The Prospector News

Premier American Uranium Reports Higher Grades at West Diane, including 5 ft of 0.181% eU₃O₈, as 2026 Drilling Concludes at Kaycee

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Premier American Uranium Reports Higher Grades at West Diane, including 5 ft of 0.181% eU₃O₈, as 2026 Drilling Concludes at Kaycee


Premier American Uranium Inc.
(TSX-V: PUR) (OTCQB: PAUIF) is pleased to report positive final drilling results from the 2026 exploration program at the Company’s wholly-owned Kaycee Project, located in the Powder River Basin of northeastern Wyoming. Drilling at the West Diane target intersected uranium mineralization in 13 of the final 19 holes, including 5 ft grading 0.181% eU₃O₈ in drillhole WD26-025 and 9.5 ft grading 0.094% eU₃O₈ in drillhole WD26-026 (Figure 1).

The 2026 exploration drilling program is now complete, with 99 conventional mud-rotary drillholes totaling 83,085 ft drilled across the Project.

2026 Program Highlights

  • Higher grades highlight continued drilling success at West Diane: Thirteen of the final 19 drillholes, totaling 17,465 ft, intersected uranium mineralization grading at least 0.02% eU₃O₈ (Table 1). Notable results include:
    • WD26-025: 5 ft grading 0.181% eU₃O₈, including 4 ft grading 0.217% and 2 ft grading 0.300% eU₃O₈.
    • WD26-026: 9.5 ft grading 0.094% eU₃O₈, including 3.5 ft grading 0.158% and 2.5 ft grading 0.196% eU₃O₈.
    • WD26-032: 3.5 ft grading 0.145% eU₃O₈, including 3 ft grading 0.166% and 2 ft grading 0.214% eU₃O₈.
    • WD26-036: 4 ft grading 0.086% eU₃O₈, including 3 ft grading 0.101% eU₃O₈, and a separate interval of 2 ft grading 0.060% eU₃O₈.
  • Two mineralized sandstone units confirmed at West Diane: Drilling confirmed the presence of two discrete sandstone host target units within the Fort Union Formation. Uranium mineralization is variably encountered in both the upper and the lower sand units, and in one instance, in the same drillhole (WD26-032).
  • Drilling supports assessment of resource potential: 2026 confirmation drillholes in the West Diane area will be used to validate historic drillhole data, which, in conjunction with modern drilling results, may be sufficient to support anticipated mineral resource estimation.

Colin Healey, CEO of PUR commented, “Our 2026 program set out to drill ~100 holes and was a resounding success, delivering encouraging results across Kaycee. Drilling at the West Diane target had a >70% hit rate for mineralization exceeding 0.02% eU3O8, highlighting the resource potential in this historic area. We are highly encouraged by the latest results, which included the highest-grade reportable intercepts yet drilled in this area, grading as high as 0.3% eU₃O₈ (2 ft) within 5 ft grading 0.181% eU₃O₈ (hole WD26-025). Those kind of results were not isolated to one hole, with WD26-026 intersecting 9.5 ft grading 0.094% eU₃O₈, approaching the thickest mineralized interval reported from this year’s program which we reported in October (10 ft grading 0.064% eU₃O₈ in WD26-012), but notably, at substantially higher Grade x Thickness.

We believe these results provide a strong basis for assessing the resource potential at West Diane, which is expected to be a major focus of off-season activity at Kaycee throughout the winter and spring. Although we ended in the West Diane area, we are excited to return to the Rustler area, where we have secured an additional 1,883 acres to the north and west, positioning us to follow up on exploration opportunities we identified in this year’s program. With the successful completion of the 2026 drill program at Kaycee, we look forward to digging into the data and designing the next exploration steps for the Project. We look forward to providing an update on our exploration and development strategy for the Kaycee project during the off-season, as we fully digest and integrate the data acquired in the 2026 program.”

Table 1. Kaycee Significant Intercepts – October

 

Drillhole Intercept From (ft) To (ft) Thickness (ft) eU3O8%
WD26-020 intersected 965 967.5 2.5 0.034
including 966.5 967 0.5 0.05
and 980 981.5 1.5 0.035
and 987.5 990 2.5 0.035
WD26-021 intersected 941.5 943.5 2 0.033
WD26-022 intersected 880.5 882 1.5 0.029
and 912.5 913.5 1 0.025
WD26-023 intersected 833.5 836 2.5 0.039
and 849 851.5 2.5 0.051
including 849.5 851 1.5 0.059
and 868 870.5 2.5 0.049
including 868.5 869.5 1 0.067
WD26-025 intersected 636 641 5 0.181
including 636.5 640.5 4 0.217
including 637 639 2 0.3
WD26-026 intersected 591.5 594 2.5 0.041
and 598 607.5 9.5 0.094
including 598.5 602 3.5 0.158
including 599.5 602 2.5 0.196
WD26-027 intersected 917.5 919 1.5 0.027
WD26-029 intersected 938 939 1 0.027
WD26-030 intersected 488 489.5 1.5 0.05
including 488.5 489 0.5 0.061
WD26-032 intersected 360 360.5 0.5 0.023
and 747.5 751 3.5 0.145
including 748 751 3 0.166
including 748.5 750.5 2 0.214
WD26-033 intersected 327.5 329 1.5 0.023
WD26-034 intersected 801.5 804.5 3 0.065
including 802 804 2 0.086
including 802.5 803.5 1 0.113
WD26-036 intersected 630 634 4 0.086
including 630.5 633.5 3 0.101
including 632 633 1 0.13
and 640 642 2 0.06
including 640.5 641.5 1 0.084

Notes: Drill holes reported here encountered uranium mineralization at or above a cut-off grade of 0.02% eU₃O₈. Uranium grades cited were calculated from gamma-ray logs measured by Hawkins CBM Logging of Casper, Wyoming, and the cited grades are “equivalent” grades of U3O8. Hawkins CBM Logging’s geophysical probe was calibrated at the US Department of Energy’s Casper, Wyoming test pits in August 2026. No corrections were made for radiometric disequilibrium. Numerous comparisons of eU₃O₈ and chemical assays of PRB core samples indicate that eU₃O₈ is a reasonable indicator of the actual uranium assay. All drill holes are vertical in orientation and the geologic units hosting the uranium mineralization are generally very flat lying, therefore reported thicknesses are considered to approximate or modestly exceed true thicknesses.

