization at the Beartrack-Arnett Joss Target

Revival Gold Inc. (TSX-V: RVG) (OTCQX: RVLGF) is pleased to repor... READ MORE

October 7, 2026

Q2 Metals Extends Near Surface Mineralization 100 Metres North at the Cisco Lithium Project, Intercepting 134.5 Metres at 1.20% Li₂O and 101.6 Metres at 1.02% Li₂O

Highlights: CS26-096: two separate intervals, including: 134.5 m ... READ MORE

October 7, 2026

Copyright 2026 The Prospector News