The Prospector News

Premier Reports Fourth Quarter and Full Year 2020 Production

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

 

 

 

 

 

Premier Gold Mines Limited (TSX:PG) (OTCPK: PIRGF) is pleased to announce its fourth quarter and full year production results for 2020.

 

Consolidated production highlights:

 

  • Quarterly production of 16,084 ounces of gold and 66,482 ounces of silver
  • Full-year production of 58,443 ounces of gold and 170,457 ounces of silver
  • Annual production from the El Nino Mine at South Arturo exceeded budget by more than 30%

 

Solid production from the Mercedes mine, as a result of the modified mine plan developed during the COVID–19 related care and maintenance period in the second quarter, highlighted strong overall performance in the quarter.  Production from the El Nino deposit at South Arturo continued to perform very well in the fourth quarter, leading to 2020 production significantly above the original annual budget.

 

 

Fourth Quarter and Full Year 2020 Production Results by Mine Site
Q4 Production
(ounces)
Full Year Production
(ounces)
Mine Gold Silver Gold Silver
Mercedes, Mexico 11,185 65,735 34,955 167,917
South Arturo, Nevada 4,899 747 23,488 2,540
Consolidated Production 16,084 66,482 58,443 170,457

 

“While 2020 was a challenging year, we are extremely pleased with this strong finish”, stated Ewan Downie, Chief Executive Officer of Premier. “South Arturo exceeded expectations in 2020 with a winning track record of performance versus plan, and our operations team at Mercedes have defined higher grade resources and executed a revised higher-margin mine plan that has the mine poised for continued success.”

 

Mercedes Mine, Mexico

 

Following the successful turnaround of the Mercedes Mine in the prior reporting period, fourth quarter production was well in line with the revised higher margin operating plan. The production results continue to validate the work carried out earlier in the year designed to reduce dilution and though put, create better operational flexibility, improve productivity, and grade, and reduce costs. New geological modeling, resource estimates and reconciliation processes of the models to the mined production greatly improved the operation’s planning and forecasting and will focus on higher grade resources that are currently being defined.

 

South Arturo Mine, Nevada

 

Underground operations on the El Nino deposit at the South Arturo Joint Venture, operated by Barrick Gold through its subsidiary Nevada Gold Mines, had another exceptional year with production exceeding budget by over 30%. The strong performance was driven by higher production rates that averaged 694 tonnes per day processed.

 

In 2020, drill programs were completed at El Nino, with initial results suggesting the potential to expand underground resources and extend the mine life. Drilling into the upper portion of the planned Phase 1 and Phase 3 deposits to assess heap leach economics in advance of a potential mining decision was also conducted. Phase 3 is under evaluation to determine the economics of an open pit versus an underground operation. A revised mineral resource/reserve estimate for all of the deposits that comprise the South Arturo Joint Venture is planned following receipt of all assays from the 2020 drill program.

 

About Premier

 

Premier is a gold producer and successful exploration and development company with a high-quality portfolio of precious metals projects in proven, accessible and safe mining jurisdictions in Canada, the United States and Mexico. On December 16, 2020, Equinox Gold Corp. (TSX: EQX, NYSE American: EQX) and Premier Gold Mines Limited announced that the companies have entered into a definitive agreement whereby Equinox Gold will acquire all of the outstanding shares of Premier. Concurrently, Premier will spin-out to its shareholders shares of a newly created US-focused gold production and development company to be called i-80 Gold Corp.

 

Stephen McGibbon, P. Geo., Executive Vice President, Corporate and Project Development, is the Qualified Person for the information contained in this press release and is a Qualified Person within the meaning of National Instrument 43-101. The primary assay laboratories for the South Arturo Mine are ALS Chemex Labs (ALS Chemex) and American Assay Labs (American Assay) in Reno, Nevada. For a complete description of sample preparation, analytical methods and QA/QC procedures, refer to the technical report dated March 26, 2018 (effective date December 31, 2017), entitled “Technical Report on the South Arturo Mine, Elko County, State of Nevada, USA” located on Premier’s website and at www.sedar.com.

 

Posted January 20, 2021

Share this news article

MORE or "UNCATEGORIZED"


Kirkland Lake Gold Reports Solid Production in First Quarter 2021

Kirkland Lake Gold Ltd. (TSX:KL) (NYSE:KL) (ASX:KLA) announced pr... READ MORE

April 9, 2021

Ascot Resources Ltd. Announces Closing of C$61,000,000 Bought Deal Financing

Ascot Resources Ltd. (TSX: AOT) (OTCQX: AOTVF) is pleased to ann... READ MORE

April 9, 2021

Rio Tinto reaches agreement with Turquoise Hill Resources on financing plan for Oyu Tolgoi

Rio Tinto has entered into a binding Heads of Agreement with Turq... READ MORE

April 9, 2021

Frontier Lithium Announces Acquisition of the 2.5% Net Smelter Royalty on the PAK Lithium Project

Frontier Lithium Inc. (TSX-V: FL) (OTCQX: LITOF) (FSE: HL2) annou... READ MORE

April 9, 2021

Uranium Energy Corp Completes Financing and Reports Over $110 Million in Cash, Equity and Inventory Holdings as of April 9, 2021

Uranium Energy Corp (NYSE: UEC) is pleased to announce the closin... READ MORE

April 9, 2021

Copyright 2021 The Prospector News