The Prospector News

Probe Gold Discovers New Gold Zones, Grading up to 4.2 g/t Au over 12.8 Metres (cut), at Courvan, Novador Project, Quebec

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Probe Gold Discovers New Gold Zones, Grading up to 4.2 g/t Au over 12.8 Metres (cut), at Courvan, Novador Project, Quebec

 

 

 

 

 

Highlights:

  • Near-surface, Gold Zone discovered along the eastern area of the Courvan Southeast Deposit with significant gold intersections grading up to 4.2 g/t Au over 12.8 metres (cut) (14.3 g/t Au over 12.8 metres uncut), including 224 g/t Au over 0.8 metres.
  • Drilling just east of the Southeast Deposit also yielded up to 14.4 g/t Au over 3.5 metres (cut), with notable intersections of 56.5 g/t Au over 1.0 meter (uncut).
  • At the Bussiere Deposit, expansion drilling revealed thick gold zones, including an intersection of 1.5 g/t Au over 45.0 metres.
  • Results from the condemnation drilling to the East of the Bussière Deposit intersected parallel gold zones grading up 17.8 g/t Au over 3.0 metres (cut) (31.2 g/t Au over 3.0 metres uncut), including 90.4 g/t Au over 1.0 metre, highlighting significant exploration upside remaining for the Novador Project
  • A 50,000-meter infill drill program aimed at resource conversion is currently underway to support the upcoming pre-feasibility study.

 

Probe Gold Inc. (TSX: PRB) (OTCQB: PROBF) is pleased to provide the latest results from the 2024 Courvan Gold Trend drill program on its 100%-owned Novador property located near Val-d’Or, Quebec. Results from thirty (30) drill holes, totaling 7,635 metres, have returned significant, near-surface, gold intercepts from surface to 150 metres vertical depth at the Bussiere and Southeast deposits (see figure 1 and table of selected drill results below). The 2024 summer-fall drill program at Courvan targeted both resource expansion and condemnation drilling. The condemnation drilling program, which was focussed east of the former Bussiere mine, revealed unexpected and significant gold-rich intercepts. In advance of follow-up drilling on the new discovery, the Company will re-evaluate the Courvan 3D model to refine its regional exploration model for the area.

 

David Palmer, President and CEO of Probe, states, “The results from Courvan once again highlight the substantial exploration potential that remains within the Novador project. The recent discovery of thick, high-grade gold mineralization just 150 metres from our development areas suggests strong potential for further exploration breakthroughs as we advance our work on new targets around Novador. Our condemnation program, designed to evaluate areas for future development infrastructure, is also uncovering new mineralized zones, further underscoring Novador’s capacity for remarkable growth. The Val-d’Or East area has proven to be one of Canada’s most fertile gold exploration belts, and we look forward to continued success. To accelerate our timeline toward production, we have initiated a 50,000-meter drill program aimed at completing resource conversion, which will set the stage for our Pre-Feasibility Study anticipated in early 2026.

Additionally, we are expanding our team to ensure we fulfill our strategy of concurrently advancing permitting, the pre-feasibility study, resource growth and new discoveries, at Novador and the new satellite properties. We anticipate that 2025 will be a highly productive and successful year.”

 

These latest drilling results continue to improve our 3D model of Courvan. The mineralization is characterized by a series of shallow-dipping East-West gold-bearing veins situated next to shear zones that cut the Bourlamaque granodiorite batholith. The gold veins encountered are primarily composed of sulphide-bearing quartz-carbonate-tourmaline, and gold is typically associated with centimeter-scale pyrite masses within the veins, as well as zones containing 1% to 5% finely disseminated pyrite in the host rocks. Gold mineralization intersected in the volcanics is associated with a shear zone and sulphide-bearing quartz-carbonate-tourmaline veins. The Bussiere and Southeast deposits remain open laterally and at depth.

 

Selected drill results from 2024 Courvan Bussiere and Southeast deposits drilling program are, as follows:

 

Hole Number From (m) To (m) Length (m) Gold (g/t) Zone
CO-22-310ext 269.5 314.5 45.0 1.5 BM-19 and BM-20
including 296.0 298.0 2.0 7.8 New
including 307.0 308.0 1.0 30.5 BM-20
CO-22-310ext 327.0 352.5 25.5 0.6 BM-22 and BM-23
CO-24-409 342.0 365.0 23.0 0.6 BM-21
CO-24-409 443.0 467.0 24.0 1.0 New
including 449.0 450.5 1.5 13.0 New
CO-24-410 37.0 49.0 12.0 1.2 Bussiere 002
CO-24-410 60.0 61.5 1.5 13.8 Bussiere 003
CO-24-412 173.0 201.0 28.0 1.2 BM-15
including 174.0 175.0 1.0 11.3 BM-15
including 189.0 199.0 10.0 1.2 BM-15
CO-24-413 72.0 91.0 19.0 1.1 BM-15
including 74.0 75.0 1.0 11.1 BM-15
COD-24-06 (Cut) 140.0 143.0 3.0 17.8 Vein BM-10A
COD-24-06 (Uncut) 140.0 143.0 3.0 31.2 Vein BM-10A
including 140.0 141.0 1.0 90.4 Vein BM-10A
COD-24-13 (Cut) 155.0 158.5 3.5 14.4 Courvan SE006
COD-24-13 (Uncut) 155.0 158.5 3.5 16.3 Courvan SE006
including 157.5 158.5 1.0 56.5 Courvan SE006
COD-24-20 164.5 181.0 16.5 0.9 New
including 164.5 170.5 6.0 2.2 New
COD-24-26 139.0 143.0 4.0 3.0 BM-10A
including 139.0 140.0 1.0 10.3 BM-10A
COD-24-29 (Cut) 8.0 20.8 12.8 4.2 Courvan SE001
COD-24-29 (Uncut) 8.0 20.8 12.8 14.3 Courvan SE001
including 12.0 12.8 0.8 224.0 Courvan SE001