 

Figure 1. Kaycee Project Key Targets in 2026

 

 

Figure 2. West Diane 2026 Drill Holes

 

 

Kaycee Project

The Kaycee Project in Wyoming’s Powder River Basin consists of over 42 square miles of mineral rights over a 36-mile mineralized trend hosting more than 110 miles of identified roll fronts (Figure 3). The Project is believed to be the only project in the PRB where all three known historically productive sandstone formations (Wasatch, Fort Union, and Lance) are mineralized and potentially accessible for ISR extraction. PUR’s exploration team are undertaking the largest grass-roots ISR drill program in the United States, with upwards of 400,000 ft of drilling completed since 2023.

PUR anchors one of the strongest exploration portfolios in Wyoming, combining its Cyclone Project in the Great Divide Basin with Kaycee to drive one of the largest ongoing drilling programs in the state and significantly expand its presence in both of the state’s major ISR-amenable uranium districts.

Figure 3. PUR’s Wyoming exploration portfolio, highlighting the Kaycee Project in the Powder River Basin and the Cyclone Project in the Great Divide Basin.

 

 

Qualified Person Statement

The scientific and technical information contained in this news release was reviewed and approved by J.J. Brown, P.G., SME-RM, PUR’s Vice President Exploration, who is a “Qualified Person” as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects. Ms. Brown has verified the data disclosed in this news release, including sampling, analytical, and test data underlying the information contained herein.

The drilling results cited in this news release were derived from conventional mud rotary drill holes and continuously recorded geophysical responses (gamma-ray, spontaneous-potential, and single point resistivity) from a borehole geophysical probe. All drill holes are vertical in orientation and the geologic units hosting the uranium mineralization are generally very flat lying, therefore reported thicknesses are considered to approximate or modestly exceed true thicknesses. Grades of mineralization reported were calculated from the gamma-ray logs following a procedure that was first developed in the early 1960s and is standard practice in the uranium industry. The borehole geophysical logging was carried out by Hawkins CBM of Casper, Wyoming, a highly experienced and skilled geophysical contractor with a well-established history of providing reliable and accurate data.

Other information regarding the Company’s Kaycee Project, including with respect to the Quality Assurance and Quality Control measures applied during the work program can be referenced from the “Technical Report for NI 43-101 Kaycee Uranium Project, Johnson County, Wyoming USA”, dated September 21, 2025, which is available under the Company’s profile on SEDAR +, at www.sedarplus.ca.

About Premier American Uranium Inc.

Premier American Uranium is focused on consolidating, exploring, and developing uranium projects across the United States to strengthen domestic energy security and advance the transition to clean energy. The Company’s extensive land position spans five of the nation’s top uranium districts, with active work programs underway in New Mexico’s Grants Mineral Belt and Wyoming’s Great Divide and Powder River Basins.

Backed by strategic partners including Sachem Cove Partners, IsoEnergy Ltd., Mega Uranium Ltd., and other leading institutional investors, PUR is advancing a portfolio supported by defined resources and high-priority exploration and development targets. Led by a distinguished team with deep expertise in uranium exploration, development, permitting, operations, and uranium-focused M&A, the Company is well positioned as a key player in advancing the U.S. uranium sector.


For More Information, Please Contact:

Premier American Uranium Inc.
Colin Healey, CEO

info@premierur.com
Toll-Free: 1-833-223-4673
Twitter: @PremierAUranium
www.premierur.com

Neither TSX Venture Exchange nor its Regulations Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Posted November 23, 2026

Share this news article

MORE or "UNCATEGORIZED"


55 North Gold Enters into Mineral Exploration Agreement with Marcel Colomb First Nation

55 North Gold Inc. (CSE: FFF) (OTCQB: FFFNF) (FSE: 6YF) is pleased to announce that it has entered i... READ MORE

November 23, 2026

Sitka Gold Announces Strategic Investment of $72.7 Million from AngloGold Ashanti

Sitka Gold Corp. (TSX-V: SIG) (FSE: 1RF) (OTCQX: SITKF) is pleased to announce a strategic partnersh... READ MORE

November 23, 2026

Brunswick Closes Life Offering and First Tranche of Concurrent Non-Brokered Private Placement for Gross Proceeds of $18.6 Million

Brunswick Exploration Inc. (TSX-V: BRW) (OTCQB: BRWXF) (FRANKFURT:1XQ) is pleased to announce the cl... READ MORE

November 23, 2026

Kuya Silver Reports Q3 2026 Financial Results, Updates Progress on Bethania Mine Ramp-Up

Kuya Silver Corporation (CSE: KUYA) (OTCQB: KUYAF) (FSE: 6MR1) is pleased to announce financial and... READ MORE

November 23, 2026

Cadillac Mines Intersects 3.39 Grams Per Tonne Gold Over 8.4 Metres at the Chesterville East Extension Supporting Potential Northeast Expansion of the Open Pit Resource

Cadillac Mines Corporation (TSX: CADY), is pleased to announce additional assay results from diamon... READ MORE

November 23, 2026

Copyright 2026 The Prospector News