(1) All the new analytical results reported in this release and in this table, are presented in core length and cut to 50 g/t Au when needed. True width is estimated between 65 to 95 % of core length. Only grade times thickness above 10.0 g/t Au * m is reported.

 

Figure 1: Surface Map – Courvan Gold Trend new drilling results

 

Qualified Person

 

The scientific and technical content of this press release has been prepared, reviewed, and approved by Mr. Marc Ducharme, P.Geo, Vice President Exploration, who is a “Qualified Person” as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

 

Quality Control

 

During the last drilling program, assay samples were taken from the NQ core by sawing the drill core in half, with one-half sent to a certified commercial laboratory and the other half retained for future reference. A strict QA/QC program was applied to all samples; which includes insertion of mineralized standards and blank samples for each batch of 20 samples. The gold analyses were completed by fire-assayed with an atomic absorption finish on 50 grams of materials. Repeats were carried out by fire-assay followed by gravimetric testing on each sample containing 3.0 g/t gold or more. Total gold analyses (Metallic Sieve) were carried out on the samples which presented a great variation of their gold contents or the presence of visible gold.

 

About Probe’s Novador Project

Since 2016, Probe Gold has been consolidating its land position in the highly prospective Val-d’Or East area in the province of Quebec with a district-scale land package of 685 square kilometres that represents one of the largest land holdings in the Val-d’Or mining camp. The Novador project represents one property block of 175 square kilometres that hosts four past producing mines (Beliveau Mine, Bussiere Mine, Monique Mine and Beaufor Mine) and contains 80% of the Company’s gold resources in Val-d’Or East. Novador is situated in a politically stable and low-cost mining environment that hosts numerous active producers and mills.

 

About Probe Gold:

Probe Gold Inc. is a leading Canadian company focused on the acquisition, exploration, and development of highly prospective gold properties. The Company is well-funded and dedicated to exploring and developing high-quality gold projects. Notably, it owns 100% of its flagship asset, the multimillion-ounce Novador Gold Project in Quebec, as well as an early-stage Detour Gold Quebec project. Probe controls a large land package of approximately 1685-square-kilometres of exploration ground within some of the most prolific gold belts in Quebec. The Company’s recent Novador updated Preliminary Economic Assessment outlines a robust mining plan with an average annual gold production of 255,000 ounces over a 12.6-year mine life.

 

Val-d’Or properties include gold resources totaling 6,728,600 ounces in the Measured and Indicated category and 3,277,100 ounces in the Inferred category along all trends and deposits.

 

Posted November 5, 2024

Share this news article

MORE or "UNCATEGORIZED"


Outcrop Silver Expands High-Grade Silver Resource Potential at The Jimenez Target Intercepting 5.08 Metres Grading 336 Grams Per Tonne Silver Equivalent

Outcrop Silver & Gold Corporation (TSX-V: OCG) (OTCQX: OCGSF) (DE: MRG) is pleased to announc... READ MORE

December 5, 2024

Emerita Intersects 13.15m Grading 1.1% Copper, 1.1% Lead, 3.3% Zinc, 54.63 g/t Silver and 2.71 g/t Gold in Massive Sulphides at El Cura

Emerita Resources Corp. (TSX-V: EMO) (OTCQB: EMOTF) (FSE: LLJA) continues to intersect significant m... READ MORE

December 5, 2024

NexGold Intersects 6.3 metres of 50.81 g/t Au including 635 g/t Au over 0.5 Metres from Visible Gold Core Sample at the C Zone East

NexGold Mining Corp. (TSX-V: NEXG) (OTCQX: NXGCF) is pleased to provide high-grade results from th... READ MORE

December 5, 2024

Nova Minerals Finds Antimony up to 56.7% from Latest Rock Samples at the Stibium prospect on its Estelle Gold and Critical Minerals Project, in Alaska

Nova Minerals Limited (NASDAQ: NVA) (ASX: NVA) (FRA: QM3) is pleased to announce antimony rock chip... READ MORE

December 5, 2024

Canada Nickel Announces Assay Results from Second High Grade Sulphide Intersection at Bannockburn Project

Canada Nickel Company Inc. (TSX-V: CNC) (OTCQX: CNIKF) is pleased to announce assay results for dr... READ MORE

December 5, 2024

Copyright 2024 The Prospector News